Architect led Design team services for the construction new maintenance workshops in the existing Energy Centre at SJH
Details
- Buyer
- St James's Hospital
- Value
- €180,000
- Topic
- Architectural and related services
- Published
- 8 January 2026
- Submission
- 9 February 2026
- Source
- ie:e_tenders
Tender description
The purpose of this competition is to procure a Single Point Design Team for project described. Applicants must consider the full range of potential services which may be required through the lifetime of the projects including but not limited to, (a) Full Design Team services (including leading, coordinating and managing statutory application processes) (b) Partial Design Team services (c) Replacement Design Team services (d) Building Services Engineering Design Services (M and E) (e) Civil and Structural Engineering Design Services (f) Quantity Surveying Services (g) Floor Area Analysis (h) Planning Consultation (i) Employer Representative (ER) (j) Assigned certifier services (k) PSDP Services (l) Other services of a similar nature required by the Client such as: Supporting the Contracting Authority through each of the various project life cycle stages and approval gateways as defined within DPER's Infrastructural Guidelines (previously the Public Spending Code). The project consists of the construction of new FM maintenance workshops within the existing energy centre on campus. The current proposal shows the new workshops being split over 3 new floors within an existing fallow space in the energy centre. There will be some works required to the external façade to accommodate new wondows for natural light. There will be a requirement to re-locate the LV transformer associated with the site CHP and 2 no. electrical distrbution boards to facilitate the new area. l The estimated Notional Construction Value (NCV) for the project is €1,500,000 incl VAT
Timeline
- Completed: Tender published8 January 2026Current notice
- Completed: Submission date9 February 2026
About the buyer
St James's Hospital is Ireland's largest acute academic teaching hospital and a registered charity, and buys as a healthcare organisation through its own procurement unit. The Procurement Unit sits within the Finance Directorate. Directorates draw on that unit for procurement expertise and market engagement. The hospital has tendered patient equipment maintenance by competitive dialogue, split into three lots.
Over the past 5 years, most of St James's Hospital's contract awards have been in medical equipment and pharmaceuticals, laboratory and precision equipment and security and defence equipment.
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@st-james-s-hospital.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@st-james-s-hospital.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@st-james-s-hospital.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@st-james-s-hospital.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@st-james-s-hospital.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@st-james-s-hospital.gov |
81 similar open tenders
See more open tenders related to Architectural and related services.
- Open tender
Cork City Council Housing Programme 2026-28
- Open tender
Professional Services Framework
- Open tender
PRN26144 Antrim Area Land, Design and Build
- Open tender
PRN26144 Antrim Area Land, Design and Build
Related topics
Topics related to Architect led Design team services for the construction new maintenance workshops in the existing Energy Centre at SJH, ranked by notice volume.
- 7,147£251.4bn
- 55,561£5.5tn
- 5,015£324.7bn
- 3,881£73.6bn
- 8,175£203.0bn
- 7,487£551.6bn
Related buyers
Buyers similar to St James's Hospital.
- 1
Finding public sector work shouldn't be hard
Make your next tender search effortless with Stotles. Set up alerts, find decision maker contacts and never miss a good-fit opportunity again.