Closed tender

Process Hydrogen Capture, Purification, Compression, and Storage

Details

Topic
Construction work
Published
2 March 2023
Submission
17 April 2023

Tender description

This tender is for equipment to enable the capture, purification, compression, and storage of hydrogen rich gas from process equipment or hydrogen generation equipment, and feed-in of this to the existing hydrogen delivery network at the Institute to demonstrate industrial uses. It should include technology recommendations, design, supply, install and commission capable of supporting the Institute's project requirements. The tender will be split into two Lots: Lot1 - gas conditioning unit The Institute is developing or assessing different methods to produce green hydrogen. It is expected that different processes will produce gas mixtures containing hydrogen, carbon dioxide, and moisture or hydrogen, nitrogen, and ammonia. The gas streams may also contain some fine particulate. Tenders are invited to provide turnkey gas conditioning unit prior to the compression and storage of the collected gases. Lot2 - Compression unit The system will require a compressor capable of compressing dry gases: pure and mixed hydrogen, CO, CO2, NH3 prior to their storage. The suction pressure is from 1 to 5 bars and the delivered pressure up to 300 bars.     All and every service and utility needed to fully run the enhanced pilot must be identified within the bid, and typical floor space required for adequate installation and operation. Please give the exact requirements of the following elements plus any other relevant services:    Equipment electrical rating and loadings  Gas requirements, which gas(es) and typical run quantities  Compressed air requirements, pressures, volumes and condition (Pressure systems)   Drainage and water supply provision  LEV extract requirements (ATEX ratings etc)   Fresh air supply needs  Every and all other required services should also be stated  Installation footprint  Weight of installation and if required, any possible point load issues  I.T. requirements and connections  Lighting requirements  Lead in times, install programme and commissioning schedule Lot 1: Lot1 - gas conditioning unit The Institute is developing or assessing different methods to produce green hydrogen. It is expected that different processes will produce gas mixtures containing hydrogen, carbon dioxide, and moisture or hydrogen, nitrogen, and ammonia. The gas streams may also contain some fine particulate. Tenders are invited to provide turnkey gas conditioning unit prior to the compression and storage of the collected gases.

Timeline

  1. Completed: Tender published2 March 2023
    Current notice
  2. Completed: Submission date17 April 2023

About the buyer

MATERIALS PROCESSING INSTITUTE is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.

Relevant CPV codes

  • 45000000 · Construction work

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?
Sign-up to enrich

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

120 similar open tenders

See more open tenders related to Process Hydrogen Capture, Purification, Compression, and Storage.

Explore all open tenders

Related buyers

Buyers similar to MATERIALS PROCESSING INSTITUTE.

View all buyers

Win more public sector contracts

Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.