Design and Build of workspace, Canner Slipway, Newlyn Harbour
Details
- Value
- GBP 1,025,000
- Topic
- Construction structures and materials; auxiliary products to construction (except electric apparatus)
- Published
- 28 August 2018
- Submission
- 12 September 2018
- Source
- ContractsFinder
Tender description
Newlyn Pier and Harbour Commissioners is seeking to secure the services of a suitably qualified construction firm to design and build workshops in the harbour on a new quayside. The deadline for responses is: 13:00, Wednesday 12th September 2018. Newlyn is the largest fishing port in England by fleet and landings. It is located near Penzance in Mounts Bay, South West Cornwall. This Trust Port has a long term programme of development and expansion already underway. These plans address a longstanding shortage of good quality workspace in Newlyn, and quayside workspace in Cornwall, with the construction of industrial workshops, marine engineering infrastructure, food processing facilities and office space. This contract, along with Lot 4, relates to the "Canner Slipway" project within this programme which is part of the regeneration of the centre of the harbour estate and town. The Canner Slipway plans are for six to eight sheds of 120m2 on an expanded area of sheet piled, capped quayside with tidal access. The buildings will be steel portal frames suitable for housing marine engineering and fishing operations with the height to accommodate mezzanine offices/storage or gantry crane systems. The current estimate for Canner Slipway, both marine civils and sheds, is £2.5m. Note: the funding source specifies that all buildings should achieve BREEAM excellent certification and a BREEAM Assessor is in the process of being procured separately to cover all three projects being undertaken (Canner Slipway, New Strand and Canner Car Park) to building certification stage and establish what this requirement will mean for the Canner Slipway element. This project, along with the two others in the programme, Canner Slipway and Canner Car Park are being funded by the Newlyn Pier and Harbour Commissioners, supported by a grant from the European Regional Development Fund (ERDF) under the ESIF Growth Programme for England 2014 to 2020 with the overall cost of all three elements of the scheme estimated at £6,146,308. Initial designs and costings are available along with site investigations from the immediate area. The timelines for completion of the design and costs for the Canner Slipway workshops is mid October with the build over the following two years. Other build contracts will be issued for the New Strand in November and December of this year.
Timeline
- Completed: Tender published28 August 2018Current notice
- Completed: Submission date12 September 2018
About the buyer
Newlyn Pier & Harbour Commission is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 44000000 · Construction structures and materials; auxiliary products to construction (except electric apparatus)
- 45000000 · Construction work
- 71000000 · Architectural, construction, engineering and inspection services
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@newlyn-pier-harbour-commission.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@newlyn-pier-harbour-commission.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@newlyn-pier-harbour-commission.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@newlyn-pier-harbour-commission.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@newlyn-pier-harbour-commission.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@newlyn-pier-harbour-commission.gov |
172 similar open tenders
See more open tenders related to Design and Build of workspace, Canner Slipway, Newlyn Harbour.
- Open tender
Property QUDM
- Open tender
Plumpton Sports Pavilion
- Open tender
Property Works
- Open tender
Provision of Contractor Services
Related topics
Topics related to Design and Build of workspace, Canner Slipway, Newlyn Harbour, ranked by notice volume.
- 4,088£269.5bn
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.
