HS2 C1 ALIGN JV - Mechanical and Electrical Installations at the 5 Shafts / Headhouses and 2 Tunnel Portal Buildings
Details
- Value
- GBP 7,500,000
- Topic
- Electrical installations for railways
- Published
- 11 August 2021
- Submission
- 31 August 2021
- Source
- uk:contracts_finder
Tender description
The Contractor (Align JV) has identified a package of works for the Mechanical and Electrical installations associated with our works on the Chiltern Tunnels. The main works locations will be the 5 intervention shafts (Headhouse and Shaft activities) along the route and the 2 tunnel portal buildings at either portal location (north and south). The works cover, but it not limited to the following installations: Mechanical Services / Public Health (ventilation, air conditioning, heating, Fire Fighting, Fire Suppression etc.), Electrical Installations (Electrical services, power supply systems, emergency lighting, fire detection/alarms, BMS, Automatic Control, lighting etc.). The scope will include all necessary containment needed for all the installed systems and also the provision of the containment needed for the follow-on Rail Systems scope. (The provision of lifts at each shaft location may also form part of the scope, and also any minor M&E requirements needed to the Colne Valley Viaduct - TBC). The scope will include the detailed design of the systems (effectively RIBA Stage 4) and through to installation on site (RIBA stage 6) - It is anticipated that there will be a significant design period prior to commencing on site and therefore only companies who have suitable design/management resources (and approach) will be considered. It is anticipated that the package will be awarded to 1 tenderer (to ensure a consistent design and common equipment utilisation) and be assessed against a commercial (price) and technical split - it is anticipated that the split will recognise some key technical requirements from the successful tenderer (Design capability/Management/Approach (to develop design at RIBA stage 4), Cyber-Security Assessments, Programme, Experience, BIM Capabilities etc.). In July 2017, ALIGN (Bouygues Travaux Publics, Sir Robert McAlpine and Volker Fitzpatrick) won the significant C1 package of the UK High Speed 2 line (HS2). Lot C1 consists of 21.6km of high speed rail infrastructure in a rural environment. This will include a 3.37km viaduct, 15.75km twin-tubes tunnel and five vent shafts handling both piston effect and tunnel ventilation.
Timeline
- Completed: Tender published11 August 2021Current notice
- Completed: Submission date31 August 2021
About the buyer
ALIGN JV (Bouygues Travaux Publics, VolkerFitzpatrick and Sir Robert McAlpine) is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 34632300 · Electrical installations for railways
- 45310000 · Electrical installation work
- 45320000 · Insulation work
- 45330000 · Plumbing and sanitary works
- 45340000 · Fencing, railing and safety equipment installation work
- 45350000 · Mechanical installations
- 45400000 · Building completion work
- 45500000 · Hire of construction and civil engineering machinery and equipment with operator
- 48000000 · Software package and information systems
- 50000000 · Repair and maintenance services
- 51000000 · Installation services (except software)
- 55000000 · Hotel, restaurant and retail trade services
- 70000000 · Real estate services
- 71000000 · Architectural, construction, engineering and inspection services
- 85000000 · Health and social work services
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@align-jv-bouygues-travaux-publics-volkerfitzpatrick-and-sir-robert-mcalpine.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@align-jv-bouygues-travaux-publics-volkerfitzpatrick-and-sir-robert-mcalpine.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@align-jv-bouygues-travaux-publics-volkerfitzpatrick-and-sir-robert-mcalpine.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@align-jv-bouygues-travaux-publics-volkerfitzpatrick-and-sir-robert-mcalpine.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@align-jv-bouygues-travaux-publics-volkerfitzpatrick-and-sir-robert-mcalpine.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@align-jv-bouygues-travaux-publics-volkerfitzpatrick-and-sir-robert-mcalpine.gov |
448 similar open tenders
See more open tenders related to HS2 C1 ALIGN JV - Mechanical and Electrical Installations at the 5 Shafts / Headhouses and 2 Tunnel Portal Buildings.
Related topics
Topics related to HS2 C1 ALIGN JV - Mechanical and Electrical Installations at the 5 Shafts / Headhouses and 2 Tunnel Portal Buildings, ranked by notice volume.
- 5,186£736.1bn
- 165£2.7bn
- 15,001£1.2tn
Related buyers
Buyers similar to ALIGN JV (Bouygues Travaux Publics, VolkerFitzpatrick and Sir Robert McAlpine).
- 2,594£1.6bn
- 1,683£204.6bn
- 1,496£58.1bn
- 1,016£964.6m
- 938£2.2bn
- 880£19.4bn
- 876£688.0m
- 818£1.7bn
- 760£14.1bn
- 731£1.3bn
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.