Works for complete or part construction and civil engineering work
Details
- Supplier(s)
- Woodvale Construction Company Limited
- Value
- GBP 4,186,691
- Topic
- Works for complete or part construction and civil engineering work
- Published
- 20 October 2020
- Source
- TedNotices
Tender description
The project is for the provision of waterside shared village community hub and sports facilities at the site of the former Clondermot High School, Irish Street in the Waterside area of Derry City and Strabane District. The project has evolved in response to Derry City and Strabane District Council’s Strategic Outdoor Playing Pitch Development Plan as prioritised by the Waterside Neighbourhood Partnership Board. The project received a funding grant from SEUPB (Special EU Programmes Body) in December 2018. The scheme will result in the decommissioning of an official interface area and its transformation into a vibrant council owned, cross community managed community hub, in which the neighbouring Irish Street and Top of the Hill communities jointly programme and deliver shared education, sport, health and well-being, youth, cultural, and primary and secondary after-school provision on a sustained basis. This contract is envisaged to commence in Jan 2020 for completion aimed at Mar 2021 The project is for the provision of waterside shared village community hub and sports facilities at the site of the former Clondermot High School, Irish Street in the Waterside area of Derry City and Strabane District. The project has evolved in response to Derry City and Strabane District Council’s Strategic Outdoor Playing Pitch Development Plan as prioritised by the Waterside Neighbourhood Partnership Board. The project received a funding grant from SEUPB (Special EU Programmes Body) in December 2018. The scheme will result in the decommissioning of an official interface area and its transformation into a vibrant council owned, cross community managed community hub, in which the neighbouring Irish Street and Top of the Hill communities jointly programme and deliver shared education, sport, health and well-being, youth, cultural, and primary and secondary after-school provision on a sustained basis. This contract is envisaged to commence in January 2020 for completion aimed at March 2021. This contract will be for the development of a ready to use shared Community Hub with sports facilities within the timescale and budget set out below. Derry City and Strabane District Council requires a high quality, sustainable, safe and secure building for this bespoke development. A primary aim is that the building will be able to achieve a CEEQUAL Very Good rating. Planning permission for the development has been granted (LA11/2016/0628/F). The permission and conditions, a nominal site layout and building elevations drawing are attached as Annex A. The Community Hub and sports facilities are located on a 4.88ha site. The Community Hub has circa 1 110 m2 GFA over one storey, and includes: • a reception area; • offices and storerooms; • domestic services and plant rooms; • a multi-purpose Community hall and meeting spaces; • changing Facilities External facilities to be provided include: • 1 Nr full size sand mattress natural turf multi-use pitch suitable for soccer, rugby and Gaelic games including ball stop and perimeter fencing; • 1 Nr full size synthetic soccer pitch including provision for ball stop and perimeter fencing and flood lighting; • 4 Nr floodlit synthetic tennis courts; • 4 Nr floodlit synthetic cricket wicket practice net facilities; • site infrastructure including pedestrian and vehicular access, car parking, site wide drainage, street lighting, etc. A key factor in development plans for the Community Hub will be the ability to provide flexible accommodation within the sphere of the planning approvals. The contractual approach is design and develop, for which the contractor will need to provide a full design team. An exemplar design has been developed by the Council's design team. It is expected that the Contractor's design will not vary the exemplar design to the extent that anything further than a minor amendment planning application will be required.
Timeline
- Completed: Award date25 September 2020
- Completed: Award published20 October 2020Current notice
About the buyer
Derry City & Strabane District Council is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 45200000 · Works for complete or part construction and civil engineering work
- 45210000 · Building construction work
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@derry-city-strabane-district-council.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@derry-city-strabane-district-council.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@derry-city-strabane-district-council.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@derry-city-strabane-district-council.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@derry-city-strabane-district-council.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@derry-city-strabane-district-council.gov |
79 similar open tenders
See more open tenders related to Works for complete or part construction and civil engineering work.
- Open tender
Provision of Contractor Services
Related topics
Topics related to Works for complete or part construction and civil engineering work, ranked by notice volume.
- 11,175£1.0tn
- 26,969£1.7tn
Related buyers
Buyers similar to Derry City & Strabane District Council.
- 362£148.9m
- 136£4.1bn
- 135£19.5m
- 118£103.0m
- 82£120.6m
- 43£5.7m
- 42£4.0m
- 13£13.8m
- 3£1.2m
- 1,090£989.2m
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.