New build Milford Diagnostics Centre for MRI and CT Diagnostics Imaging at Milford Hospital
Details
- Topic
- Ground-stabilisation work
- Published
- 5 August 2022
- Submission
- 31 August 2022
- Source
- uk:contracts_finder
Tender description
The Royal Surrey NHS Foundation Trust propose to develop a new-build facility for Magnetic Resonance Imaging (MRI) and Computed Tomography Imaging (CTI) at the Milford Hospital, Tuesley Lane, Godalming, Surrey GU7 1UF. The building is single-storey with a link corridor to the existing Rehabilitation Building at Milford Hospital. The building also has plant rooms and a service yard with an acoustic fence to accommodate the mechanical and electrical services at the rear. Associated works include the construction of a new access road from Tuesley Lane that will be initially used for construction, and on completion will be re-surfaced for maintenance, servicing, deliveries and access for waste-bin vehicles. Also proposed is the provision of additional car parking for 18 cars, 3 motorbikes, and 6 bicycle racks, the erection of an electricity substation, and the installation of foul drainage and attenuation soakaway for SUDS drainage The site was considered suitable and viable for this facility as it would help the Royal Surrey NHS Foundation Trust in its quest to be become a pre-eminent cancer hub in the South-East of England. Milford Hospital already provides plain X-Ray and ultrasound facilities and the location of MRI and CT diagnostic imaging will suitably complement the existing facilities and widen the scope of available diagnostic imaging services across the Royal Surrey Hospital sites. Milford Hospital lies in a site of approximately 2.3hectares. It accommodates a 1980s ward block known as the Rehabilitation Building having an area of 1,764m2, a 1½ storey newly refurbished X-Ray block of 122m2, a two-storey Victorian building for Community Services Management offices, a small, detached building shed and a redundant building. The site for the new diagnostics centre is the grassed area to the east of the Rehabilitation Building and bounded by a wooded strip to the north and the east towards Tuesley Lane. The new Milford Diagnostics Building is 1,963.15m2 consists of: · Clinical Facilities: o 2no MRI Scanner Rooms, Control Rooms, Engineering Technical Rooms o 1no CT Scanner Room, Control Room o Patient Cannulation Rooms o Counselling and Interview Rooms o Recovery Rooms o Patient Changing Rooms o Patient WCs o Clean and Dirty Utility Rooms · Staff and Non-Clinical Facilities o Reception o Main Waiting Room o Sub-Waiting Room for CT o Offices o Staff Changing Rooms o Staff WCs · Mechanical and Electrical Services o Service Yard o Plant Room o Generator Room o Medical Gas Storage o Low Voltage Electrical Room o Oil Bunding Tank o Service Void floor in the roof space above the ground floor accommodation with 3no roof access shafts into the service void. o Bin Enclosure o Acoustic Fencing Associated works consist of: · External...
Timeline
- Completed: Tender published5 August 2022Current notice
- Completed: Submission date31 August 2022
About the buyer
Royal Surrey County Hospital NHS Foundation Trust is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 45111230 · Ground-stabilisation work
- 45111240 · Ground-drainage work
- 45112730 · Landscaping work for roads and motorways
- 45113000 · Siteworks
- 45215000 · Construction work for buildings relating to health and social services, for crematoriums and public conveniences
- 45215120 · Special medical building construction work
- 45215143 · Diagnostic screening room construction work
- 45223300 · Parking lot construction work
- 45231400 · Construction work for electricity power lines
- 45233100 · Construction work for highways, roads
- 45233123 · Secondary road construction work
- 45400000 · Building completion work
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@royal-surrey-county-hospital-nhs-foundation-trust.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@royal-surrey-county-hospital-nhs-foundation-trust.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@royal-surrey-county-hospital-nhs-foundation-trust.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@royal-surrey-county-hospital-nhs-foundation-trust.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@royal-surrey-county-hospital-nhs-foundation-trust.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@royal-surrey-county-hospital-nhs-foundation-trust.gov |
38 similar open tenders
See more open tenders related to New build Milford Diagnostics Centre for MRI and CT Diagnostics Imaging at Milford Hospital.
- Open tender
Property Works
- Open tender
General Building & Landscaping Works
- Open tender
Construction and Development DPS
Related topics
Topics related to New build Milford Diagnostics Centre for MRI and CT Diagnostics Imaging at Milford Hospital, ranked by notice volume.
- 15,001£1.2tn
- 11,175£1.0tn
- 26,970£1.7tn
Related buyers
Buyers similar to Royal Surrey County Hospital NHS Foundation Trust.
- 510£239.0m
- 380£5.3bn
- 255£44.8m
- 226£133.8m
- 225£25.7m
- 223£225.1m
- 214£11.7m
- 207£130.8m
- 173£11.2bn
- 172£46.2m
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.
