Tender description
Following on from Phase 1 GAP analysis a Detailed assessment of the design maturity to verify that the 3D digital model accurately represents the intended design, highlight and Risk, or gaps to filled before tender or by the oncoming Delivery Partner. Proposed scope detail to Include: - TA Design maturity assessment (design gap analysis) - completion based on information available to date. - PDP DCO and Stage 5 design basis - define what standards etc. - PDP design composition (List down PDP design deliverables used for this assessment) - PDP gap analysis exercise: a. Stage 5 design package completion status (% age complete, what is remaining) b. Stage 5 design package approval status and if approved with comments their significance (minor / major) (i.e. AIP approved, significance of any comments) - Define and list down design changes required post PDP work (i.e. DCO Requirements work partially completed or was not considered) - Define design changes made post PDP work (i.e. Update of Arcadis work from Nov 2024 to date) - Design opportunities / VE identification - Design risks emerging from prior to current scope including risks highlighted through gap analysis exercise Schedule of regular review meeting to monitor progress between National Highways and Arcadis to ensure output is met - Final deliverable to be in a report format, which should include the following items: - Design overview background (This section to include PDP design prior to their termination of contract) - Design maturity, design completeness, design work remaining, and design status report - Update around assurance completed by Arcadis under TA role - Design opportunities / VE identification/Efficiencies - Carbon and biodiversity position - PDP DCO and Stage 5 design basis - define what standards etc - Define design changes made post PDP work (i.e. Update of Arcadis work from Nov 2024 to date) - Define and list down design changes required post PDP work (i.e. DCO Requirements work partially completed or was not considered) - Identify areas around design de-risking ahead of / during procurement for National Highways
Timeline
- Completed: Award date27 January 2026
- Completed: Award published29 January 2026Current notice
- Completed: Contract expiry date31 May 2026
About the buyer
National Highways Limited is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 73220000 · Development consultancy services
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@national-highways-limited.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@national-highways-limited.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@national-highways-limited.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@national-highways-limited.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@national-highways-limited.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@national-highways-limited.gov |
7 similar open tenders
See more open tenders related to S30049 A38 Derby Junction Designing Validation Works.
- Open tender
Omega DPS
- Open tender
CHIC Development Dynamic Purchasing System
- Open tender
Lowestoft Dynamic Purchasing System
Related buyers
Buyers similar to National Highways Limited.
- 2,657£1.7bn
- 688£8.8bn
- 472£15.4bn
- 433£3.8bn
- 350£20.5m
- 301£368.1m
- 261£233.9m
- 252£578.5m
- 240£10.1bn
- 171£48.3m
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.