Awarded contract

Installation services of electrical and mechanical equipment

Details

Buyer
LHC
Value
GBP 500,000,000
Topic
Building installation work
Published
10 November 2020

Tender description

The provision of energy efficiency measures and refurbishment works for domestic and public sector buildings. LHC seeks to establish a framework agreement for energy efficiency measures and associated works. The contract is split into 2 main workstreams. Workstream 1 relates to the provision of 21 individual energy efficiency measures and Workstream 2 is open to organisations that have the ability to undertake all the measures from Workstream 1, as well as associated repair works. Broadly, the energy efficiency measures are grouped under the following categories: insulation, heating systems, control technologies, solar, battery and electric vehicle charging and heat pumps. Detailed information is provided in the tender documentation. Provision of 21 specialist energy efficiency measures and associated works (Workstream 1). Workstream 1 will contain the following annual value bands: • GBP 0 to GBP 750 000 • GBP 500 000-GBP 1.5 million • GBP 1.5 million plus Applicants can only apply to provide services to two of the three value bands stated in Workstream 1 above. The energy efficiency measures are as follows: • A. External Wall Insulation • B. Cavity Wall Insulation • C. Internal Wall Insulation • D. Insulation Materials (Loft) • E. Biomass • F. Solar PV with Battery storage • G. Air to Water Heat Pumps • H. District Heating Interface Units • I. Traditional Boilers • K. Rainscreen and Cladding • L. CHP or CCHP • M. Gas Absorption Heat Pumps • N. Boiler Optimisation Technologies • O. Lighting Controls • P. EV Charging Infrastructure • R. Solar Thermal Systems • S. Building Energy Management Systems • T. Floor Insulation • U. Ground Source Heat Pumps • V. Commercial Boilers • W. Electric Heaters. Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: 1. A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: 1. A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: 1. A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: 1. A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: 1. A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters Provision of 21 specialist Energy Efficiency Measures and Associated Works (Workstream 1). Workstream 1 will contain the following annual value bands: • £0 to £750k • £500k-£1.5m • £1.5million plus Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. The Energy Efficiency measures are as follows: • A – External Wall Insulation • B – Cavity Wall Insulation • C – Internal Wall Insulation • D – Insulation Materials (Loft) • E – Biomass • F – Solar PV with Battery storage • G – Air to Water Heat Pumps • H – District Heating Interface Units • I – Traditional Boilers • K – Rainscreen & Cladding • L – CHP or CCHP • M - Gas Absorption Heat Pumps • N – Boiler Optimisation Technologies • O – Lighting Controls • P – EV Charging Infrastructure • R – Solar Thermal Systems • S – Building Energy Management Systems • T – Floor Insulation • U - Ground Source Heat Pumps • V – Commercial Boilers • W – Electric Heaters

Timeline

  1. Completed: Award date27 October 2020
  2. Completed: Award published10 November 2020
    Current notice

About the buyer

LHC is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.

Relevant CPV codes

  • 45300000 · Building installation work
  • 51100000 · Installation services of electrical and mechanical equipment

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?
Sign-up to enrich

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

52 similar open tenders

See more open tenders related to Installation services of electrical and mechanical equipment.

Explore all open tenders

Related topics

Topics related to Installation services of electrical and mechanical equipment, ranked by notice volume.

View all topics
TopicCountValue
  1. 1,672
    £138.7bn
  2. 2,992
    £331.6bn
  3. 11,175
    £1.0tn
  4. 26,970
    £1.7tn
  5. 3,593
    £717.5bn

Related buyers

Buyers similar to LHC.

View all buyers

Win more public sector contracts

Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.