Dr Martin Luther King Junior Building and Hartley Pavilion Transformation Refurbishment
Details
- Value
- GBP 38,000,000
- Topic
- Construction work
- Published
- 2 April 2026
- Submission
- 17 April 2026
- Source
- uk:find_a_tender
Tender description
Project Description The works relate to the refurbishment and transformation of two existing Grade 1 Listed Buildings at the Albert Dock, Liverpool. The works are being completed in the Dr Martin Luther King Junior Building (MLK) and Hartley Pavilion (HP) for National Museums Liverpool. The project will create the new International Slavery Museum and the new Maritime Museum and will form part of the Museums overall masterplan for the area. Project Overview The project comprises re-modelling, refurbishing and re-developing the Hartley Pavilion and Dr Martin Luther King Junior building. A description of the works to each of the buildings is detailed below. 1.1 Dr Martin Luther King Junior Building: GIFA 1,459m² / 15,700ft² Planning Permission & Listed Building Consent for: External alterations to MLK including new entrance pavilion, glazed roof lantern to atrium, pedestrian link bridge to connect to Hartley Pavilion, reconfiguration of rooftop plant area with new external plant, new roof finishes, new external doors to west elevation, refurbishment and replacement of existing windows. Internal Demolition & removal of existing internal staircases, formation of two new stair cores. New feature staircase to atrium area. Remodelling of internal areas comprising localised removal of fabric, forming voids & risers. Fabric enhancements to structure. Full refurbishment of internal areas comprising renewal of joinery, finishes, fixtures and fittings and M&E installations. Soft strip works already complete. 1.2 Hartley Pavilion: GIFA 11,209m² / 120,655ft² Planning Permission & Listed Building Consent for: External alterations to HP including new glazed vestibule to main entrance (south elevation), new glazed entrance vestibule dockside elevation (north elevation), replacement glazing including windows and curtain walling, reconfiguration of rooftop plant area with new external plant, associated roof remedial works. Internal alterations comprising full re-modelling and refurbishment to improve exhibitions and visitor facilities. Remodelled stair cores and formation of new stair and lift core. Remodelling of internal areas comprising localised removal of fabric, forming voids & risers. Fabric enhancements to structure. Full refurbishment of internal areas comprising renewal of joinery, finishes, fixtures and fittings and M&E installations. Soft strip works already complete. Fit-out of new restaurant area including commercial kitchen, new shop, new events spaces and lecture theatre on fourth floor.
Timeline
- Completed: Pre-tender published2 April 2026Current notice
About the buyer
National Museums Liverpool is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 45000000 · Construction work
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@national-museums-liverpool.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@national-museums-liverpool.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@national-museums-liverpool.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@national-museums-liverpool.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@national-museums-liverpool.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@national-museums-liverpool.gov |
121 similar open tenders
See more open tenders related to Dr Martin Luther King Junior Building and Hartley Pavilion Transformation Refurbishment.
- Open tender
Property QUDM
- Open tender
Fair Park Regeneration
- Open tender
Plumpton Sports Pavilion
- Open tender
Property Works
- Open tender
UK DTE Projects (various upcoming)
- Open tender
UK DTE Projects (various upcoming)
Related topics
Topics related to Dr Martin Luther King Junior Building and Hartley Pavilion Transformation Refurbishment, ranked by notice volume.
- 1,745£636.1bn
Related buyers
Buyers similar to National Museums Liverpool.
- 2,698£1.7bn
- 906£19.4bn
- 691£8.8bn
- 477£15.4bn
- 433£3.8bn
- 350£20.5m
- 304£370.8m
- 263£233.9m
- 252£578.5m
- 241£10.1bn
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.
