Closed tender

Portsmouth Naval Base Gas Works

Details

Value
£1,500,000
Topic
Mains gas
Published
19 February 2025
Submission
21 March 2025

Tender description

A full review of all gas safety shut off systems within living accommodation and catering blocks to ensure compliancy and to reduce breakdown tasks where the gas system needs manually resetting, then replacing, as necessary. Lot 1: A full review of all gas safety shut off systems within living accommodation and catering blocks to ensure compliancy and to reduce breakdown tasks where the gas system needs manually resetting, then replacing, as necessary. systems (Solenoid valves, extraction systems, gas detection units, forced ventilation interlocks, ect.) and a full review and replacement of obsolete/broken equipment, and replaced with up to date, compliant safety equipment. The short-to-medium term strategy for the NPC for Level 3 Sub-elements shall be based on a hierarchy of solutions that best reflects the future of the particular buildings concerned, for example. 1. Electric Heat Pumps (high temperature, CO2, heat pumps, cascade etc.) 2. Hybrid Heat Pumps (gas fired and air source) 3. Conventional gas fired boilers The solution for a particular building should be based on the following criteria. 1. Opportunity for a district heat network linked to other buildings 2. Pay-back period (given the potentially short asset lifecycle) 3. Thermal performance of the building and requirement for building fabric improvements e.g. double glazing and insulation 4. The requirement for pipework and emitter upgrades 5. Available footprint for internal/external plant 6. Spare capacity in electrical distribution boards, where applicable 7. Lead-time of equipment and installation/commissioning period 8. All works to be kept in alignment with Net Carbon Zero (NCZ) Strategy

Timeline

  1. Completed: Tender published19 February 2025
    Current notice
  2. Completed: Submission date21 March 2025

About the buyer

KBS Maritime is a joint venture between KBR and BAE Systems. The company works as the contractor stationed at Portsmouth Naval Base. A multi-discipline subcontractor framework was awarded in 2024. Novo-K ran that procurement on behalf of KBS. The framework gives KBS a pool of Tier 1 and Tier 2 subcontractors to call off. The four lots cover waterfront, building and construction, professional services and systems. Awarded suppliers must be able to provide services within 30 days.

Over the past 5 years, most of KBS Maritime's contract awards have been in construction work, electrical equipment and lighting, and industrial machinery.

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

Related topics

Topics related to Portsmouth Naval Base Gas Works, ranked by notice volume.

View all topics

Finding public sector work shouldn't be hard

Make your next tender search effortless with Stotles. Set up alerts, find decision maker contacts and never miss a good-fit opportunity again.