Stale Pre-tender

Insulated Rail Joints & Rail Ancillaries

Details

Topic
Rails and accessories
Published
24 February 2026
Submission
17 March 2026

Tender description

Network Rail is undertaking market research to assess the current level of industry interest, capability and capacity for the manufacture and supply of Insulated Rail Joints (IRJs) and Rail Ancillaries (Closure Rails). These goods will be required to be manufactured to specified standards, supplied in varying lengths and configurations, and delivered to meet both planned and emergency operational requirements. The Information Document available via Bravo provides full details of the requirement, including: • Background to the requirement and the operational context • Technical specifications for all IRJ and Closure Rail types • Applicable rail profiles, joint configurations and manufacturing processes • Anticipated monthly and annual volumes based on historic demand • Expected lead times, including short‑notice and emergency supply requirements • Compliance obligations, including relevant Network Rail standards, drawings and Product Acceptance requirements • Preferred site location considerations to support same‑day and nationwide delivery capability The following supporting documents will be made available as part of the engagement: • Network Rail Technical Specification for the Design, Assembly and Testing of Glued Insulated Rail Joints (November 2025) • Standards: – RT/CE/S/023 Insulated Rail Joints – RT/CE/S/050 Process for Cold‑Expanding New Fishbolt Holes by the Split Sleeve Method (NR/SP/TRK/050) – NR/L3/TRK/4004 Switch and Crossing Assemblies • RE/PW Drawings: – RE/PW/624 (Twisted Closure Rails) – RE/PW/549 (95RBH) – RE/PW/792 (CEN56E1) – RE/PW/979 (CEN60E2) • NR/L2/TRK/2049 Track Design Handbook Product Acceptance (PA) is required before supply may commence. PA activities may form part of mobilisation, and the contract will not move into delivery until PA is fully approved by Network Rail. Suppliers will be expected to support the PA process by providing the necessary technical documentation, evidence and sample materials as required. Suppliers are invited to review the Information Document and complete the questionnaire within the PQQ. The information gathered will help Network Rail understand current market capability, production capacity, compliance readiness and the ability to meet the supply requirements for IRJs and Closure Rails. This market engagement is issued for information‑gathering purposes only and does not constitute a call for competition, nor does participation or non‑participation affect eligibility for any future procurement opportunity.

Timeline

  1. Completed: Pre-tender published24 February 2026
    Current notice

About the buyer

Network Rail runs a safe, efficient railway, and buys as a central public body split between a national Route Services team and its regional routes. Network Rail's latest spend reporting covers Control Period 7, the 2024-25 financial year.

Safety-critical work needs audited status on RISQS, the rail industry's supplier qualification scheme, before Network Rail contracts directly.

Over the past 5 years, most of Network Rail's contract awards have been in IT services, architectural and engineering services and construction work.

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

Related buyers

Buyers similar to Network Rail.

View all buyers

Finding public sector work shouldn't be hard

Make your next tender search effortless with Stotles. Set up alerts, find decision maker contacts and never miss a good-fit opportunity again.