Awarded contract

London Gateway Berth 5 Container Yard Construction

Details

Value
GBP 52,270,000
Duration
1 year
Topic
Works for complete or part construction and civil engineering work
Published
18 March 2026

Tender description

London Gateway (LGW) is planning to develop a container storage yard at London Gateway Port. The yard is located at Berth 5 of the Port. The Works include, but are not limited to, the following elements for the construction of 10 ASC modules on Berth 5 Yard, which are split between works designed by the Employer and works to be designed by the Contractor: Civil and Structure Works (Employer Designed) a) Heavy duty pavements including preparation of subgrade by high energy impact compaction (HEIC) to receive the pavement structure and associated edge restraints b) ASC rails, foundations and cable matt c) ASC buffer foundations and buffers d) Container plinths e) Reefer plinths and frames f) All tie-ins with the Berth 5 quay works, the Berth 4 works and other adjacent works. g) Surface water and hazardous drainage and associated pits h) HV, LV and communications conduits and associated pits i) Potable and fire water mains and associated pits and valves j) Sign post bases and signage k) Line marking l) Fencing and gates and associated controls m) Lightning protection earthing system n) Kerbs, ductwork, metalwork and specialist infrastructure to the landside and waterside interchange areas o) All tie-ins between the port access road and adjacent works p) Reefer and ASC substation buildings including foundations q) Light tower bases, light tower masts, fittings and fixtures. r) Potable and Fire water pumphouses Electrical Works (Design and Construct) a) Cabling works b) Installation of electrical control and protection systems c) Berth 5 ASC / Reefer substations including all switchgear and transformers d) 11kV electrical power installations to ASC cranes e) 11kV electrical power installations to Reefer f) SCADA control and monitoring systems g) LV electrical distribution and installation works including lighting network h) Installation of electrical control and protection systems ## Contract award Title: London Gateway Berth 5 Container Storage Yard Construction

Timeline

  1. Completed: Award published18 March 2026
    Current notice
  2. Completed: Award date18 March 2026
  3. Next: Contract expiry date30 March 2027in 7 months

About the buyer

London Gateway Port Ltd is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.

Relevant CPV codes

  • 45200000 · Works for complete or part construction and civil engineering work

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?
Sign-up to enrich

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

35 similar open tenders

See more open tenders related to London Gateway Berth 5 Container Yard Construction.

Explore all open tenders

Related topics

Topics related to London Gateway Berth 5 Container Yard Construction, ranked by notice volume.

View all topics

Related buyers

Buyers similar to London Gateway Port Ltd.

View all buyers

Win more public sector contracts

Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.