Stale Pre-tender

24/033 - South West Scotland Onshore System (SWSOS) Electrification Program

Details

Topic
Primary works for services
Published
30 September 2024

Tender description

Gas Networks Ireland (GNI) operates two compressor stations Brighouse Bay and Beattock, both in located in South Scotland, to transport natural gas from the UK through a pipeline system to Ireland. The natural gas compressors on these compressor station are driven by gas turbines between 6MW and 12MW of rated power. The primary objective of the Electrification Programme is to reduce the use of fuel gas in the operation of the Brighouse Bay and Beattock compressors stations and associated fugitive emissions thereby aiding the reduction of greenhouse gas emission intensity by 50% (from 2010 level) by 2030 as outlined in Gas Networks Ireland's Low Carbon Pledge. The Electrification Programme at both Brighouse Bay and Beattock compressor stations comprises three major components at both stations: 1. construction of a new compressor hall with an EMD and ancillary equipment; 2. construction of a new electrical connection to upgrade the supply capacity to power the new EMD; and 3. the installation of a vent recovery system to capture normally vented gas and return it to the gas network. Lot 1: Gas Networks Ireland (GNI) operates two compressor stations Brighouse Bay and Beattock, both in located in South Scotland, to transport natural gas from the UK through a pipeline system to Ireland. The natural gas compressors on these compressor station are driven by gas turbines between 6MW and 12MW of rated power. The primary objective of the Electrification Programme is to reduce the use of fuel gas in the operation of the Brighouse Bay and Beattock compressors stations and associated fugitive emissions thereby aiding the reduction of greenhouse gas emission intensity by 50% (from 2010 level) by 2030 as outlined in Gas Networks Ireland's Low Carbon Pledge. The Electrification Programme at both Brighouse Bay and Beattock compressor stations comprises three major components at both stations: 1. construction of a new compressor hall with an EMD and ancillary equipment; 2. construction of a new electrical connection to upgrade the supply capacity to power the new EMD; and 3. the installation of a vent recovery system to capture normally vented gas and return it to the gas network.

Timeline

  1. Completed: Pre-tender published30 September 2024
    Current notice

About the buyer

Gas Networks Ireland is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.

Relevant CPV codes

  • 45111290 · Primary works for services
  • 45200000 · Works for complete or part construction and civil engineering work
  • 45250000 · Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry
  • 45310000 · Electrical installation work
  • 45351000 · Mechanical engineering installation works

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?
Sign-up to enrich

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

70 similar open tenders

See more open tenders related to 24/033 - South West Scotland Onshore System (SWSOS) Electrification Program.

Explore all open tenders

Related buyers

Buyers similar to Gas Networks Ireland.

View all buyers

Win more public sector contracts

Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.