Waste-treatment plant construction work
Details
- Value
- GBP 683,000,000
- Topic
- Waste incinerators
- Published
- 10 July 2020
- Submission
- 11 September 2020
- Source
- TedNotices
Tender description
North London Waste Authority (the ‘Authority’) is seeking a contractor to design, procure, construct, commission and test a ERF including all associated buildings, infrastructure and landscaping works at its Edmonton EcoPark site in Edmonton, London N18 3AG in relation to the NLHPP (the "Contract"). The Contract also includes training of operational staff by the contractor. The NLHPP is a programme of works to be carried out for the Authority at its ‘EcoPark’ site, in Edmonton, London N18 3AG. The works are the fundamental component in the delivery of the NLHPP and associated works at the Edmonton EcoPark pursuant to a development consent order granted to the Authority on 24 February 2017. The Authority is seeking a contractor to design and construct the following works: (i) the ERF that consists of two identical process lines each comprising moving grate combustion unit, heat recovery boiler, combined flue gas treatment system incorporating selective catalytic reduction, a common turbine-generator/condensing system and all associated auxiliary systems; (ii) all civil engineering, buildings, architectural treatment, utilities connection, landscaping and other site works; (iii) ERF Weighbridges and ancillary offices; (iv) transport offices, workshops and parking for on-site operational vehicles; (v) vehicle wash; (vi) administration/operations offices and staff facilities; (vii) windshield and flues; (viii)) cooling condensers; (ix) raw water pre-treatment plant; (x) ERF Fire Water Tank and associated fire protection systems; (xi) electrical substation, works and connections; (xii) gas compound, works and connections; (xiii) other utility connections including communications and water; (xiv) workshops, stores and maintenance contractors area; and (xv) wastewater treatment plant and associated works. The contractor shall deliver all design, engineering, procurement, construction, commissioning, testing, operator training and handover requirements for the new ERF including all buildings, infrastructure and works. The contractor shall deliver all design, engineering, procurement, construction, commissioning, testing, operator training and handover requirements for the ERF including all associated buildings, infrastructure and landscape works. The contractor shall comply with the requirements of the CDM Regulations 2015 in relation to the roles of the principal contractor and principal designer for this contract. The Authority may require the contractor to provide operational services during the defects liability period. Further details of the required works are set out in the procurement documents. The memorandum of information provides background information on the Authority, the NLHPP and a summary of the key contract terms in relation to these works. The works are on the critical path for the delivery of the NLHPP for the development of a replacement ERF and associated works at the Edmonton EcoPark pursuant to a development consent order (The North London Heat and Power Generating Station Order (2017/215) as amended) granted to the Authority on 24 February 2017. The site for the works, Edmonton EcoPark, is an operational waste management site where LondonEnergy Ltd, a private company wholly owned by the Authority, operates an existing Energy from Waste (‘EfW’) facility. Normal operation of the EfW facility is to be maintained at all times during the construction.
Timeline
- Completed: Tender published10 July 2020Current notice
- Completed: Submission date11 September 2020
About the buyer
North London Waste Authority is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 42320000 · Waste incinerators
- 45200000 · Works for complete or part construction and civil engineering work
- 45210000 · Building construction work
- 45220000 · Engineering works and construction works
- 45222000 · Construction work for engineering works except bridges, tunnels, shafts and subways
- 45222100 · Waste-treatment plant construction work
- 45222110 · Waste disposal site construction work
- 45232140 · District-heating mains construction work
- 45232141 · Heating works
- 45251000 · Construction works for power plants and heating plants
- 45251140 · Thermal power plant construction work
- 45251200 · Heating plant construction work
- 45251250 · District-heating plant construction work
- 51135110 · Installation services of waste incinerators
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@north-london-waste-authority.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@north-london-waste-authority.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@north-london-waste-authority.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@north-london-waste-authority.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@north-london-waste-authority.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@north-london-waste-authority.gov |
110 similar open tenders
See more open tenders related to Waste-treatment plant construction work.
- Open tender
UK DTE Projects (various upcoming)
- Open tender
Provision of Contractor Services
Related topics
Topics related to Waste-treatment plant construction work, ranked by notice volume.
- 27,818£2.2tn
Related buyers
Buyers similar to North London Waste Authority.
- 2,657£1.7bn
- 1,713£205.5bn
- 1,531£58.3bn
- 1,073£985.0m
- 949£2.3bn
- 900£690.3m
- 900£19.4bn
- 868£1.7bn
- 794£14.1bn
- 751£154.2m
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.