Tender description
Nine cells have been constructed at the facility. Cells 1 to 7 have been filled with waste from December 2005 until March 2013. To date, approximately 820,000 tonnes of material have been placed into the engineered cells comprising MSW and material for recovery / interim capping. Cells 1 to 7 have been capped with temporary geocomposite capping material and a section of Cell 1 has had synthetic permanent capping materials installed. Cells No. 8 and 9 have been constructed, but no waste has yet been placed in these cells. In order to prepare the landfill to recommence acceptance of waste, a number of specific items of infrastructural work need to be executed at the facility. The necessary works in the contract are summarised in the list of works packages below:- 1. Cell Preparation - Remove Cell 8 bund, Reinstate Cell structure; 2. Cell Construction Quality Assurance (CQA) - Leak location Testing (Cell 8 & 9), Repairs if necessary; 3. Cell Access - Install Road access / initial tipping location; 4. Leachate Prevention - Install Bund/Swail to divert rainwater from Cell 8; 5. Litter Control - Erect litter netting around perimeter of waste cells; 6. Gas Management: Ring Main Extension - Extend ring main, including installation of KO Pots and Pumps (OPTIONAL); 7. Gas Management: LLDPE flap installation - Install LLDPE Flap to prevent oxygen ingress when extracting gas from cell drainage layer; 8. Cells 5 & 7 Leachate Pumps - Install 2 No. new leachate pumps; 9. Container Stabilisation - Stabilisation of existing 40ft container; 10. Non-specified works in the cells - Rates for similar works at landfill Manager's requirements (OPTIONAL). It is a condition of Contract Award that Tenderers are in a position to commence construction work within 10 days of the tender date. A site visit is essential for the pricing of these works.
Timeline
- Completed: Award published21 July 2015Current notice
About the buyer
Galway County Council is a public sector buyer in Ireland publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 45000000 · Construction work
- 45200000 · Works for complete or part construction and civil engineering work
- 45220000 · Engineering works and construction works
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@galway-county-council.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@galway-county-council.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@galway-county-council.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@galway-county-council.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@galway-county-council.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@galway-county-council.gov |
135 similar open tenders
See more open tenders related to East Galway Landfill Site - Enabling Works for Landfill Re-opening.
- Open tender
Property QUDM
- Open tender
Fair Park Regeneration
- Open tender
Plumpton Sports Pavilion
- Open tender
Property Works
- Open tender
UK DTE Projects (various upcoming)
Related topics
Topics related to East Galway Landfill Site - Enabling Works for Landfill Re-opening, ranked by notice volume.
- 4,088£269.5bn
Related buyers
Buyers similar to Galway County Council.
- 72£1.5bn
- 71£462.2m
- 62£179.9m
- 55£6.0bn
- 49£165.3m
- 45—
- 44£15.7m
- 42£12.2m
- 33£3.0m
- 32—
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.