Installation services of electrical and mechanical equipment
Details
- Buyer
- Value
- GBP 200,000,000
- Topic
- Installation services of electrical and mechanical equipment
- Published
- 8 January 2020
- Submission
- 10 February 2020
- Source
- TedNotices
Tender description
The provision of Energy Efficiency Measures and Associated Works for Domestic and Public Sector buildings. The SPA seeks to establish a Framework Agreement for Energy Efficiency Measures and Associated Works. The contract is split into 2 main workstreams. Workstream 1 relates to the provision of 21 individual Energy Efficiency Measures and Tenderers can pick and choose the Energy Efficiency measures they wish to bid. Workstream 2 is open to organisations that have the ability to undertake all the measures from Workstream 1, as well as associated repair works. Broadly, the Energy Efficiency Measures are grouped under the following categories; Insulation, heating Systems, Control Technologies, Solar, Battery and Electric Vehicle Charging and Heat pumps. Detailed information is provided in the tender documentation. The provision of Energy Efficiency Measures and Associated Works for Domestic and Public Sector buildings. LHC seeks to establish a Framework Agreement for Energy Efficiency Measures and Associated Works. Workstream 1 relates to the provision of 21 individual Energy Efficiency Measures. Tenderers can pick and choose the Energy Efficiency measures they wish to bid. These are: — A – External Wall Insulation — B – Cavity Wall Insulation — C – Internal Wall Insulation — D – Insulation Materials (Loft) — E – Biomass — F – Solar PV with Battery storage — G – Air to Water Heat Pumps — H – District Heating Interface Units — I – Traditional Boilers — K – Rainscreen & Cladding — L – CHP or CCHP — M – Gas Absorption Heat Pumps — N – Boiler Optimisation Technologies — O – Lighting Controls — P – EV Charging Infrastructure — R – Solar Thermal Systems — S – Building Energy Management Systems — T – Floor Insulation — U – Ground Source Heat Pumps — V – Commercial Boilers — W – Electric Heaters Additional information is provided in the Tender documents. The provision of Energy Efficiency Measures and Refurbishment Works for Domestic and Public Sector buildings. LHC seeks to establish a Framework Agreement for Energy Efficiency Measures and Associated Works. Workstream 1 relates to the provision of 21 individual Energy Efficiency Measures. Tenderers can pick and choose the Energy Efficiency measures they wish to bid. These are: — A – External Wall Insulation — B – Cavity Wall Insulation — C – Internal Wall Insulation — D – Insulation Materials (Loft) — E – Biomass — F – Solar PV with Battery storage — G – Air to Water Heat Pumps — H – District Heating Interface Units — I – Traditional Boilers — K – Rainscreen & Cladding — L – CHP or CCHP — M - Gas Absorption Heat Pumps — N – Boiler Optimisation Technologies — O – Lighting Controls — P – EV Charging Infrastructure — R – Solar Thermal Systems — S – Building Energy Management Systems — T – Floor Insulation — U - Ground Source Heat Pumps — V – Commercial Boilers — W – Electric Heaters Detailed information is provided in the tender documentation. The provision of Energy Efficiency Measures and Refurbishment Works for Domestic and Public Sector buildings. LHC seeks to establish a Framework Agreement for Energy Efficiency Measures and Associated Works. Workstream 1 relates to the provision of 21 individual Energy Efficiency Measures. Tenderers can pick and choose the Energy Efficiency measures they wish to bid. These are: — A – External Wall Insulation — B – Cavity Wall Insulation — C – Internal Wall Insulation — D – Insulation Materials (Loft) — E – Biomass — F – Solar PV with Battery storage — G – Air to Water Heat Pumps — H – District Heating Interface Units — I – Traditional Boilers — K – Rainscreen & Cladding — L – CHP or CCHP — M - Gas Absorption Heat Pumps — N – Boiler Optimisation Technologies — O – Lighting Controls — P – EV Charging Infrastructure — R – Solar Thermal Systems — S – Building Energy Management Systems — T – Floor Insulation — U - Ground Source Heat Pumps — V – Commercial Boilers — W – Electric Heaters The provision of Energy Efficiency Measures and Refurbishment Works for Domestic and Public Sector buildings. LHC seeks to establish a Framework Agreement for Energy Efficiency Measures and Associated Works. Workstream 1 relates to the provision of 21 individual Energy Efficiency Measures. Tenderers can pick and choose the Energy Efficiency measures they wish to bid. These are: — A – External Wall Insulation — B – Cavity Wall Insulation — C – Internal Wall Insulation — D – Insulation Materials (Loft) — E – Biomass — F – Solar PV with Battery storage — G – Air to Water Heat Pumps — H – District Heating Interface Units — I – Traditional Boilers — K – Rainscreen & Cladding — L – CHP or CCHP — M - Gas Absorption Heat Pumps — N – Boiler Optimisation Technologies — O – Lighting Controls — P – EV Charging Infrastructure — R – Solar Thermal Systems — S – Building Energy Management Systems — T – Floor Insulation — U - Ground Source Heat Pumps — V – Commercial Boilers — W – Electric Heaters The provision of Energy Efficiency Measures and Refurbishment Works for Domestic and Public Sector buildings. LHC seeks to establish a Framework Agreement for Energy Efficiency Measures and Associated Works. Workstream 1 relates to the provision of 21 individual Energy Efficiency Measures. Tenderers can pick and choose the Energy Efficiency measures they wish to bid. These are: — A – External Wall Insulation — B – Cavity Wall Insulation — C – Internal Wall Insulation — D – Insulation Materials (Loft) — E – Biomass — F – Solar PV with Battery storage — G – Air to Water Heat Pumps — H – District Heating Interface Units — I – Traditional Boilers — K – Rainscreen & Cladding — L – CHP or CCHP — M - Gas Absorption Heat Pumps — N – Boiler Optimisation Technologies — O – Lighting Controls — P – EV Charging Infrastructure — R – Solar Thermal Systems — S – Building Energy Management Systems — T – Floor Insulation — U - Ground Source Heat Pumps — V – Commercial Boilers — W – Electric Heaters The provision of Energy Efficiency Measures and Refurbishment Works for Domestic and Public Sector buildings. LHC seeks to establish a Framework Agreement for Energy Efficiency Measures and Associated Works. Workstream 1 relates to the provision of 21 individual Energy Efficiency Measures. Tenderers can pick and choose the Energy Efficiency measures they wish to bid. These are: — A – External Wall Insulation — B – Cavity Wall Insulation — C – Internal Wall Insulation — D – Insulation Materials (Loft) — E – Biomass — F – Solar PV with Battery storage — G – Air to Water Heat Pumps — H – District Heating Interface Units — I – Traditional Boilers — K – Rainscreen & Cladding — L – CHP or CCHP — M - Gas Absorption Heat Pumps — N – Boiler Optimisation Technologies — O – Lighting Controls — P – EV Charging Infrastructure — R – Solar Thermal Systems — S – Building Energy Management Systems — T – Floor Insulation — U - Ground Source Heat Pumps — V – Commercial Boilers — W – Electric Heaters The provision of Energy Efficiency Measures and Refurbishment Works for Domestic and Public Sector buildings. LHC seeks to establish a Framework Agreement for Energy Efficiency Measures and Associated Works. Workstream 1 relates to the provision of 21 individual Energy Efficiency Measures. Tenderers can pick and choose the Energy Efficiency measures they wish to bid. These are: — A – External Wall Insulation — B – Cavity Wall Insulation — C – Internal Wall Insulation — D – Insulation Materials (Loft) — E – Biomass — F – Solar PV with Battery storage — G – Air to Water Heat Pumps — H – District Heating Interface Units — I – Traditional Boilers — K – Rainscreen & Cladding — L – CHP or CCHP — M - Gas Absorption Heat Pumps — N – Boiler Optimisation Technologies — O – Lighting Controls — P – EV Charging Infrastructure — R – Solar Thermal Systems — S – Building Energy Management Systems — T – Floor Insulation — U - Ground Source Heat Pumps — V – Commercial Boilers — W – Electric Heaters The provision of Energy Efficiency Measures and Refurbishment Works for Domestic and Public Sector buildings. LHC seeks to establish a Framework Agreement for Energy Efficiency Measures and Associated Works. Workstream 1 relates to the provision of 21 individual Energy Efficiency Measures. Tenderers can pick and choose the Energy Efficiency measures they wish to bid. These are: — A – External Wall Insulation — B – Cavity Wall Insulation — C – Internal Wall Insulation — D – Insulation Materials (Loft) — E – Biomass — F – Solar PV with Battery storage — G – Air to Water Heat Pumps — H – District Heating Interface Units — I – Traditional Boilers — K – Rainscreen & Cladding — L – CHP or CCHP — M - Gas Absorption Heat Pumps — N – Boiler Optimisation Technologies — O – Lighting Controls — P – EV Charging Infrastructure — R – Solar Thermal Systems — S – Building Energy Management Systems — T – Floor Insulation — U - Ground Source Heat Pumps — V – Commercial Boilers — W – Electric Heaters The provision of Energy Efficiency Measures and Refurbishment Works for Domestic and Public Sector buildings. LHC seeks to establish a Framework Agreement for Energy Efficiency Measures and Associated Works. Workstream 1 relates to the provision of 21 individual Energy Efficiency Measures. Tenderers can pick and choose the Energy Efficiency measures they wish to bid. These are: — A – External Wall Insulation — B – Cavity Wall Insulation — C – Internal Wall Insulation — D – Insulation Materials (Loft) — E – Biomass — F – Solar PV with Battery storage — G – Air to Water Heat Pumps — H – District Heating Interface Units — I – Traditional Boilers — K – Rainscreen & Cladding — L – CHP or CCHP — M - Gas Absorption Heat Pumps — N – Boiler Optimisation Technologies — O – Lighting Controls — P – EV Charging Infrastructure — R – Solar Thermal Systems — S – Building Energy Management Systems — T – Floor Insulation — U - Ground Source Heat Pumps — V – Commercial Boilers — W – Electric Heaters The provision of Energy Efficiency Measures and Refurbishment Works for Domestic and Public Sector buildings. LHC seeks to establish a Framework Agreement for Energy Efficiency Measures and Associated Works. Workstream 1 relates to the provision of 21 individual Energy Efficiency Measures. Tenderers can pick and choose the Energy Efficiency measures they wish to bid. These are: — A – External Wall Insulation — B – Cavity Wall Insulation — C – Internal Wall Insulation — D – Insulation Materials (Loft) — E – Biomass — F – Solar PV with Battery storage — G – Air to Water Heat Pumps — H – District Heating Interface Units — I – Traditional Boilers — K – Rainscreen & Cladding — L – CHP or CCHP — M - Gas Absorption Heat Pumps — N – Boiler Optimisation Technologies — O – Lighting Controls — P – EV Charging Infrastructure — R – Solar Thermal Systems — S – Building Energy Management Systems — T – Floor Insulation — U - Ground Source Heat Pumps — V – Commercial Boilers — W – Electric Heaters The provision of Energy Efficiency Measures and Refurbishment Works for Domestic and Public Sector buildings. LHC seeks to establish a Framework Agreement for Energy Efficiency Measures and Associated Works. Workstream 1 relates to the provision of 21 individual Energy Efficiency Measures. Tenderers can pick and choose the Energy Efficiency measures they wish to bid. These are: — A – External Wall Insulation — B – Cavity Wall Insulation — C – Internal Wall Insulation — D – Insulation Materials (Loft) — E – Biomass — F – Solar PV with Battery storage — G – Air to Water Heat Pumps — H – District Heating Interface Units — I – Traditional Boilers — K – Rainscreen & Cladding — L – CHP or CCHP — M - Gas Absorption Heat Pumps — N – Boiler Optimisation Technologies — O – Lighting Controls — P – EV Charging Infrastructure — R – Solar Thermal Systems — S – Building Energy Management Systems — T – Floor Insulation — U - Ground Source Heat Pumps — V – Commercial Boilers — W – Electric Heaters The provision of Energy Efficiency Measures and Refurbishment Works for Domestic and Public Sector buildings. LHC seeks to establish a Framework Agreement for Energy Efficiency Measures and Associated Works. Workstream 1 relates to the provision of 21 individual Energy Efficiency Measures. Tenderers can pick and choose the Energy Efficiency measures they wish to bid. These are: — A – External Wall Insulation — B – Cavity Wall Insulation — C – Internal Wall Insulation — D – Insulation Materials (Loft) — E – Biomass — F – Solar PV with Battery storage — G – Air to Water Heat Pumps — H – District Heating Interface Units — I – Traditional Boilers — K – Rainscreen & Cladding — L – CHP or CCHP — M - Gas Absorption Heat Pumps — N – Boiler Optimisation Technologies — O – Lighting Controls — P – EV Charging Infrastructure — R – Solar Thermal Systems — S – Building Energy Management Systems — T – Floor Insulation — U - Ground Source Heat Pumps — V – Commercial Boilers — W – Electric Heaters The provision of Energy Efficiency Measures and Refurbishment Works for Domestic and Public Sector buildings. LHC seeks to establish a Framework Agreement for Energy Efficiency Measures and Associated Works. Workstream 1 relates to the provision of 21 individual Energy Efficiency Measures. Tenderers can pick and choose the Energy Efficiency measures they wish to bid. These are: — A – External Wall Insulation — B – Cavity Wall Insulation — C – Internal Wall Insulation — D – Insulation Materials (Loft) — E – Biomass — F – Solar PV with Battery storage — G – Air to Water Heat Pumps — H – District Heating Interface Units — I – Traditional Boilers — K – Rainscreen & Cladding — L – CHP or CCHP — M - Gas Absorption Heat Pumps — N – Boiler Optimisation Technologies — O – Lighting Controls — P – EV Charging Infrastructure — R – Solar Thermal Systems — S – Building Energy Management Systems — T – Floor Insulation — U - Ground Source Heat Pumps — V – Commercial Boilers — W – Electric Heaters The provision of Energy Efficiency Measures and Refurbishment Works for Domestic and Public Sector buildings. LHC seeks to establish a Framework Agreement for Energy Efficiency Measures and Associated Works. Workstream 1 relates to the provision of 21 individual Energy Efficiency Measures. Tenderers can pick and choose the Energy Efficiency measures they wish to bid. These are: — A – External Wall Insulation — B – Cavity Wall Insulation — C – Internal Wall Insulation — D – Insulation Materials (Loft) — E – Biomass — F – Solar PV with Battery storage — G – Air to Water Heat Pumps — H – District Heating Interface Units — I – Traditional Boilers — K – Rainscreen & Cladding — L – CHP or CCHP — M - Gas Absorption Heat Pumps — N – Boiler Optimisation Technologies — O – Lighting Controls — P – EV Charging Infrastructure — R – Solar Thermal Systems — S – Building Energy Management Systems — T – Floor Insulation — U - Ground Source Heat Pumps — V – Commercial Boilers — W – Electric Heaters The provision of Energy Efficiency Measures and Refurbishment Works for Domestic and Public Sector buildings. LHC seeks to establish a Framework Agreement for Energy Efficiency Measures and Associated Works. Workstream 2 relates to the provision of all 21 individual Energy Efficiency Measures. Tenderers can pick and choose the Energy Efficiency measures they wish to bid. These are: — A – External Wall Insulation — B – Cavity Wall Insulation — C – Internal Wall Insulation — D – Insulation Materials (Loft) — E – Biomass — F – Solar PV with Battery storage — G – Air to Water Heat Pumps — H – District Heating Interface Units — I – Traditional Boilers — K – Rainscreen & Cladding — L – CHP or CCHP — M - Gas Absorption Heat Pumps — N – Boiler Optimisation Technologies — O – Lighting Controls — P – EV Charging Infrastructure — R – Solar Thermal Systems — S – Building Energy Management Systems — T – Floor Insulation — U - Ground Source Heat Pumps — V – Commercial Boilers — W – Electric Heaters The provision of Energy Efficiency Measures and Refurbishment Works for Domestic and Public Sector buildings. LHC seeks to establish a Framework Agreement for Energy Efficiency Measures and Associated Works. Workstream 1 relates to the provision of 21 individual Energy Efficiency Measures. Tenderers can pick and choose the Energy Efficiency measures they wish to bid. These are: — A – External Wall Insulation — B – Cavity Wall Insulation — C – Internal Wall Insulation — D – Insulation Materials (Loft) — E – Biomass — F – Solar PV with Battery storage — G – Air to Water Heat Pumps — H – District Heating Interface Units — I – Traditional Boilers — K – Rainscreen & Cladding — L – CHP or CCHP — M - Gas Absorption Heat Pumps — N – Boiler Optimisation Technologies — O – Lighting Controls — P – EV Charging Infrastructure — R – Solar Thermal Systems — S – Building Energy Management Systems — T – Floor Insulation — U - Ground Source Heat Pumps — V – Commercial Boilers — W – Electric Heaters
Timeline
- Completed: Tender published8 January 2020Current notice
- Completed: Submission date10 February 2020
About the buyer
Cadder Housing Association Ltd is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 51100000 · Installation services of electrical and mechanical equipment
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@cadder-housing-association-ltd.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@cadder-housing-association-ltd.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@cadder-housing-association-ltd.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@cadder-housing-association-ltd.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@cadder-housing-association-ltd.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@cadder-housing-association-ltd.gov |
15 similar open tenders
See more open tenders related to Installation services of electrical and mechanical equipment.
- Open tender
Property QUDM
- Open tender
Property Works
- Open tender
Continuous Water Quality Monitoring (CWQM)
- Open tender
Damp Proofing, Mould & Associated Works DPS
- Open tender
Housing Maintenance & Repair
- Open tender
Housing Maintenance & Repair
Related topics
Topics related to Installation services of electrical and mechanical equipment, ranked by notice volume.
- 1,672£138.7bn
- 2,992£331.6bn
- 11,175£1.0tn
- 26,970£1.7tn
- 3,593£717.5bn
Related buyers
Buyers similar to Cadder Housing Association Ltd.
- 44£22.9m
- 23£301.9m
- 19£11.1m
- 16£15.4m
- 16£6.7m
- 16£9.1m
- 15£4.1m
- 13£81.5m
- 12£12.5m
- 12£2.0m
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.
