Expired contract

Temple Quay, Plot 3 Infrastructure Works

Details

Supplier(s)
Dyer & Butler
Value
GBP 1,150,000
Duration
4 months
Topic
Site preparation work
Published
15 January 2016

Tender description

The Plot 3 Infrastructure works around Temple Quay being approximately 3,000m2 of pavement construction, generally comprise of stone capping with tarmac sub-base, sand and block paving, and associated works will include the following components: • Earthworks • Extension of Friary to Meads Reach Bridge o This work would comprise the extension of Friary as a two carriageway road east of Isambard Walk to Meads Reach Bridge. o As part of this work the footway to the north of Friary (adjacent to the Plot 3 development site) would be extended to 6 metres in width, as will the footway to the south (adjacent to the station) would be made 8.5 metres in width and include the provision of 6 new benches and an avenue of 5 new trees. o The Friary will terminate with the provision of a new flexible use open space • Flexible Open Space o Space for temporary use will also be provided between the extended Friary and the listed retaining wall (outside of development area) o The area will be finished with seating terraces, and a planted bank to tie into the existing levels forming an earth retaining structure. o This area will also need to be made capable of accommodating the occasional vehicle turning. • Opening Isambard Walk as a two-way vehicular street between Friary and Temple Back East o The existing pedestrianised Isambard Walk will be opened for two-way vehicle access to create a link between Temple Back East and Friary, and to tie in with the existing road of the private estate. As part of this work a new footway will also be provided to the eastern side of the Isambard Walk new carriageway. o Isambard Walk will act as a shared space, and so will be treated to reduce the potential dominance of vehicles and reduce vehicle speeds o The footway, trees, cycle parking and street furniture to the west of Isambard Walk and in The Square would remain as existing. • Temple Back East o The existing turning head area on Temple Back East would be removed, to allow two way vehicular access to Isambard Walk o Two way vehicular access will be maintained to Rope Walk, with a left turn out of Rope Walk into Isambard Walk to be provided for o Existing crossing will be maintained across from The Square to the footway on Temple Back East

Timeline

  1. Completed: Award published15 January 2016
    Current notice
  2. Completed: Award date17 March 2016
  3. Completed: Contract expiry date31 July 2016

About the buyer

Homes and Communities Agency is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.

Relevant CPV codes

  • 45100000 · Site preparation work
  • 45200000 · Works for complete or part construction and civil engineering work

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?
Sign-up to enrich

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

46 similar open tenders

See more open tenders related to Temple Quay, Plot 3 Infrastructure Works.

Explore all open tenders

Related buyers

Buyers similar to Homes and Communities Agency.

View all buyers

Win more public sector contracts

Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.