REPLACEMENT DISABLED ACCESS LIFT FOR SV GLENLEE (THE TALL SHIP GLENLEE)
Details
- Supplier(s)
- Saltire Lifts LTD
- Value
- GBP 51,829
- Topic
- Lifts, skip hoists, hoists, escalators and moving walkways
- Published
- 10 February 2026
Tender description
The historic vessel, The Tall Ship Glenlee requires a replacement accessibility lift to be purchased and installed using funds from Museums Galleries Scotland Repair and Adaptation Fund. Contractor turnkey project requirement definition:- 1. Lift as presently configured with four access/ egress levels in weather deckhouse, ‘tween decks, mezzanine deck, hold, DDA compliant. 2. Platform lift capable of carrying a minimum load of 450kg and have a capacity alternatively for 5 persons. 3. Power – single phase 220 V AC. 4. Capable of operation in up to 2 degrees of ship list and 1 degree change of fore and aft trim of ship. 5. Does not need to meet fire evacuation requirements. 6. Design must accommodate the limited pit depth of <150mm. 7. Meet or exceed 2006/42CE. 8. All works must comply with CDM regs. 9. Lift must be capable of a minimum of 20 operational cycles per hour. 10. Normal duty cycle is 8 hours per day with some operational days of up to 24 hours per day. 11. A five-year warranty on all parts and labour/ hours is required. 12. A five-year maintenance package is required. 13. A key control is required to avoid unauthorised operations. 14. Turnkey project for removal of all components of old lift installation and installation and commissioning of new lift. 15. All responsibility for measurements, design, removal of old equipment and materials arisings from site. 16. All transportation of equipment and materials, lifting and craneage are part of the turnkey contract. 17. All works must comply with relevant Health and Safety at Work Act requirements. 18. Insurance must be provided for a sum of GBP 10 million pounds for any one occurrence. 19. Product liability insurance in the sum of GBP 10 million pounds in the aggregate and professional indemnity insurance in the aggregate. Client site works: - Works on essential support steel substructures for lift in lower hull steelwork blasting inspection, any necessary strengthening and protective coating whilst old lift removed must be completed before new lift installation. Lot 1: Contractor turnkey project requirement definition:- 1. Lift as presently configured with four access/ egress levels in weather deckhouse, ‘tween decks, mezzanine deck, hold, DDA compliant. 2. Platform lift capable of carrying a minimum load of 450kg and have a capacity alternatively for 5 persons. 3. Power – single phase 220 V AC. 4. Capable of operation in up to 2 degrees of ship list and 1 degree change of fore and aft trim of ship. 5. Does not need to meet fire evacuation requirements. 6. Design must accommodate the limited pit depth of <150mm. 7. Meet or exceed 2006/42CE. 8. All works must comply with CDM regs. 9. Lift must be capable of a minimum of 20 operational cycles per hour. 10. Normal duty cycle is 8 hours per day with some operational days of up to 24 hours per day. 11. A five-year warranty on all parts and labour/ hours is required. 12. A five-year maintenance package is required. 13. A key control is required to avoid unauthorised operations. 14. Turnkey project for removal of all components of old lift installation and installation and commissioning of new lift. 15. All responsibility for measurements, design, removal of old equipment and materials arisings from site. 16. All transportation of equipment and materials, lifting and craneage are part of the turnkey contract. 17. All works must comply with relevant Health and Safety at Work Act requirements. 18. Insurance must be provided for a sum of GBP10 million pounds for any one occurrence. 19. Product liability insurance in the sum of GBP10 million pounds in the aggregate and professional indemnity insurance in the aggregate. Client site works: - Works on essential support steel substructures for lift in lower hull steelwork blasting inspection, any necessary strengthening and protective coating whilst old lift removed must be completed before new lift installation.
Timeline
- Completed: Award published10 February 2026Current notice
- Completed: Award date10 February 2026
About the buyer
The Tall Ship Glenlee Trust is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 42416000 · Lifts, skip hoists, hoists, escalators and moving walkways
- 42416100 · Lifts
- 42416120 · Goods lifts
- 42416130 · Mechanical lifts
- 42417000 · Elevators and conveyors
- 42419510 · Parts of lifts
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@the-tall-ship-glenlee-trust.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@the-tall-ship-glenlee-trust.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@the-tall-ship-glenlee-trust.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@the-tall-ship-glenlee-trust.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@the-tall-ship-glenlee-trust.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@the-tall-ship-glenlee-trust.gov |
9 similar open tenders
See more open tenders related to REPLACEMENT DISABLED ACCESS LIFT FOR SV GLENLEE (THE TALL SHIP GLENLEE).
- Open tender
Repairs and Maintenance DPS
- Open tender
Repairs and Maintenance DPS
- Open tender
Repairs and Maintenance DPS
- Open tender
T1-5622-ISHA-DPS-Services
- Open tender
T1-5622-ISHA-DPS-Services
- Open tender
Building services
Related buyers
Buyers similar to The Tall Ship Glenlee Trust.
- 650£2.6bn
- 515£5.9bn
- 228£379.0m
- 211£251.0m
- 196£4.0bn
- 194£202.8m
- 186£991.8m
- 175£85.9m
- 164£1.0bn
- 158£346.5m
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.
