Expired contract

Building construction work

Details

Value
GBP 9,701,732
Duration
4 years
Topic
Electrical supplies and accessories
Published
11 January 2019

Tender description

Hebridean Housing Partnership (HHP) require a number of contractors to deliver an investment programme which will ensure HHP continues to meet and maintain the scottish housing quality standard and energy efficiency standard for social housing. The framework will consist of works in the following areas to be deliver across the Western Isles: — window and door replacement, — heating replacement, — bathroom replacement, — kitchen replacement, — roofing and roughcast works, — electrical works, — environmental works, — occupational therapy works, — energy efficiency. Covers the replacement of window, doors, roof windows and store doors, etc. Scope includes: — survey: coordinate and undertake survey at site minimising disruption and inconvenience to tenants, — design: design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents, — install: install and make good as appropriate, — commissioning: commission any new equipment, — defects and maintenance: manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period. Covers the replacement of sanitary ware, installation of new over-bath shower with water-proof tile effect panels around bath, new consumer unit (if required), replacement of light fitting, decoration to walls and ceiling, new extractor fan and replacement of floor covering. Scope includes: — Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants — Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified — Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents — Install - Install and make good as appropriate — Commissioning - Commission any new equipment — Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period. Covers the replacement of kitchen units to new layout, accommodation of all white goods, new electrical sockets and switches, replacement of wall and ceiling coverings/ paint and replacement of vinyl flooring. Tenant chooses kitchen units, worktops, wallpaper or paint and vinyl. Scope includes: — Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants — Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents — Install- Install and make good as appropriate — Commissioning - Commission any new equipment — Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period. Covers the removal of existing roof covering, battens, counter battens, gutters, lead and fascias and their subsequent replacement to HHP specification (incl. new felt). Roughcast covers the power-washing to existing walls. New roughcast to be applied over existing with existing drip-checks retained. Any skews and wall copes to be replaced. Fencing covers for new low level timber palisade fencing. Scope includes: — Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants — Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified — Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents — Install- Install and make good as appropriate — Commissioning - Commission any new equipment — Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period Covers the first time installation of external bulkhead light fittings, replacement of carbon monoxide detectors and smoke detectors, partial house re-wire and full house re-wire. Scope includes: — Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants — Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified — Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents — Install - Install and make good as appropriate — Commissioning - Commission any new equipment — Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period Covers the installation of fencing, footpaths and drainage works to properties Scope includes: — Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants — Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified — Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents — Install - Install and make good as appropriate — Commissioning - Commission any new equipment — Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period Covers the installation of showers, ramps, grab rails, stair lifts and the like for the disabled along with all associated work to properties Scope includes: — Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants — Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified — Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents — Install - Install and make good as appropriate — Commissioning - Commission any new equipment — Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period Covers the replacement of window, doors, roof windows and store doors etc. Scope includes: — Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants — Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified — Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents — Install - Install and make good as appropriate — Commissioning - Commission any new equipment — Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period Covers the replacement of sanitary ware, installation of new over-bath shower with water-proof tile effect panels around bath, new consumer unit (if required), replacement of light fitting, decoration to walls and ceiling, new extractor fan and replacement of floor covering. Scope includes: — Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants — Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified — Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents — Install - Install and make good as appropriate — Commissioning - Commission any new equipment — Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period Covers the replacement of kitchen units to new layout, accommodation of all white goods, new electrical sockets and switches, replacement of wall and ceiling coverings/ paint and replacement of vinyl flooring. Tenant chooses kitchen units, worktops, wallpaper or paint and vinyl. Scope includes: — Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants — Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified — Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents — Install- Install and make good as appropriate — Commissioning - Commission any new equipment — Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period. Covers the removal of existing roof covering, battens, counter battens, gutters, lead and fascias and their subsequent replacement to HHP specification (incl. new felt). Roughcast covers the power-washing to existing walls. New roughcast to be applied over existing with existing drip-checks retained. Any skews and wall copes to be replaced. Fencing covers for new low level timber palisade fencing. Scope includes: — Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants — Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents — Install- Install and make good as appropriate — Commissioning - Commission any new equipment — Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period Covers the first time installation of external bulkhead light fittings, replacement of carbon monoxide detectors and smoke detectors, partial house re-wire and full house re-wire. Scope includes: — Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants — Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified — Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents — Install - Install and make good as appropriate — Commissioning - Commission any new equipment — Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period Covers the installation of fencing, footpaths and drainage works to properties Scope includes: — Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants — Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified — Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents — Install - Install and make good as appropriate — Commissioning - Commission any new equipment — Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period Covers the installation of showers, ramps, grab rails, stair lifts and the like for the disabled along with all associated work to properties. Scope includes: — Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants — Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified — Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents — Install - Install and make good as appropriate — Commissioning - Commission any new equipment — Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period Covers the upgrading of insulation to walls and roofs and all associated work to properties. Scope includes: — Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants — Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified — Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents — Install - Install and make good as appropriate — Commissioning - Commission any new equipment — Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period Covers larger programmes of work in relation to installation of bathrooms, kitchens and heating replacements. Programmes will not necessarily cover all three elements and may be restricted to a single element as applicable. Covers the removal of existing heating system (either solid fuel or electric storage/ convector) and subsequent replacement with Air Source Heat Pump heating, hot water and distribution system. Scope includes: — Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants — Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified — Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents — Install - Install and make good as appropriate — Commissioning - Commission any new equipment - including 3 visits to each tenant to train them in the understanding of the heating system — Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period — Infrared and High Heat Retention Storage Heating Covers the removal of existing heating system (either solid fuel or electric storage/ convector) and subsequent replacement with Air Source Heat Pump heating, hot water and distribution system. Scope includes: — Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants — Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified — Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents — Install - Install and make good as appropriate — Commissioning - Commission any new equipment - including 3 visits to each tenant to train them in the understanding of the heating system — Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period — Infrared and High Heat Retention Storage Heating

Timeline

  1. Completed: Award date12 December 2018
  2. Completed: Award published11 January 2019
    Current notice
  3. Completed: Contract expiry date21 November 2022

About the buyer

Hebridean Housing Partnership Ltd is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.

Relevant CPV codes

  • 31680000 · Electrical supplies and accessories
  • 31681000 · Electrical accessories
  • 31681400 · Electrical components
  • 31681410 · Electrical materials
  • 34928200 · Fences
  • 34928220 · Fencing components
  • 34953000 · Access ramps
  • 39141000 · Kitchen furniture and equipment
  • 39141400 · Fitted kitchens
  • 39715200 · Heating equipment
  • 39715210 · Central-heating equipment
  • 42131110 · Central-heating radiator valves
  • 44112400 · Roof
  • 44112410 · Roof frames
  • 44112420 · Roof supports
  • 44112500 · Roofing materials
  • 44115200 · Plumbing and heating materials
  • 44115210 · Plumbing materials
  • 44115220 · Heating materials
  • 44115600 · Stairlifts
  • 44221000 · Windows, doors and related items
  • 44221100 · Windows
  • 44221110 · Window frames
  • 44221200 · Doors
  • 44221211 · Door frames
  • 44221213 · Door thresholds
  • 44221220 · Fire doors
  • 44411200 · Baths
  • 44411400 · Shower basins
  • 44620000 · Central-heating radiators and boilers and parts
  • 44621110 · Central-heating radiators
  • 44621220 · Central-heating boilers
  • 45111240 · Ground-drainage work
  • 45210000 · Building construction work
  • 45211310 · Bathrooms construction work
  • 45232141 · Heating works
  • 45233161 · Footpath construction work
  • 45233253 · Surface work for footpaths
  • 45233340 · Foundation work for footpaths
  • 45260000 · Roof works and other special trade construction works
  • 45261200 · Roof-covering and roof-painting work
  • 45261210 · Roof-covering work
  • 45261211 · Roof-tiling work
  • 45261212 · Roof-slating work
  • 45261410 · Roof insulation work
  • 45261420 · Waterproofing work
  • 45262522 · Masonry work
  • 45310000 · Electrical installation work
  • 45311000 · Electrical wiring and fitting work
  • 45311100 · Electrical wiring work
  • 45311200 · Electrical fitting work
  • 45315000 · Electrical installation work of heating and other electrical building-equipment
  • 45317000 · Other electrical installation work
  • 45320000 · Insulation work
  • 45321000 · Thermal insulation work
  • 45330000 · Plumbing and sanitary works
  • 45331000 · Heating, ventilation and air-conditioning installation work
  • 45331100 · Central-heating installation work
  • 45332200 · Water plumbing work
  • 45342000 · Erection of fencing
  • 45410000 · Plastering work
  • 45421100 · Installation of doors and windows and related components
  • 45421110 · Installation of door and window frames
  • 45421111 · Installation of door frames
  • 45421112 · Installation of window frames
  • 45421130 · Installation of doors and windows
  • 45421131 · Installation of doors
  • 45421132 · Installation of windows
  • 45421151 · Installation of fitted kitchens

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?
Sign-up to enrich

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

152 similar open tenders

See more open tenders related to Building construction work.

Explore all open tenders

Win more public sector contracts

Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.