Works for complete or part construction and civil engineering work
Details
- Buyer
- Scottish Canals
- Value
- GBP 60,000,000
- Topic
- Hydraulic installations
- Published
- 20 February 2020
- Submission
- 27 March 2020
- Source
- TedNotices
Tender description
Scottish Canals is looking to establish a framework to deliver engineering and construction work to maintain and develop the canal infrastructure. The value and scope will be defined by the priorities of the Scottish Canals Corporate Plan as well as the Scottish Canals Asset Management Strategy. All work will be subject to securing funding during the life of the framework and no volume or value of work is guaranteed. The type of assets to be worked on include but are not limited to: — powered and manual locks, — powered and manual moving bridges, fixed bridges, — roads and pathways, — aqueducts, — weirs, — reservoirs and feeder channels, — tunnels, — shafts, — culverts, — retaining walls, — embankments and cuttings, — towpaths, — basins, — new and existing small canal side buildings, — new and existing operational buildings, — visitor attractions, — public realm works, — marinas. There may also be elements of design incorporated into the call-offs from the framework. The type of assets to be worked on include but are not limited to: — powered and manual locks, — powered and manual moving bridges, fixed bridges, — roads and pathways, — aqueducts, — weirs, — reservoirs and feeder channels, — tunnels, — shafts, — culverts, — retaining walls, — embankments and cuttings, — towpaths, — basins, — new and existing small canal side buildings, — new and existing operational buildings, — visitor attractions, — public realm works, — marinas. There may also be elements of design incorporated into the call-offs from the framework. The type of assets to be worked on include but are not limited to: — powered and manual locks, — powered and manual moving bridges, fixed bridges, — roads and pathways, — aqueducts, — weirs, — reservoirs and feeder channels, — tunnels, — shafts, — culverts, — retaining walls, — embankments and cuttings, — towpaths, — basins, — new and existing small canal side buildings, — new and existing operational buildings, — visitor attractions, — public realm works, — marinas. There may also be elements of design incorporated into the call-offs from the framework. The type of assets to be worked on include but are not limited to: — powered and manual locks, — powered and manual moving bridges, fixed bridges, — roads and pathways, — aqueducts, — weirs, — reservoirs and feeder channels, — tunnels, — shafts, — culverts, — retaining walls, — embankments and cuttings, — towpaths, — basins, — new and existing small canal side buildings, — new and existing operational buildings, — visitor attractions, — public realm works, — marinas. There may also be elements of design incorporated into the call-offs from the framework. The type of assets to be worked on include but are not limited to: — powered and manual locks, — powered and manual moving bridges, fixed bridges, — roads and pathways, — aqueducts, — weirs, — reservoirs and feeder channels, — tunnels, — shafts, — culverts, — retaining walls, — embankments and cuttings, — towpaths, — basins, — new and existing small canal side buildings, — new and existing operational buildings, — visitor attractions, — public realm works, — marinas. There may also be elements of design incorporated into the call-offs from the framework. The type of assets to be worked on include but are not limited to: — powered and manual locks, — powered and manual moving bridges, fixed bridges, — roads and pathways, — aqueducts, — weirs, — reservoirs and feeder channels, — tunnels, — shafts, — culverts, — retaining walls, — embankments and cuttings, — towpaths, — basins, — new and existing small canal side buildings, — new and existing operational buildings, — visitor attractions, — public realm works, — marinas. There may also be elements of design incorporated into the call-offs from the framework. The type of assets to be worked on include but are not limited to: — powered and manual locks, — powered and manual moving bridges, fixed bridges, — roads and pathways, — aqueducts, — weirs, — reservoirs and feeder channels, — tunnels, — shafts, — culverts, — retaining walls, — embankments and cuttings, — towpaths, — basins, — new and existing small canal side buildings, — new and existing operational buildings, — visitor attractions, — public realm works, — marinas. There may also be elements of design incorporated into the call-offs from the framework. This lot will be made up of the awarded participants of lots 1 to 7. This lot will be used for mini-competitions where not all of the terms governing the provision of the works clearly determine which of lots 1 to 7 should be used to award the call-off. This lot will only be used in conjunction with mini-competitions. The creation of a contractors works framework for delivery of a range of projects across the canal network. The type of assets to be worked on include but are not limited to: — powered and manual locks, — powered and manual moving bridges, fixed bridges, — roads and pathways, — aqueducts, — weirs, — reservoirs and feeder channels, — tunnels, — shafts, — culverts, — retaining walls, — embankments and cuttings, — towpaths, — basins, — new and existing small canal side buildings, — new and existing operational buildings, — visitor attractions, — public realm works, — marinas. There may also be elements of design incorporated into the call-offs from the framework.
Timeline
- Completed: Tender published20 February 2020Current notice
- Completed: Submission date27 March 2020
About the buyer
Scottish Canals is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 43328000 · Hydraulic installations
- 45000000 · Construction work
- 45112700 · Landscaping work
- 45200000 · Works for complete or part construction and civil engineering work
- 45210000 · Building construction work
- 45255400 · Fabrication work
- 45310000 · Electrical installation work
- 90715220 · Industrial site investigation
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@scottish-canals.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@scottish-canals.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@scottish-canals.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@scottish-canals.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@scottish-canals.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@scottish-canals.gov |
179 similar open tenders
See more open tenders related to Works for complete or part construction and civil engineering work.
- Open tender
Property QUDM
- Open tender
Fair Park Regeneration
- Open tender
Plumpton Sports Pavilion
- Open tender
Property Works
Related buyers
Buyers similar to Scottish Canals.
- 83£405.2m
- 76£18.5m
- 61£9.3bn
- 23£3.3m
- 22£3.5m
- 11£2.0m
- 9£15.5m
- 6£4.8m
- 5£259.5k
- 3—
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.