Safer Faster Isolation Works Phase 2
Details
- Buyer
- Network Rail
- Supplier(s)
- Amey Inabense Joint Venture
- Value
- GBP 4,190,181
- Topic
- Construction work
- Published
- 15 June 2021
- Source
- eu:ted
Tender description
The project is renewing or enhancing existing overhead line switches currently installed between London Paddington and Stockley Bridge (MLN / 0-12¼ milepost) on the Great Western Main Line to the same specification to those already rolled out across the electrified route. To incorporate the same requirements for reliable indication applied to all switches on the GWML beyond 12¼ milepost. The project will provide the switches with remote control functionality from Didcot ECR and the required LV supplies and control systems. The works will include but, not be limited to, the following between Paddington Station and Stockley Junction: • implementation of the OLE electrical sectioning enhancements detailed in the OLE AIP and OLE AIP Addendum; • installation of motorised three-position switches for future use as Circuit Main Earths; • installation of motorised load break sectioning and alternate feed switches (15no.); • updating of existing MOS switches (3no.) at Westbourne Park. Lot 1: The project is renewing or enhancing existing overhead line switches currently installed between London Paddington and Stockley Bridge (MLN / 0-12¼ milepost) on the Great Western Main Line to the same specification to those already rolled out across the electrified route. To incorporate the same requirements for reliable indication applied to all switches on the GWML beyond 12¼ milepost. The project will provide the switches with remote control functionality from Didcot ECR and the required LV supplies and control systems. The works will include but, not be limited to, the following between Paddington Station and Stockley Junction: • implementation of the OLE electrical sectioning enhancements detailed in the OLE AIP and OLE AIP Addendum; • installation of motorised three-position switches for future use as Circuit Main Earths; • installation of motorised load break sectioning and alternate feed switches (15no.); • updating of existing MOS switches (3no.) at Westbourne Park (Portobello Junction) with LV and SCADA Control; • removal of redundant sectioning (overlaps, section insulators and switches) at Old Oak Common; • implementation of a new IEC61850 control system for MOSs/CMEs; • remote control of MOS-capable switches installed by NR Crossrail at West Ealing Sidings.
Timeline
- Completed: Award published15 June 2021Current notice
- Completed: Award date15 June 2021
About the buyer
Network Rail is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 45000000 · Construction work
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@network-rail.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@network-rail.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@network-rail.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@network-rail.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@network-rail.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@network-rail.gov |
117 similar open tenders
See more open tenders related to Safer Faster Isolation Works Phase 2.
- Open tender
Property QUDM
- Open tender
Plumpton Sports Pavilion
- Open tender
Property Works
- Open tender
Provision of Contractor Services
Related buyers
Buyers similar to Network Rail.
- 1,675£204.4bn
- 449£2.1bn
- 364£249.1m
- 351£15.0bn
- 290£2.8bn
- 241£508.7m
- 203£1.0bn
- 139£895.4m
- 114£59.4m
- 96£936.8m
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.