Tender description
The works are the construction of a mine water treatment scheme at Nent Haggs. The works include: — the provision of a site compound for the duration of the works and the reinstatement of the site compound site following completion of the works, — the construction of a capture structure to capture the raw mine water at source (the capture point), — the design of a rising main to transfer the mine water from the pumping station to the treatment site (the transfer route), — the construction of gravity pipework and rising mains to transfer the raw mine water from the capture point to site 4 (the treatment site), — the construction of a pumping station on site 38 (the pumping station site), — the earthworks to form the finished levels at the treatment site, — the construction of a hydrogen peroxide dosing system at the treatment site, — the construction of flow control and distribution pipework at the treatment site, — the construction of the outfalls for the treated mine water to the River. The works are the construction of a mine water treatment scheme at Nent Haggs. The works include: — the provision of a site compound for the duration of the works and the reinstatement of the site compound site following completion of the works, — the construction of a capture structure to capture the raw mine water at source (the capture point), — the design of a rising main to transfer the mine water from the pumping station to the treatment site (the transfer route), — the construction of gravity pipework and rising mains to transfer the raw mine water from the capture point to site 4 (the treatment site), — the construction of a pumping station on site 38 (the pumping station site), — the earthworks to form the finished levels at the treatment site, — the construction of a hydrogen peroxide dosing system at the treatment site, — the construction of flow control and distribution pipework at the treatment site, — the construction of the outfalls for the treated mine water to the River Nent, — the implementation of a landscape scheme, — the design and implementation of a scheme to reduce surface water flooding in Nentsbury, and — the commissioning of the treatment scheme.
Timeline
- Completed: Tender published8 April 2019Current notice
- Completed: Submission date24 May 2019
About the buyer
The Coal Authority is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 45200000 · Works for complete or part construction and civil engineering work
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@the-coal-authority.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@the-coal-authority.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@the-coal-authority.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@the-coal-authority.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@the-coal-authority.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@the-coal-authority.gov |
35 similar open tenders
See more open tenders related to Works for complete or part construction and civil engineering work.
- Open tender
Construction and Development DPS
Related topics
Topics related to Works for complete or part construction and civil engineering work, ranked by notice volume.
- 8,426£973.7bn
Related buyers
Buyers similar to The Coal Authority.
- 2,657£1.7bn
- 900£19.4bn
- 688£8.8bn
- 472£15.4bn
- 433£3.8bn
- 350£20.5m
- 301£368.1m
- 261£233.9m
- 252£578.5m
- 240£10.1bn
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.