Waste incinerators
Details
- Value
- GBP 600,000,000
- Topic
- Waste incinerators
- Published
- 19 December 2019
- Source
- TedNotices
Tender description
The Authority is in the preparatory stage of the procurement of a contractor for the construction of a new energy recovery facility including all buildings, infrastructure and works at the EcoPark in relation to the North London Heat and Power Project (NLHPP). The NLHPP is a programme of works to be carried out for the North London Waste Authority (the Authority) at its ‘EcoPark’ site, in Edmonton, London N18 3AG. The contractor shall deliver all design, engineering, procurement, construction, commissioning, testing, operator training and handover requirements for the new ERF including all buildings, infrastructure and works. The Authority is in the preparatory stage of the procurement of a contractor for the construction of a new energy recovery facility including all buildings, infrastructure and works at the EcoPark in relation to the North London Heat and Power Project (NLHPP). The works to be carried out by the contractor shall include: (i) the energy recovery facility which is made up of 2 identical process lines each comprising combustion unit, boiler and flue gas treatment system with a common turbine/generator/condensing system and all auxiliary systems; (ii) all civil engineering, buildings, architectural treatment, utilities connection, landscaping and other site works; (iii) ERF weighbridges and ancillary offices; (iv) transport offices, workshops and parking for on-site operational vehicles; (v) fuelling area and equipment; (vi) oil and fuel storage; (vii) vehicle wash; (viii) administration/operations offices and staff facilities; (ix) windshield and flues; (x) cooling condensers; (xi) raw water pre-treatment plant; (xii) ERF fire water tank and associated fire protection systems; (xiii) electrical substation, works and connections; (xiv) gas compound, works and connections; (xv) other utility connections including communications and water; (xvi) workshops, stores and maintenance contractors area; (xvii) Waste Water Treatment Plant and Associated Works. The contractor shall deliver all design, engineering, procurement, construction, commissioning, testing, operator training and handover requirements for the new ERF including all buildings, infrastructure and works. The NLHPP is a programme of works to be carried out for the North London Waste Authority (the Authority) at its ‘EcoPark’ site, in Edmonton, London N18 3AG. The works are the fundamental component in the delivery of the NLHPP and associated works at the Edmonton EcoPark pursuant to a development consent order granted to the Authority on 24.2.2017. The site for the works, Edmonton EcoPark, is an operational waste management site where LondonEnergy Ltd (LEL), a private company wholly owned by the Authority, operates an existing Energy from Waste (EfW) facility. LEL will maintain normal operation of the EfW facility at all times during construction and commissioning.
Timeline
- Completed: Pre-tender published19 December 2019Current notice
About the buyer
North London Waste Authority is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 42320000 · Waste incinerators
- 45200000 · Works for complete or part construction and civil engineering work
- 45210000 · Building construction work
- 45220000 · Engineering works and construction works
- 45222000 · Construction work for engineering works except bridges, tunnels, shafts and subways
- 45222100 · Waste-treatment plant construction work
- 45222110 · Waste disposal site construction work
- 45232140 · District-heating mains construction work
- 45232141 · Heating works
- 45251000 · Construction works for power plants and heating plants
- 45251140 · Thermal power plant construction work
- 45251200 · Heating plant construction work
- 45251250 · District-heating plant construction work
- 51135110 · Installation services of waste incinerators
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@north-london-waste-authority.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@north-london-waste-authority.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@north-london-waste-authority.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@north-london-waste-authority.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@north-london-waste-authority.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@north-london-waste-authority.gov |
112 similar open tenders
See more open tenders related to Waste incinerators.
- Open tender
Southern Construction Framework (SCF-6)
- Open tender
Waste Management
- Open tender
UK DTE Projects (various upcoming)
- Open tender
Provision of Contractor Services
Related topics
Topics related to Waste incinerators, ranked by notice volume.
- 173,470£11.6tn
Related buyers
Buyers similar to North London Waste Authority.
- 2,712£1.7bn
- 1,730£206.0bn
- 1,557£58.9bn
- 1,104£1.0bn
- 963£695.6m
- 957£2.3bn
- 913£19.4bn
- 883£1.7bn
- 850£14.1bn
- 766£154.9m
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.