Hilton Road and Lodge Road Energy Efficiency Bungalows 2023-24
Details
- Value
- GBP 450,000
- Topic
- Construction work
- Published
- 31 January 2023
- Submission
- 10 March 2023
- Source
- uk:procontracts
Tender description
<p>It is proposed that Unitas will be assuming the role of Principal Contractor on this project, and intend to appoint Subcontractors to carry out the works under our overall supervision. The works are separated out into three lots as follows; LOT 1 Asbestos Removal LOT 2 Scaffolding and External Works LOT 3 Internal Works Overall description of works to 17nr properties is as follows: All 131-11 properties will require existing window, door and combination frames to be replaced with insulated SFS POD system, weatherboarding and replacement doors and windows. These will also require renewal of the existing main roof covering, renewal of loft insulation, replacement lead flashings, replacement of all rainwater goods and external building plastics. Dependant upon condition, some bathrooms and kitchens affected by the works may also require replacement. All 130-10 properties will require existing window, door and combination frames to be replaced with insulated SFS POD system, weatherboarding and replacement doors and windows. These will also require renewal of the existing main roof covering, renewal of loft insulation, replacement lead flashings, replacement of all rainwater goods and external building plastics. Dependant upon condition. Some kitchens affected by the works may also require replacement. Where necessary, properties will require renewal of extractor fans, security lights and smoke detectors. All to be completed together with the replacement of sundry items that will require removal and reinstallation to facilitate the installation. All LOTS to be advertised on the open market via Pro-Contract and other portals. Anticipated contract duration is 34 weeks. Proposed mobilisation start date is 01/06/2023 Proposed start on site date of the works is 13/07/2023 The works are to be completed in two sections detailed below: Section 1 start date 13/07/2023, Finish 13/02/2024, duration of 28.2 weeks Section 2 start date 21/08/2023, Finish 02/02/2024, duration of 21.4 weeks</p> Keywords: General Works, Internal Works, Asbestos, Scaffolding
Timeline
- Completed: Tender published31 January 2023Current notice
- Completed: Submission date10 March 2023
About the buyer
Stoke-on-Trent City Council is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 45000000 · Construction work
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@stoke-on-trent-city-council.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@stoke-on-trent-city-council.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@stoke-on-trent-city-council.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@stoke-on-trent-city-council.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@stoke-on-trent-city-council.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@stoke-on-trent-city-council.gov |
117 similar open tenders
See more open tenders related to Hilton Road and Lodge Road Energy Efficiency Bungalows 2023-24.
- Open tender
Property QUDM
- Open tender
Plumpton Sports Pavilion
- Open tender
Property Works
- Open tender
Provision of Contractor Services
Related buyers
Buyers similar to Stoke-on-Trent City Council.
- 926£939.2m
- 839£682.3m
- 773£1.7bn
- 737£14.1bn
- 723£150.4m
- 652£1.1bn
- 641£1.4bn
- 555£18.6bn
- 522£2.8bn
- 502£777.8m
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.
