Tender description
Overview The UK has an extensive network for the Transmission and Distribution of natural gas, delivering around 600TWh of gaseous fuel to Domestic, Commercial, and Industrial consumers, and almost 300TWh to generate power. In energy terms, the UK uses around three times more gas than electricity. Around 85% of households use gas as their primary source of heating. The UK has challenging and legally binding targets to reach Net Zero by 2050. In response to this the UK Government issued "The Ten Point Plan for a Green Industrial Revolution" at the end of 2020 to demonstrate its commitment to tackling greenhouse gas emissions. This set the UK's ambition to be amongst the leading countries investigating the use of hydrogen for industry and heating. This was followed by a dedicated Hydrogen Strategy in 2021 which set firm commitments around low carbon hydrogen production and trials. Wales & West Utilities is undertaking a major programme of change to support decarbonisation and deliver a Net Zero gas network. General Description of the Works (Project Summary) This project forms Phase 2 of an ongoing programme of works exploring the potential application of a novel lined rock cavern (LRC) hydrogen storage concept within WWU's network. Building on Phase 1 work, the project will provide early-stage, exploratory support to further understanding on the concept and to test its potential suitability within the network context. The work is developmental in nature and is intended to inform internal strategic understanding, rather than to progress delivery, implementation or commercial deployment. The scope requires the integration of specialist technical and regulatory expertise under the direction of a single consultant, with continuity of knowledge from previous phases being critical. Activities are focused on refining assumptions, and improving understanding of key constraints and uncertainties associated with the concept. The project is not intended to deliver investment-ready outputs, detailed design, or commercially deployable solutions. Any investigative activities and very limited in scale and undertaken solely to support early-stage concept testing and development. Scope of Contractors Work The Supplier will deliver Phase 2 of an ongoing programme of early-stage development work relating to a novel lined rock cavern hydrogen storage concept. The Supplier will provide technical and strategic support, drawing on specialist expertise where required, to further understanding of the concept and to test its potential suitability within WWU's network area. In particular, the supplier will: • Develop and refine regional subsurface understanding within previously identified areas of interest, using existing information and specialist interpretation of results • Support progressive narrowing of potential locations to inform conceptual understanding of where the lined rock cavern concept may be technically applicable • Provide high-level advisory input on surface, planning, and permitting context relevant to early-stage concept development • Test and refine key technical assumptions of the lined rock cavern concept through specialist analysis and interpretation • Undertake limited and targeted investigative activities, where necessary, solely to support early stage understanding of subsurface conditions in relation to the concept • Provide qualitative consideration of commercial and strategic factors relevant to the early-stage development of the concept • Integrate and synthesise specialist inputs into internal-facing briefing materials and reports All services will be delivered to support early-stage design and development, and to test suitability of the concept, rather than to progress delivery, implementation, or commercial deployment. Anticipated Total Cost of the Contract is £600,000. Contract Term is two (2) years. ## Contract award
Timeline
- Completed: Award published30 December 2025Current notice
- Completed: Award date30 December 2025
- Next: Contract expiry date25 February 2028in 18 months
About the buyer
Wales & West Utilities Ltd is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 71313000 · Environmental engineering consultancy services
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@wales-west-utilities-ltd.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@wales-west-utilities-ltd.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@wales-west-utilities-ltd.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@wales-west-utilities-ltd.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@wales-west-utilities-ltd.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@wales-west-utilities-ltd.gov |
12 similar open tenders
See more open tenders related to Lined Rock Caverns.
- Open tender
Property Works and Consultancy DPS
- Open tender
Housing Maintenance & Repair
- Open tender
Construction Professional Services DPS
- Open tender
Refurbishment work
- Open tender
Building services consultancy services
Related topics
Topics related to Lined Rock Caverns, ranked by notice volume.
- 173,470£11.6tn
Related buyers
Buyers similar to Wales & West Utilities Ltd.
- 130£849.0m
- 81£104.7m
- 74£3.3bn
- 70£2.5bn
- 64£3.4bn
- 57£1.5bn
- 43£11.2bn
- 42£31.2m
- 35£137.6m
- 33£4.1bn
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.