Tender description
The Forth Road Bridge VRS (also known as grillages/parapets) consists of over 16km of barriers and parapets on the viaducts and suspended spans. The suspended span grillages conform to the geometrical and strength requirements of the containment level appropriate for the bridge carriageways for speeds up to 50mph. VRS investigations found section loss, cracked welds, corrosion, and paint deterioration of steelwork. Impact damage was noted in some locations. All defects found have a detrimental impact to the VRS capacity to resist impacting loading. The entire length of VRS has deteriorated with significant paint and structural defects identified throughout the length of the VRS. BEAR Scotland are looking to appoint a contractor to design, supply, install and move, as required, a temporary access tent and platform, carry out blasting, steelwork repair, welding and painting to the central grillage. The works involve the installation of bespoke temporary access system working beneath the Forth Road Bridge to carry out blasting, steelwork repairs and painting works. Phase 3 of the refurbishment works include a significant portion of the North Side Span on the central grillage to approximately ~300m. Contractors must have demonstrable experience of similar technically complicated works and be sector scheme approved to NHSS 19A & 20, BS EN 1090 Execution Class 3. The estimated value of this project is 1,750,000 GBP.
Timeline
- Completed: Tender published24 October 2025Current notice
- Completed: Submission date3 November 2025
About the buyer
BEAR Scotland Limited is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 44212100 · Bridge
- 44212120 · Structures of bridges
- 45200000 · Works for complete or part construction and civil engineering work
- 45221000 · Construction work for bridges and tunnels, shafts and subways
- 45221100 · Construction work for bridges
- 45221110 · Bridge construction work
- 45221111 · Road bridge construction work
- 45221115 · Construction work for steel bridges
- 45221119 · Bridge renewal construction work
- 45233124 · Trunk road construction work
- 45262420 · Structural steel erection work for structures
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@bear-scotland-limited.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@bear-scotland-limited.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@bear-scotland-limited.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@bear-scotland-limited.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@bear-scotland-limited.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@bear-scotland-limited.gov |
35 similar open tenders
See more open tenders related to A9000 9 Forth Road Bridge - Grillage Refurbishment Phase 3.
- Open tender
Construction and Development DPS
Related topics
Topics related to A9000 9 Forth Road Bridge - Grillage Refurbishment Phase 3, ranked by notice volume.
- 1,689£69.0bn
Related buyers
Buyers similar to BEAR Scotland Limited.
- 652£2.6bn
- 515£5.9bn
- 229£379.0m
- 212£257.4m
- 198£4.0bn
- 194£202.8m
- 186£991.8m
- 176£88.4m
- 165£1.0bn
- 160£63.4m
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.