Works for complete or part construction and civil engineering work
Details
- Supplier(s)
- Value
- GBP 49,000,000
- Topic
- Floodgates
- Published
- 25 February 2021
- Source
- TedNotices
Tender description
Natural Resources Wales (NRW) is seeking to award a framework for the supply of construction services. The purpose of the requirement is to provide technical civil engineering services for NRW’s flood risk, Reservoirs Act compliance, hydrometry/telemetry, estates and other relevant programmes of work. The location for the delivery of this requirement will be across Wales, subject to the Lot restrictions identified in the tender documentation. The duration of the framework will be 3 years with an option for NRW to extend the framework duration by 1 year. The decision on whether to use the extension option available will be at NRW’s discretion. A briefing session will be held by skype on Friday 4 September 2020 10 a.m. For further details please email: procurement.enquiries@naturalresourceswales.gov.uk Projects delivered under the framework Natural Resources Wales undertakes a diverse range of civil engineering works. Our construction works include, but are not limited to, the following: — flood risk management capital schemes and capital maintenance/repair of flood defence structures on main rivers and coastal areas, — Reservoirs Act (1975) compliance projects, — hydrometric and telemetry assets construction and capital maintenance/repair, — habitat management and creation and environmental land and water remediation, — fish passage improvements, — major estates infrastructure (e.g. bridges). The sections below further outline the envisaged service provisions to be delivered in this lot of the framework, as well as the typical skills/activities required. Construction Works Requirements Although the majority of our work is not overly complex civil engineering, your tender shall demonstrate that you have a high degree of skill, knowledge and experience to enable excellent and efficient delivery. You shall have knowledge and ability in the construction of water industry civil engineering, such as: — flood embankments constructed of earthworks, rock armouring and geotextile materials, — flood walls constructed of reinforced concrete, steel sheet-piling, and precast and prefabricated materials, — flood defence and drainage structures that house pumping stations, penstocks, valves and trash screens, — water retention structures and reservoirs, requiring compliance with the Reservoirs Act, — natural flood management measures, — in river flow measurement structures, such as weirs, — in river fish passage structures, — the construction of features to manage and create a range of habitats, — infrastructure such as simple bridges, — site clearance and demolition, — reinstatement and landscaping, and associated maintenance, — temporary works considerations, including significant water management of river flows and tides, — coordination, communication and consultation with external parties and landowners, including obtaining and complying with consents and permissions. Suppliers shall have personnel at appropriate levels within their organisation who are qualified members of relevant professional organisations, such as the Institution of Civil Engineers (ICE), the Chartered Institution of Water and Environmental Management (CIWEM) or the Royal Institution of Chartered Surveyors (RICS), in addition to technical and support staff. The following services will be provided under the framework lot: — construction of civil engineering and associated works, — early contractor advice, during feasibility, appraisal and design, — principal contractor role under the CDM Regulations (2015), — undertake various surveys, investigations and assessments to inform project scoping and design and to manage risks, — emergency works, to repair threatened, failing or failed assets. Works information and scope for call-off contracts under this framework will be agreed on the basis of project-specific requirements. Projects delivered under the framework Natural Resources Wales undertakes a diverse range of civil engineering works. Our construction works include, but are not limited to, the following: — flood risk management capital schemes and capital maintenance/repair of flood defence structures on main rivers and coastal areas, — Reservoirs Act (1975) compliance projects, — hydrometric and telemetry assets construction and capital maintenance/repair, — habitat management and creation and environmental land and water remediation, — fish passage improvements, — major estates infrastructure (e.g. bridges). The sections below further outline the envisaged service provisions to be delivered in this Lot of the framework, as well as the typical skills/activities required. Construction Works Requirements Although the majority of our work is not overly complex civil engineering, your tender shall demonstrate that you have a high degree of skill, knowledge and experience to enable excellent and efficient delivery. You shall have knowledge and ability in the construction of water industry civil engineering, such as: — flood embankments constructed of earthworks, rock armouring and geotextile materials, — flood walls constructed of reinforced concrete, steel sheet-piling, and precast and prefabricated materials, — flood defence and drainage structures that house pumping stations, penstocks, valves and trash screens, — water retention structures and reservoirs, requiring compliance with the Reservoirs Act, — natural flood management measures, — in river flow measurement structures, such as weirs, — in river fish passage structures, — the construction of features to manage and create a range of habitats, — infrastructure such as simple bridges, — site clearance and demolition, — reinstatement and landscaping, and associated maintenance, — temporary works considerations, including significant water management of river flows and tides, — coordination, communication and consultation with external parties and landowners, including obtaining and complying with consents and permissions. Suppliers shall have personnel at appropriate levels within their organisation who are qualified members of relevant professional organisations, such as the Institution of Civil Engineers (ICE), the Chartered Institution of Water and Environmental Management (CIWEM) or the Royal Institution of Chartered Surveyors (RICS), in addition to technical and support staff. The following services will be provided under the framework lot: — construction of civil engineering and associated works, — early contractor advice, during feasibility, appraisal and design, — principal contractor role under the CDM Regulations (2015), — undertake various surveys, investigations and assessments to inform project scoping and design and to manage risks, — emergency works, to repair threatened, failing or failed assets. Works information and scope for call-off contracts under this framework will be agreed on the basis of project-specific requirements.
Timeline
- Completed: Award date22 February 2021
- Completed: Award published25 February 2021Current notice
About the buyer
Natural Resources Wales is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 44212382 · Floodgates
- 45110000 · Building demolition and wrecking work and earthmoving work
- 45111000 · Demolition, site preparation and clearance work
- 45111200 · Site preparation and clearance work
- 45111213 · Site-clearance work
- 45112000 · Excavating and earthmoving work
- 45112500 · Earthmoving work
- 45200000 · Works for complete or part construction and civil engineering work
- 45243510 · Embankment works
- 45246000 · River regulation and flood control works
- 45246100 · River-wall construction
- 45246200 · Riverbank protection works
- 45246400 · Flood-prevention works
- 45246410 · Flood-defences maintenance works
- 71311100 · Civil engineering support services
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@natural-resources-wales.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@natural-resources-wales.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@natural-resources-wales.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@natural-resources-wales.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@natural-resources-wales.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@natural-resources-wales.gov |
61 similar open tenders
See more open tenders related to Works for complete or part construction and civil engineering work.
- Open tender
Property Works
- Open tender
UK DTE Projects (various upcoming)
- Open tender
YPO - 000880 Building Envelope Services
Related buyers
Buyers similar to Natural Resources Wales.
- 121£193.0m
- 112£766.8m
- 29£34.0k
- 27£4.2m
- 22£344.9k
- 9£35.5m
- 4£204.3k
- 2,703£1.7bn
- 909£19.4bn
- 696£8.8bn
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.