Installation services of electrical and mechanical equipment
Details
- Buyer
- LHC
- Supplier(s)
32 suppliers
- Aaron Service Ltd
- AD Construction Group - P&D
- AES Limited
- Amaresco Limited
- Ameresco Ltd.
- APT Controls Group Ltd
- Aran Services Ltd Suffolk
- BREYER
- British Gas Social Housing Ltd
- Crystal Electronics
- Custom Solar Ltd
- E.ON Energy Solutions Limited West Midlands
- Easy Heat Systems Ltde
- Equans Regeneration Limited
- Everwarm Ltd West Lothian
- Gibson Specialist Technical Services
- Insulated Render Systems (Scotland) Limited
- IVOR COOK LTD
- K & T Heating Services Limited
- KENSA Contracting Limited
- Lawtech Group
- Low Carbon Exchange
- Mi-Space (UK) Ltd
- MP Group UK
- SURE MAINTENANCE GROUP LIMITED
- Sustainable Building Services
- SYNERGIZE LIMITED
- The Casey Group (P Casey Land Reclamation) Ltd
- Thermal Earth Ltd
- United Living
- United Living (South) Ltd
- Zing Energy LTD
- Value
- GBP 500,000,000
- Topic
- Building installation work
- Published
- 10 November 2020
- Source
- TedNotices
Tender description
The provision of energy efficiency measures and refurbishment works for domestic and public sector buildings. LHC seeks to establish a framework agreement for energy efficiency measures and associated works. The contract is split into 2 main workstreams. Workstream 1 relates to the provision of 21 individual energy efficiency measures and Workstream 2 is open to organisations that have the ability to undertake all the measures from Workstream 1, as well as associated repair works. Broadly, the energy efficiency measures are grouped under the following categories: insulation, heating systems, control technologies, solar, battery and electric vehicle charging and heat pumps. Detailed information is provided in the tender documentation. Provision of 21 specialist energy efficiency measures and associated works (Workstream 1). Workstream 1 will contain the following annual value bands: • GBP 0 to GBP 750 000 • GBP 500 000-GBP 1.5 million • GBP 1.5 million plus Applicants can only apply to provide services to two of the three value bands stated in Workstream 1 above. The energy efficiency measures are as follows: • A. External Wall Insulation • B. Cavity Wall Insulation • C. Internal Wall Insulation • D. Insulation Materials (Loft) • E. Biomass • F. Solar PV with Battery storage • G. Air to Water Heat Pumps • H. District Heating Interface Units • I. Traditional Boilers • K. Rainscreen and Cladding • L. CHP or CCHP • M. Gas Absorption Heat Pumps • N. Boiler Optimisation Technologies • O. Lighting Controls • P. EV Charging Infrastructure • R. Solar Thermal Systems • S. Building Energy Management Systems • T. Floor Insulation • U. Ground Source Heat Pumps • V. Commercial Boilers • W. Electric Heaters. Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: 1. A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: 1. A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: 1. A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: 1. A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: 1. A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters
Timeline
- Completed: Award date27 October 2020
- Completed: Award published10 November 2020Current notice
About the buyer
LHC is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 45300000 · Building installation work
- 51100000 · Installation services of electrical and mechanical equipment
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@lhc.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@lhc.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@lhc.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@lhc.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@lhc.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@lhc.gov |
52 similar open tenders
See more open tenders related to Installation services of electrical and mechanical equipment.
- Open tender
Property QUDM
- Open tender
Property Works
- Open tender
Continuous Water Quality Monitoring (CWQM)
- Open tender
General Building & Landscaping Works
Related topics
Topics related to Installation services of electrical and mechanical equipment, ranked by notice volume.
- 1,672£138.7bn
- 2,992£331.6bn
- 11,175£1.0tn
- 26,970£1.7tn
- 3,593£717.5bn
Related buyers
Buyers similar to LHC.
- 121£121.6bn
- 79£1.9bn
- 42£6.0bn
- 27£1.8bn
- 20£10.8m
- 19£6.1bn
- 13£1.8bn
- 137£402.6m
- 49£6.8bn
- 5£2.6m
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.
