Refurbishment and Alterations to Ryde Esplanade Train Station
Details
- Topic
- Construction work
- Published
- 14 July 2022
- Submission
- 8 August 2022
- Source
- uk:procontracts
Tender description
<p>The works are for the refurbishment of the currently redundant building at Ryde Esplanade on the northern side at the western end to provide operational accommodate for both SWR and SV comprising: 1. Extension of the concourse between the western cafe concession and the refurbished toilets to provide a covered link to both the existing and reinstate pier and resurfacing of the concourse. 2. Refurbishment of the existing W.Cs. 3. SWR: • ticket hall • ticket office • back office operations room / file storage • staff accommodation – kitchenette / toilet / lockers • Tourist Information Counter (TIC) 4. The refurbishment of the current SWR accommodation and ‘doughnut counter’ at the western elevation to provide a single concession able to operate as a café with glazed façade able to utilise opportunity for alfresco dinning created as a part of the highway works (see attached plan) 5. SV • ticket office • back office operations room / file storage • staff accommodation – kitchenette / toilet / lockers • Storage facility for the Community Rail Partnership (CRP) • The refurbishment of the currently closed public toilets and waiting room in the building on the northern side at the western end • The refurbishment of the existing concession and SV accommodation on the southern elevation to provide either two, three or a larger single concession with glazed façade Items 1 and 2 are the key project achievements, all other project deliverables are listed in priority order thereafter. The term of the contract shall be 16th August 2022 until 31st March 2023. The closing date for receipt of Tenders is 14:00 on 8th August 2022. Potential Contractors proposing to submit a Tender are advised to read all documents contained within the Tender Pack carefully to ensure that they are fully familiar with the nature and extent of the obligations to be accepted by them if their Tender is accepted by the Authority. Potential Contractors should note the Procurement Strategy for this process is to engage a Preferred Contractor following the conclusion of the Stage 1 tender process. At this point, the Preferred Contractor will enter into a Pre-Contract Services Agreement (PCSA) for an 8-week period which will allow the Preferred Contractor to work collaboratively with the Project Team to achieve a scheme capable of delivery within the quality, programme and budgetary requirements which are stipulated within the Key Project Deliverables of the Project Brief Document. Stage 2 will act as an enabler to the project through the undertaking of investigative works, enabling construction and/or deconstruction works. Mobilising at this stage will reduce the overall project duration and inform the design development before the financial close of the project at the conclusion of Stage 2. This should serve to reduce the risk profile for unforeseen works. The Contractor who is in second place following the Stage 1 tender evaluation will be held in reserve and may be called upon to commence Stage 2 of the process if the Preferred Contractor is not able to provide a solution that is deliverable within the financial and programme parameters during the designated stage 2 period. At the end of Stage 2 and if a developed scheme is in line with the Key Project Deliverables and project funding then the Authority and Preferred Contractor will enter a JCT Contract which will be further detailed during the stage 2 process. However, if the Preferred Contractor is not able to provide a solution that is deliverable within the financial and programme parameters during the designated stage 2 8-week period the Authority may terminate the procedure with the Preferred Contractor with immediate effect. If this happens, the Contractor who is in second place following the Stage 1 tender evaluation could be called in to commence Stage 2 with the Authority which may include enabling works. The Preferred Contractor shall be required to provide ‘open book’ accounting throughout Stage 2. This Procurement Strategy is further detailed within Section 4 of the Project Brief.</p> Keywords: Refurbishment, Alteration
Timeline
- Completed: Tender published14 July 2022Current notice
- Completed: Submission date8 August 2022
About the buyer
Isle of Wight Council is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 45000000 · Construction work
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@isle-of-wight-council.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@isle-of-wight-council.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@isle-of-wight-council.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@isle-of-wight-council.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@isle-of-wight-council.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@isle-of-wight-council.gov |
120 similar open tenders
See more open tenders related to Refurbishment and Alterations to Ryde Esplanade Train Station.
- Open tender
Property QUDM
- Open tender
Fair Park Regeneration
- Open tender
Plumpton Sports Pavilion
- Open tender
Property Works
- Open tender
UK DTE Projects (various upcoming)
- Open tender
UK DTE Projects (various upcoming)
Related topics
Topics related to Refurbishment and Alterations to Ryde Esplanade Train Station, ranked by notice volume.
- 255£186.6m
- 4,088£269.5bn
Related buyers
Buyers similar to Isle of Wight Council.
- 1,065£982.5m
- 900£690.3m
- 868£1.7bn
- 791£14.1bn
- 753£154.3m
- 712£1.1bn
- 667£1.4bn
- 577£22.6bn
- 545£2.9bn
- 538£266.4m
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.
