Works Contractor for Design and Build of NUI Galway Student Accommodation Phase 2 (with Novated Design Team)
Details
- Topic
- Construction work
- Published
- 3 September 2021
- Source
- ie:e_tenders
Tender description
This Project represents Phase 2 of a substantial initiative by NUI Galway to develop a commercially viable, modern, appealing and environmentally friendly student accommodation on campus. The accommodation will be delivered on a phased basis with the first phase required for immediate fitout on 1st July 2021 to allow for adequate setup in advance of the start of the new semester in September 2021. The second phase will be required for immediate fitout on the 1st June 2022 to allow for adequate setup in advance of the new semester in September 2022. The proposed development will be located on a green field site north of the existing Corrib village student accommodation (between the Bioscience Research Building and the Park and Ride facility). The development will consist of the design and construction of 674 no. bedspaces in 125 number apartments, generally arranged in clusters of 4-6 en-suite bedrooms, with communal living area in each unit. Further communal areas & facilities, internal plant/service rooms, refuse storage and covered cycle storage facilities are also provided to serve the entire development. The development will be arranged in four blocks with Block A ranging from four to eight storeys, Block B and D comprising six storeys and Block C comprising four storeys, with associated courtyards, pedestrian access, vehicular access and dropoff and parking facilities for the less mobile. Vehicular access to the development is via the existing Corrib Village access road. The development will include intensive site landscaping & boundary treatment, footpath links to Campus networks, building signage, connections to services and all associated works. A Single Point Design Team including PSDP has been appointed by NUI Galway (refer to prequalification information memorandum) and will be novated to the Works Contractor at Contract Award Stage. The Works Contractor will be fully responsible for the completion of the novated design and the construction of the
Timeline
- Completed: Award published3 September 2021Current notice
- Completed: Award date3 September 2021
About the buyer
National University of Ireland, Galway (NUI Galway) is a public sector buyer in Ireland publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 45000000 · Construction work
- 45100000 · Site preparation work
- 45112700 · Landscaping work
- 45212400 · Accommodation and restaurant buildings
- 45212411 · Hotel construction work
- 45214400 · Construction work for university buildings
- 45310000 · Electrical installation work
- 45313100 · Lift installation work
- 45350000 · Mechanical installations
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@national-university-of-ireland-galway-nui-galway.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@national-university-of-ireland-galway-nui-galway.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@national-university-of-ireland-galway-nui-galway.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@national-university-of-ireland-galway-nui-galway.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@national-university-of-ireland-galway-nui-galway.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@national-university-of-ireland-galway-nui-galway.gov |
151 similar open tenders
See more open tenders related to Works Contractor for Design and Build of NUI Galway Student Accommodation Phase 2 (with Novated Design Team).
- Open tender
Property QUDM
- Open tender
Plumpton Sports Pavilion
- Open tender
Property Works
- Open tender
Provision of Contractor Services
- Open tender
YPO - 000881 Ground Maintenance Services
Related topics
Topics related to Works Contractor for Design and Build of NUI Galway Student Accommodation Phase 2 (with Novated Design Team), ranked by notice volume.
- 4,088£269.5bn
Related buyers
Buyers similar to National University of Ireland, Galway (NUI Galway).
- 46£19.2m
- 46£89.3m
- 43—
- 37£12.3m
- 27£78.6m
- 27£1.2m
- 7£9.1m
- 7£6.9m
- 2£119.1k
- 2£182.5k
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.
