Stale Pre-tender

Construction work for multi-dwelling buildings and individual houses

Details

Value
GBP 5,000,000,000
Topic
District heating
Published
13 August 2020

Tender description

The London Housing Consortium (LHC) (acting as the Central Purchasing Body for the Welsh Procurement Alliance (WPA)), are consulting on the potential establishment of a DPS Agreement for Residential Construction (including any associated community buildings and facilities) across South and Mid-Wales. Please note that market consultation documents will be available from 12:00 noon on the date of publication of this PIN in the OJEU via the online edition TED (and if the date of publication is not a working day, on the next working day) via Procontract: https://procontract.due-north.com/Login. Please see section VI.3 for further details. Residential Construction in Blаеnаu Gwеnt The proposed lot structure consists of 17 lots across 16 South and Mid-Wales counties: Blaenau Gwent; Bridgend; Caerphilly County; Cardiff; Cаrmаrthеnѕhіrе; Ceredigion; North Powys; South Powys; Mеrthуr Tydfil; Monmouthshire; Neath Pоrt Talbot; Nеwроrt; Pembrokeshire; Rhondda Cуnоn Taff; Swansea; Torfaen; Vаlе оf Glаmоrgаn. The Works (including associated Services and / or Supplies) to be delivered include the development of new build housing projects, including ‘Housing’ (housing, bungalows, flats, apartments etc.) and ‘Accommodation’ (sheltered accommodation, care homes, extra care (e.g. dementia) student accommodation etc.). WPA anticipates a wide range of projects being delivered under the DPS, from single smaller sites to complex multi-site projects. This is reflected in a value banded sub-lots structure within each county for delivery of developments of varying sizes: up to 5 units; 5 – 15 units; 16 – 49 units; 50 units and above. It may be that a specialist lot within each county will be included to provide for the construction of Accommodation, in addition to the 4 value-banded lots which would then be specifically for the construction of Housing. The DPS may also provide for the delivery of associated community buildings to residential developments (such as hubs and sporting facilities e.g. meeting places; health and care centres; recreational facilities and libraries). Plus, any associated commercial facilities such as car parks and retail units. Further the DPS may also allow for the refurbishment of existing buildings as part of a new build construction scheme. Residential Construction in Brіdgеnd The proposed lot structure consists of 17 lots across 16 South and Mid-Wales counties: Blaenau Gwent; Bridgend; Caerphilly County; Cardiff; Cаrmаrthеnѕhіrе; Ceredigion; North Powys; South Powys; Mеrthуr Tydfil; Monmouthshire; Neath Pоrt Talbot; Nеwроrt; Pembrokeshire; Rhondda Cуnоn Taff; Swansea; Torfaen; Vаlе оf Glаmоrgаn. The Works (including associated Services and / or Supplies) to be delivered include the development of new build housing projects, including ‘Housing’ (housing, bungalows, flats, apartments etc.) and ‘Accommodation’ (sheltered accommodation, care homes, extra care (e.g. dementia) student accommodation etc.) WPA anticipates a wide range of projects being delivered under the DPS, from single smaller sites to complex multi-site projects. This is reflected in a value banded sub-lots structure within each county for delivery of developments of varying sizes: up to 5 units; 5 – 15 units; 16 – 49 units; 50 units and above. It may be that a specialist lot within each county will be included to provide for the construction of Accommodation, in addition to the 4 value-banded lots which would then be specifically for the construction of Housing. The DPS may also provide for the delivery of associated community buildings to residential developments (such as hubs and sporting facilities e.g. meeting places; health and care centres; recreational facilities and libraries). Plus, any associated commercial facilities such as car parks and retail units. Further the DPS may also allow for the refurbishment of existing buildings as part of a new build construction scheme. Residential Construction in Caerphilly The proposed lot structure consists of 17 lots across 16 South and Mid-Wales counties: Blaenau Gwent; Bridgend; Caerphilly County; Cardiff; Cаrmаrthеnѕhіrе; Ceredigion; North Powys; South Powys; Mеrthуr Tydfil; Monmouthshire; Neath Pоrt Talbot; Nеwроrt; Pembrokeshire; Rhondda Cуnоn Taff; Swansea; Torfaen; Vаlе оf Glаmоrgаn. The Works (including associated Services and / or Supplies) to be delivered include the development of new build housing projects, including ‘Housing’ (housing, bungalows, flats, apartments etc.) and ‘Accommodation’ (sheltered accommodation, care homes, extra care (e.g. dementia) student accommodation etc.) WPA anticipates a wide range of projects being delivered under the DPS, from single smaller sites to complex multi-site projects. This is reflected in a value banded sub-lots structure within each county for delivery of developments of varying sizes: up to 5 units; 5 – 15 units; 16 – 49 units; 50 units and above. It may be that a specialist lot within each county will be included to provide for the construction of Accommodation, in addition to the 4 value-banded lots which would then be specifically for the construction of Housing. The DPS may also provide for the delivery of associated community buildings to residential developments (such as hubs and sporting facilities e.g. meeting places; health and care centres; recreational facilities and libraries). Plus, any associated commercial facilities such as car parks and retail units. Further the DPS may also allow for the refurbishment of existing buildings as part of a new build construction scheme. Residential Construction in Cardiff The proposed lot structure consists of 17 lots across 16 South and Mid-Wales counties: Blaenau Gwent; Bridgend; Caerphilly County; Cardiff; Cаrmаrthеnѕhіrе; Ceredigion; North Powys; South Powys; Mеrthуr Tydfil; Monmouthshire; Neath Pоrt Talbot; Nеwроrt; Pembrokeshire; Rhondda Cуnоn Taff; Swansea; Torfaen; Vаlе оf Glаmоrgаn. The Works (including associated Services and / or Supplies) to be delivered include the development of new build housing projects, including ‘Housing’ (housing, bungalows, flats, apartments etc.) and ‘Accommodation’ (sheltered accommodation, care homes, extra care (e.g. dementia) student accommodation etc.) WPA anticipates a wide range of projects being delivered under the DPS, from single smaller sites to complex multi-site projects. This is reflected in a value banded sub-lots structure within each county for delivery of developments of varying sizes: up to 5 units; 5 – 15 units; 16 – 49 units; 50 units and above. It may be that a specialist lot within each county will be included to provide for the construction of Accommodation, in addition to the 4 value-banded lots which would then be specifically for the construction of Housing. The DPS may also provide for the delivery of associated community buildings to residential developments (such as hubs and sporting facilities e.g. meeting places; health and care centres; recreational facilities and libraries). Plus, any associated commercial facilities such as car parks and retail units. Further the DPS may also allow for the refurbishment of existing buildings as part of a new build construction scheme. Residential Construction in Cаrmаrthеnѕhіrе The proposed lot structure consists of 17 lots across 16 South and Mid-Wales counties: Blaenau Gwent; Bridgend; Caerphilly County; Cardiff; Cаrmаrthеnѕhіrе; Ceredigion; North Powys; South Powys; Mеrthуr Tydfil; Monmouthshire; Neath Pоrt Talbot; Nеwроrt; Pembrokeshire; Rhondda Cуnоn Taff; Swansea; Torfaen; Vаlе оf Glаmоrgаn. The Works (including associated Services and / or Supplies) to be delivered include the development of new build housing projects, including ‘Housing’ (housing, bungalows, flats, apartments etc.) and ‘Accommodation’ (sheltered accommodation, care homes, extra care (e.g. dementia) student accommodation etc.) WPA anticipates a wide range of projects being delivered under the DPS, from single smaller sites to complex multi-site projects. This is reflected in a value banded sub-lots structure within each county for delivery of developments of varying sizes: up to 5 units; 5 – 15 units; 16 – 49 units; 50 units and above. It may be that a specialist lot within each county will be included to provide for the construction of Accommodation, in addition to the 4 value-banded lots which would then be specifically for the construction of Housing. The DPS may also provide for the delivery of associated community buildings to residential developments (such as hubs and sporting facilities e.g. meeting places; health and care centres; recreational facilities and libraries). Plus, any associated commercial facilities such as car parks and retail units. Further the DPS may also allow for the refurbishment of existing buildings as part of a new build construction scheme. Residential Construction in Ceredigion The proposed lot structure consists of 17 lots across 16 South and Mid-Wales counties: Blaenau Gwent; Bridgend; Caerphilly County; Cardiff; Cаrmаrthеnѕhіrе; Ceredigion; North Powys; South Powys; Mеrthуr Tydfil; Monmouthshire; Neath Pоrt Talbot; Nеwроrt; Pembrokeshire; Rhondda Cуnоn Taff; Swansea; Torfaen; Vаlе оf Glаmоrgаn. The Works (including associated Services and / or Supplies) to be delivered include the development of new build housing projects, including ‘Housing’ (housing, bungalows, flats, apartments etc.) and ‘Accommodation’ (sheltered accommodation, care homes, extra care (e.g. dementia) student accommodation etc.) WPA anticipates a wide range of projects being delivered under the DPS, from single smaller sites to complex multi-site projects. This is reflected in a value banded sub-lots structure within each county for delivery of developments of varying sizes: up to 5 units; 5 – 15 units; 16 – 49 units; 50 units and above. It may be that a specialist lot within each county will be included to provide for the construction of Accommodation, in addition to the 4 value-banded lots which would then be specifically for the construction of Housing. The DPS may also provide for the delivery of associated community buildings to residential developments (such as hubs and sporting facilities e.g. meeting places; health and care centres; recreational facilities and libraries). Plus, any associated commercial facilities such as car parks and retail units. Further the DPS may also allow for the refurbishment of existing buildings as part of a new build construction scheme. Residential Construction in Mеrthуr Tydfil. The proposed lot structure consists of 17 lots across 16 South and Mid-Wales counties: Blaenau Gwent; Bridgend; Caerphilly County; Cardiff; Cаrmаrthеnѕhіrе; Ceredigion; North Powys; South Powys; Mеrthуr Tydfil; Monmouthshire; Neath Pоrt Talbot; Nеwроrt; Pembrokeshire; Rhondda Cуnоn Taff; Swansea; Torfaen; Vаlе оf Glаmоrgаn. The Works (including associated Services and / or Supplies) to be delivered include the development of new build housing projects, including ‘Housing’ (housing, bungalows, flats, apartments etc.) and ‘Accommodation’ (sheltered accommodation, care homes, extra care (e.g. dementia) student accommodation etc.) WPA anticipates a wide range of projects being delivered under the DPS, from single smaller sites to complex multi-site projects. This is reflected in a value banded sub-lots structure within each county for delivery of developments of varying sizes: up to 5 units; 5 – 15 units; 16 – 49 units; 50 units and above. It may be that a specialist lot within each county will be included to provide for the construction of Accommodation, in addition to the 4 value-banded lots which would then be specifically for the construction of Housing. The DPS may also provide for the delivery of associated community buildings to residential developments (such as hubs and sporting facilities e.g. meeting places; health and care centres; recreational facilities and libraries). Plus, any associated commercial facilities such as car parks and retail units. Further the DPS may also allow for the refurbishment of existing buildings as part of a new build construction scheme. Residential Construction in Monmouthshire. The proposed lot structure consists of 17 lots across 16 South and Mid-Wales counties: Blaenau Gwent; Bridgend; Caerphilly County; Cardiff; Cаrmаrthеnѕhіrе; Ceredigion; North Powys; South Powys; Mеrthуr Tydfil; Monmouthshire; Neath Pоrt Talbot; Nеwроrt; Pembrokeshire; Rhondda Cуnоn Taff; Swansea; Torfaen; Vаlе оf Glаmоrgаn. The Works (including associated Services and / or Supplies) to be delivered include the development of new build housing projects, including ‘Housing’ (housing, bungalows, flats, apartments etc.) and ‘Accommodation’ (sheltered accommodation, care homes, extra care (e.g. dementia) student accommodation etc.) WPA anticipates a wide range of projects being delivered under the DPS, from single smaller sites to complex multi-site projects. This is reflected in a value banded sub-lots structure within each county for delivery of developments of varying sizes: up to 5 units; 5 – 15 units; 16 – 49 units; 50 units and above. It may be that a specialist lot within each county will be included to provide for the construction of Accommodation, in addition to the 4 value-banded lots which would then be specifically for the construction of Housing. The DPS may also provide for the delivery of associated community buildings to residential developments (such as hubs and sporting facilities e.g. meeting places; health and care centres; recreational facilities and libraries). Plus, any associated commercial facilities such as car parks and retail units. Further the DPS may also allow for the refurbishment of existing buildings as part of a new build construction scheme. Residential Construction in North Powys. The proposed lot structure consists of 17 lots across 16 South and Mid-Wales counties: Blaenau Gwent; Bridgend; Caerphilly County; Cardiff; Cаrmаrthеnѕhіrе; Ceredigion; North Powys; South Powys; Mеrthуr Tydfil; Monmouthshire; Neath Pоrt Talbot; Nеwроrt; Pembrokeshire; Rhondda Cуnоn Taff; Swansea; Torfaen; Vаlе оf Glаmоrgаn. The Works (including associated Services and / or Supplies) to be delivered include the development of new build housing projects, including ‘Housing’ (housing, bungalows, flats, apartments etc.) and ‘Accommodation’ (sheltered accommodation, care homes, extra care (e.g. dementia) student accommodation etc.) WPA anticipates a wide range of projects being delivered under the DPS, from single smaller sites to complex multi-site projects. This is reflected in a value banded sub-lots structure within each county for delivery of developments of varying sizes: up to 5 units; 5 – 15 units; 16 – 49 units; 50 units and above. It may be that a specialist lot within each county will be included to provide for the construction of Accommodation, in addition to the 4 value-banded lots which would then be specifically for the construction of Housing. The DPS may also provide for the delivery of associated community buildings to residential developments (such as hubs and sporting facilities e.g. meeting places; health and care centres; recreational facilities and libraries). Plus, any associated commercial facilities such as car parks and retail units. Further the DPS may also allow for the refurbishment of existing buildings as part of a new build construction scheme. Residential Construction in South Powys. The proposed lot structure consists of 17 lots across 16 South and Mid-Wales counties: Blaenau Gwent; Bridgend; Caerphilly County; Cardiff; Cаrmаrthеnѕhіrе; Ceredigion; North Powys; South Powys; Mеrthуr Tydfil; Monmouthshire; Neath Pоrt Talbot; Nеwроrt; Pembrokeshire; Rhondda Cуnоn Taff; Swansea; Torfaen; Vаlе оf Glаmоrgаn. The Works (including associated Services and / or Supplies) to be delivered include the development of new build housing projects, including ‘Housing’ (housing, bungalows, flats, apartments etc.) and ‘Accommodation’ (sheltered accommodation, care homes, extra care (e.g. dementia) student accommodation etc.) WPA anticipates a wide range of projects being delivered under the DPS, from single smaller sites to complex multi-site projects. This is reflected in a value banded sub-lots structure within each county for delivery of developments of varying sizes: up to 5 units; 5 – 15 units; 16 – 49 units; 50 units and above. It may be that a specialist lot within each county will be included to provide for the construction of Accommodation, in addition to the 4 value-banded lots which would then be specifically for the construction of Housing. The DPS may also provide for the delivery of associated community buildings to residential developments (such as hubs and sporting facilities e.g. meeting places; health and care centres; recreational facilities and libraries). Plus, any associated commercial facilities such as car parks and retail units. Further the DPS may also allow for the refurbishment of existing buildings as part of a new build construction scheme. Residential Construction in Blаеnаu Gwеnt The proposed lot structure consists of 17 lots across 16 South and Mid-Wales counties: Blaenau Gwent; Bridgend; Caerphilly County; Cardiff; Cаrmаrthеnѕhіrе; Ceredigion; North Powys; South Powys; Mеrthуr Tydfil; Monmouthshire; Neath Pоrt Talbot; Nеwроrt; Pembrokeshire; Rhondda Cуnоn Taff; Swansea; Torfaen; Vаlе оf Glаmоrgаn. The Works (including associated Services and / or Supplies) to be delivered include the development of new build housing projects, including ‘Housing’ (housing, bungalows, flats, apartments etc.) and ‘Accommodation’ (sheltered accommodation, care homes, extra care (e.g. dementia) student accommodation etc.) WPA anticipates a wide range of projects being delivered under the DPS, from single smaller sites to complex multi-site projects. This is reflected in a value banded sub-lots structure within each county for delivery of developments of varying sizes: up to 5 units; 5 – 15 units; 16 – 49 units; 50 units and above. It may be that a specialist lot within each county will be included to provide for the construction of Accommodation, in addition to the 4 value-banded lots which would then be specifically for the construction of Housing. The DPS may also provide for the delivery of associated community buildings to residential developments (such as hubs and sporting facilities e.g. meeting places; health and care centres; recreational facilities and libraries). Plus, any associated commercial facilities such as car parks and retail units. Further the DPS may also allow for the refurbishment of existing buildings as part of a new build construction scheme. Residential Construction in Swansea The proposed lot structure consists of 17 lots across 16 South and Mid-Wales counties: Blaenau Gwent; Bridgend; Caerphilly County; Cardiff; Cаrmаrthеnѕhіrе; Ceredigion; North Powys; South Powys; Mеrthуr Tydfil; Monmouthshire; Neath Pоrt Talbot; Nеwроrt; Pembrokeshire; Rhondda Cуnоn Taff; Swansea; Torfaen; Vаlе оf Glаmоrgаn. The Works (including associated Services and / or Supplies) to be delivered include the development of new build housing projects, including ‘Housing’ (housing, bungalows, flats, apartments etc.) and ‘Accommodation’ (sheltered accommodation, care homes, extra care (e.g. dementia) student accommodation etc.) WPA anticipates a wide range of projects being delivered under the DPS, from single smaller sites to complex multi-site projects. This is reflected in a value banded sub-lots structure within each county for delivery of developments of varying sizes: up to 5 units; 5 – 15 units; 16 – 49 units; 50 units and above. It may be that a specialist lot within each county will be included to provide for the construction of Accommodation, in addition to the 4 value-banded lots which would then be specifically for the construction of Housing. The DPS may also provide for the delivery of associated community buildings to residential developments (such as hubs and sporting facilities e.g. meeting places; health and care centres; recreational facilities and libraries). Plus, any associated commercial facilities such as car parks and retail units. Further the DPS may also allow for the refurbishment of existing buildings as part of a new build construction scheme. Residential Construction in Rhondda Cуnоn Taff. The proposed lot structure consists of 17 lots across 16 South and Mid-Wales counties: Blaenau Gwent; Bridgend; Caerphilly County; Cardiff; Cаrmаrthеnѕhіrе; Ceredigion; North Powys; South Powys; Mеrthуr Tydfil; Monmouthshire; Neath Pоrt Talbot; Nеwроrt; Pembrokeshire; Rhondda Cуnоn Taff; Swansea; Torfaen; Vаlе оf Glаmоrgаn. The Works (including associated Services and / or Supplies) to be delivered include the development of new build housing projects, including ‘Housing’ (housing, bungalows, flats, apartments etc.) and ‘Accommodation’ (sheltered accommodation, care homes, extra care (e.g. dementia) student accommodation etc.) WPA anticipates a wide range of projects being delivered under the DPS, from single smaller sites to complex multi-site projects. This is reflected in a value banded sub-lots structure within each county for delivery of developments of varying sizes: up to 5 units; 5 – 15 units; 16 – 49 units; 50 units and above. It may be that a specialist lot within each county will be included to provide for the construction of Accommodation, in addition to the 4 value-banded lots which would then be specifically for the construction of Housing. The DPS may also provide for the delivery of associated community buildings to residential developments (such as hubs and sporting facilities e.g. meeting places; health and care centres; recreational facilities and libraries). Plus, any associated commercial facilities such as car parks and retail units. Further the DPS may also allow for the refurbishment of existing buildings as part of a new build construction scheme. Residential Construction in Blаеnаu Gwеnt The proposed lot structure consists of 17 lots across 16 South and Mid-Wales counties: Blaenau Gwent; Bridgend; Caerphilly County; Cardiff; Cаrmаrthеnѕhіrе; Ceredigion; North Powys; South Powys; Mеrthуr Tydfil; Monmouthshire; Neath Pоrt Talbot; Nеwроrt; Pembrokeshire; Rhondda Cуnоn Taff; Swansea; Torfaen; Vаlе оf Glаmоrgаn. The Works (including associated Services and / or Supplies) to be delivered include the development of new build housing projects, including ‘Housing’ (housing, bungalows, flats, apartments etc.) and ‘Accommodation’ (sheltered accommodation, care homes, extra care (e.g. dementia) student accommodation etc.) WPA anticipates a wide range of projects being delivered under the DPS, from single smaller sites to complex multi-site projects. This is reflected in a value banded sub-lots structure within each county for delivery of developments of varying sizes: up to 5 units; 5 – 15 units; 16 – 49 units; 50 units and above. It may be that a specialist lot within each county will be included to provide for the construction of Accommodation, in addition to the 4 value-banded lots which would then be specifically for the construction of Housing. The DPS may also provide for the delivery of associated community buildings to residential developments (such as hubs and sporting facilities e.g. meeting places; health and care centres; recreational facilities and libraries). Plus, any associated commercial facilities such as car parks and retail units. Further the DPS may also allow for the refurbishment of existing buildings as part of a new build construction scheme. Residential Construction in Pembrokeshire The proposed lot structure consists of 17 lots across 16 South and Mid-Wales counties: Blaenau Gwent; Bridgend; Caerphilly County; Cardiff; Cаrmаrthеnѕhіrе; Ceredigion; North Powys; South Powys; Mеrthуr Tydfil; Monmouthshire; Neath Pоrt Talbot; Nеwроrt; Pembrokeshire; Rhondda Cуnоn Taff; Swansea; Torfaen; Vаlе оf Glаmоrgаn. The Works (including associated Services and / or Supplies) to be delivered include the development of new build housing projects, including ‘Housing’ (housing, bungalows, flats, apartments etc.) and ‘Accommodation’ (sheltered accommodation, care homes, extra care (e.g. dementia) student accommodation etc.) WPA anticipates a wide range of projects being delivered under the DPS, from single smaller sites to complex multi-site projects. This is reflected in a value banded sub-lots structure within each county for delivery of developments of varying sizes: up to 5 units; 5 – 15 units; 16 – 49 units; 50 units and above. It may be that a specialist lot within each county will be included to provide for the construction of Accommodation, in addition to the 4 value-banded lots which would then be specifically for the construction of Housing. The DPS may also provide for the delivery of associated community buildings to residential developments (such as hubs and sporting facilities e.g. meeting places; health and care centres; recreational facilities and libraries). Plus, any associated commercial facilities such as car parks and retail units. Further the DPS may also allow for the refurbishment of existing buildings as part of a new build construction scheme. Residential Construction in Newport The proposed lot structure consists of 17 lots across 16 South and Mid-Wales counties: Blaenau Gwent; Bridgend; Caerphilly County; Cardiff; Cаrmаrthеnѕhіrе; Ceredigion; North Powys; South Powys; Mеrthуr Tydfil; Monmouthshire; Neath Pоrt Talbot; Nеwроrt; Pembrokeshire; Rhondda Cуnоn Taff; Swansea; Torfaen; Vаlе оf Glаmоrgаn. The Works (including associated Services and / or Supplies) to be delivered include the development of new build housing projects, including ‘Housing’ (housing, bungalows, flats, apartments etc.) and ‘Accommodation’ (sheltered accommodation, care homes, extra care (e.g. dementia) student accommodation etc.) WPA anticipates a wide range of projects being delivered under the DPS, from single smaller sites to complex multi-site projects. This is reflected in a value banded sub-lots structure within each county for delivery of developments of varying sizes: up to 5 units; 5 – 15 units; 16 – 49 units; 50 units and above. It may be that a specialist lot within each county will be included to provide for the construction of Accommodation, in addition to the 4 value-banded lots which would then be specifically for the construction of Housing. The DPS may also provide for the delivery of associated community buildings to residential developments (such as hubs and sporting facilities e.g. meeting places; health and care centres; recreational facilities and libraries). Plus, any associated commercial facilities such as car parks and retail units. Further the DPS may also allow for the refurbishment of existing buildings as part of a new build construction scheme. Residential Construction in Neath Pоrt Talbot The proposed lot structure consists of 17 lots across 16 South and Mid-Wales counties: Blaenau Gwent; Bridgend; Caerphilly County; Cardiff; Cаrmаrthеnѕhіrе; Ceredigion; North Powys; South Powys; Mеrthуr Tydfil; Monmouthshire; Neath Pоrt Talbot; Nеwроrt; Pembrokeshire; Rhondda Cуnоn Taff; Swansea; Torfaen; Vаlе оf Glаmоrgаn. The Works (including associated Services and / or Supplies) to be delivered include the development of new build housing projects, including ‘Housing’ (housing, bungalows, flats, apartments etc.) and ‘Accommodation’ (sheltered accommodation, care homes, extra care (e.g. dementia) student accommodation etc.) WPA anticipates a wide range of projects being delivered under the DPS, from single smaller sites to complex multi-site projects. This is reflected in a value banded sub-lots structure within each county for delivery of developments of varying sizes: up to 5 units; 5 – 15 units; 16 – 49 units; 50 units and above. It may be that a specialist lot within each county will be included to provide for the construction of Accommodation, in addition to the 4 value-banded lots which would then be specifically for the construction of Housing. The DPS may also provide for the delivery of associated community buildings to residential developments (such as hubs and sporting facilities e.g. meeting places; health and care centres; recreational facilities and libraries). Plus, any associated commercial facilities such as car parks and retail units. Further the DPS may also allow for the refurbishment of existing buildings as part of a new build construction scheme.

Timeline

  1. Completed: Pre-tender published13 August 2020
    Current notice

About the buyer

LHC is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.

Relevant CPV codes

  • 09323000 · District heating
  • 45211000 · Construction work for multi-dwelling buildings and individual houses
  • 45212000 · Construction work for buildings relating to leisure, sports, culture, lodging and restaurants
  • 45215200 · Construction work for social services buildings
  • 45262700 · Building alteration work
  • 45453100 · Refurbishment work
  • 71321100 · Construction economics services
  • 85311000 · Social work services with accommodation

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?
Sign-up to enrich

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

98 similar open tenders

See more open tenders related to Construction work for multi-dwelling buildings and individual houses.

Explore all open tenders

Related topics

Topics related to Construction work for multi-dwelling buildings and individual houses, ranked by notice volume.

View all topics
TopicCountValue
  1. 1,745
    £636.1bn

Related buyers

Buyers similar to LHC.

View all buyers

Win more public sector contracts

Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.