Heat Pump Tenders
See open heat pump tenders and awarded contracts for the UK public sector.
Heat pump procurement covers air source (ASHP) and ground source (GSHP) installations, most often replacing a gas boiler as part of a decarbonisation retrofit at a school, fire station, housing block or hospital site. Housing associations and combined authorities run much of the volume, frequently as one measure inside a wider low-carbon retrofit programme rather than a standalone heat pump contract.
Stotles tracks 3,065 heat pump notices to date, with 1,282 already awarded.
2,992 results
- Expired contractPublished 8 February 2024
Liskeard Hub - stage 2 D&B
£9,050,000
- Awarded contractPublished 8 February 2024
Project Consultants to manage a project for dual contracts for the installation of Air Source Heat Pumps and Solar Photovoltaic Cells and other associated works at 3 sites.
£216,969
- Stale Pre-tenderPublished 5 February 2024
The Sample Management Capability (SMC) - PIN 1 Market Sounding Event
Value not stated
- Stale Pre-tenderPublished 5 February 2024
The Sample Management Capability (SMC)
£10,000,000
- Closed tenderPublished 2 February 2024
NOE CPC Specialist Estates Engineering & Maintenance Services (Hard FM)
£835,000,000
- Stale Pre-tenderPublished 2 February 2024
Preliminary Market Consultation - Green Heat Retrofit Challenge
Value not stated
- Stale Pre-tenderPublished 1 February 2024
Supply, Delivery and Commissioning of a 5 Stage Mixed- Suspension, Mixed-Product Removal (MSMPR) system
£350,000
- Stale Pre-tenderPublished 1 February 2024
Supply, Delivery and Commissioning of a 5 Stage Mixed- Suspension, Mixed-Product Removal (MSMPR) system
£350,000
- Expired contractPublished 1 February 2024
Heating Project
£201,908
- Awarded contractPublished 31 January 2024
Multi-Party Framework Agreement for Local Area Minor Construction Works for Dublin City Council 2023-2027
Value not stated
- Closed tenderPublished 31 January 2024
Utility Supply and Energy Management Solutions Framework
£400,000,000
- Closed tenderPublished 31 January 2024
UL0889 - University of Limerick Main Building Blocks C, D and E - Medium Retrofit with High Temperature Air Source Heat Pump under Higher Education EEDPP 2023
Value not stated
- Expired contractPublished 30 January 2024
PS23457 - Trusted messengers for Climate and Environmental Action and Awareness
£79,725
- Expired contractPublished 26 January 2024
Retrofit Works- Installation of Air Source Heat Pumps and associated heating system upgrades
£933,192.13
- Closed tenderPublished 24 January 2024
DEEP FABRIC RETROFIT WITH LOW TEMEPERATURE HEAT PUMP, PHASE 1 TO SETU WATERFORD, SCIENCE AND ENGINEERING BUILDING.
€75,000
- Awarded contractPublished 23 January 2024
Contract For Refurbishment at Wrexham
Value not stated
- Closed tenderPublished 23 January 2024
Padnall Hall Building Works, Refurbishment and Conversion
£1,425,230
- Awarded contractPublished 23 January 2024
GFP Decarbonisation Delivery Framework - Scotland
£230,000,000
- Awarded contractPublished 23 January 2024
GFP Decarbonisation Delivery Framework - Scotland
£230,000,000
- Closed tenderPublished 23 January 2024
Refurbishment & Conversion of Padnall Hall
£1,400,000
Frequently asked questions
Frequently asked questions about heat pump, ASHP, GSHP in the UK public sector.
What counts as a heat pump tender?
A heat pump tender covers the supply, installation or design of an air source (ASHP) or ground source (GSHP) heat pump, whether as a standalone replacement for an existing heating system or as one measure inside a wider retrofit or decarbonisation project.
Who buys heat pump installations in the public sector?
Housing associations, combined authorities, NHS trusts and fire and rescue services are frequent buyers, usually replacing a gas-fired heating system at a single site as part of a low-carbon retrofit. Councils also run larger multi-site retrofit programmes covering housing stock or public buildings.
Is a heat pump usually installed on its own or as part of a wider project?
Most often as part of something wider. A heat pump swap frequently sits inside a bigger decarbonisation or fabric-first retrofit project covering insulation, controls and ancillary equipment at the same time, rather than going out as its own isolated tender.
What's the difference between ASHP and GSHP procurement?
An air source heat pump (ASHP) draws heat from outside air and is the more common retrofit choice for an existing building. A ground source heat pump (GSHP) needs ground loops or boreholes, so it shows up more often in new-build or larger estate projects where that groundwork is already planned.
Win more Heat Pump Tenders contracts with Stotles
Get Heat Pump Tenders alerts, buyer intelligence and bid tools, all in one place.
