Awarded contract

Works for complete or part construction and civil engineering work

Details

Value
GBP 5,301,722
Topic
Works for complete or part construction and civil engineering work
Published
14 April 2020

Tender description

The works are the construction of a mine water treatment scheme at Nent Haggs. The works include: • the provision of a site compound for the duration of the works and the reinstatement of the site compound site following completion of the works; • the construction of a capture structure to capture the raw mine water at source (the capture point); • the design of a rising main to transfer the mine water from the pumping station to the treatment site (the transfer route); • the construction of gravity pipework and rising mains to transfer the raw mine water from the capture point to site 4 (the treatment site); • the construction of a pumping station on site 38 (the pumping station site); • the earthworks to form the finished levels at the treatment site; • the construction of a hydrogen peroxide dosing system at the treatment site; • the construction of flow control and distribution pipework at the treatment site; • the construction of the outfalls for the treated mine water to the River. The works are the construction of a mine water treatment scheme at Nent Haggs. The works include: • the provision of a site compound for the duration of the works and the reinstatement of the site compound site following completion of the works; • the construction of a capture structure to capture the raw mine water at source (the capture point); • the design of a rising main to transfer the mine water from the pumping station to the treatment site (the transfer route); • the construction of gravity pipework and rising mains to transfer the raw mine water from the capture point to site 4 (the treatment site); • the construction of a pumping station on site 38 (the pumping station site); • the earthworks to form the finished levels at the treatment site; • the construction of a hydrogen peroxide dosing system at the treatment site; • the construction of flow control and distribution pipework at the treatment site; • the construction of the outfalls for the treated mine water to the River Nent; • the implementation of a landscape scheme; • the design and implementation of a scheme to reduce surface water flooding in Nentsbury; and • the commissioning of the treatment scheme.

Timeline

  1. Completed: Award published14 April 2020
    Current notice

About the buyer

The Coal Authority is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.

Relevant CPV codes

  • 45200000 · Works for complete or part construction and civil engineering work

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?
Sign-up to enrich

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

35 similar open tenders

See more open tenders related to Works for complete or part construction and civil engineering work.

Explore all open tenders

Related topics

Topics related to Works for complete or part construction and civil engineering work, ranked by notice volume.

View all topics

Related buyers

Buyers similar to The Coal Authority.

View all buyers

Win more public sector contracts

Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.