Tender description
This tender is for the Tarbert to Whitehouse Active Travel Path; linking the Tarbert Ferry Terminal (OS Grid NR871688) to the Kennacraig Ferry Terminal, Skipness Road End (B8001) and Whitehouse (OS Grid NR817613), and will build upon the concept design developed for the route (Connected Transport Planning, 2026). Argyll & Bute Council wish to appoint an appropriately qualified and experienced design team to develop the Tarbert to Whitehouse Active Travel Path project from the current concept design through Developed (RIBA Stage 3) and Technical (RIBA Stage 4) Design, and to be Principal Designer during construction (RIBA Stage 5). The project will require the successful tenderer to complete a range of survey, design and in-depth engagement work, including in-depth community, stakeholder and landowner engagement, topographic and utilities surveys and equality and socio-economic impact assessment (EqSEIA) to ensure route(s) identified have strong community, neighbour and landowner support and that the design drawings for the route(s) are robust, deliverable and of a high quality. These will all be subject to engagement with the community, businesses, landowners, neighbouring landowners, Argyll and Bute Council, CALMAC/CMAL, HITRANS and Transport Scotland. Lot 1: This tender is for the Tarbert to Whitehouse Active Travel Path; linking the Tarbert Ferry Terminal (OS Grid NR871688) to the Kennacraig Ferry Terminal, Skipness Road End (B8001) and Whitehouse (OS Grid NR817613), and will build upon the concept design developed for the route (Connected Transport Planning, 2026). Argyll & Bute Council wish to appoint an appropriately qualified and experienced design team to develop the Tarbert to Whitehouse Active Travel Path project from the current concept design through Developed (RIBA Stage 3) and Technical (RIBA Stage 4) Design, and to be Principal Designer during construction (RIBA Stage 5). The project will require the successful tenderer to complete a range of survey, design and in-depth engagement work, including in-depth community, stakeholder and landowner engagement, topographic and utilities surveys and equality and socio-economic impact assessment (EqSEIA) to ensure route(s) identified have strong community, neighbour and landowner support and that the design drawings for the route(s) are robust, deliverable and of a high quality. These will all be subject to engagement with the community, businesses, landowners, neighbouring landowners, Argyll and Bute Council, CALMAC/CMAL, HITRANS and Transport Scotland.
Timeline
- Completed: Tender published14 September 2026Current notice
- Completed: Submission date9 October 2026
About the buyer
Argyll and Bute Council is a public sector buyer in the United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@argyll-and-bute-council.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@argyll-and-bute-council.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@argyll-and-bute-council.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@argyll-and-bute-council.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@argyll-and-bute-council.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@argyll-and-bute-council.gov |
Related buyers
Buyers similar to Argyll and Bute Council.
- 268£297.6m
- 236£594.3m
- 230£301.8m
- 195£1.1bn
- 192£1.2bn
- 167£31.1m
- 166£222.5m
- 148£383.1m
- 142£2.2bn
- 138£345.9m
Finding public sector work shouldn't be hard
Make your next tender search effortless with Stotles. Set up alerts, find decision maker contacts and never miss a good-fit opportunity again.