Closed tender

EEAST - Framework for Vehicle Windscreen Service (24-T24)

Details

Value
GBP 5,000,000
Topic
Repair, maintenance and associated services of vehicles and related equipment
Published
25 February 2025
Submission
7 April 2025

Tender description

The Authority is having a major concern regarding windscreen repairs and replacement. The<br/>current turnaround times are 3 to 4 days meaning vehicles are off the road while waiting repair and<br/>calibration. The intention is to reduce turnaround times in order to retain operational vehicles on the<br/>road with less downtime. It is the Authority’s desire is to move as many non-operational vehicle<br/>Windscreen repair to its main windscreen suppliers where possible. However, the Authority’s<br/>recognises the need to have contracted parties to provide an alternative windscreen roadside,<br/>station or workshop repair and especially a more speedier replacement calibration solution, where<br/>there is no current capacity. Vehicles covered under the arrangement will be of varying designation,<br/>can be marked and unmarked, but need to be treated with the same priority. Note, at Appendix B2<br/>is a list of the EEAST 125 sites so the supplier may be called on to attend either an Ambulance<br/>station or the local workshop. Vehicle fleets will vary in size and composition over time and the<br/>Suppliers will need to be agile to accommodate new vehicle types. Lot 2B: 10. LOT 2B SOUTH WEST AND SOUTH EAST LONDON - LONDON AMBULANCE SERVICE: The Authority is having a major concern regarding windscreen repairs and replacement. The<br/>current turnaround times are 3 to 4 days meaning vehicles are off the road while waiting repair and<br/>calibration. The intention is to reduce turnaround times in order to retain operational vehicles on the<br/>road with less downtime. It is the Authority’s desire is to move as many non-operational vehicle<br/>Windscreen repair to its main windscreen suppliers where possible. However, the Authority’s<br/>recognises the need to have contracted parties to provide an alternative windscreen roadside,<br/>station or workshop repair and especially a more speedier replacement calibration solution, where<br/>there is no current capacity. Vehicles covered under the arrangement will be of varying designation,<br/>can be marked and unmarked, but need to be treated with the same priority. Note, at Appendix B2<br/>is a list of the EEAST 125 sites so the supplier may be called on to attend either an Ambulance<br/>station or the local workshop. Vehicle fleets will vary in size and composition over time and the<br/>Suppliers will need to be agile to accommodate new vehicle types.<br/><br/> The bidder can bid for any number of Lots, with a maximum of 3 sub lots per Ambulance Trust. Lot 3A: 11. LOT 3A KENT - SOUTH EAST COASTAL AMBULANCE SERVICE: The Authority is having a major concern regarding windscreen repairs and replacement. The<br/>current turnaround times are 3 to 4 days meaning vehicles are off the road while waiting repair and<br/>calibration. The intention is to reduce turnaround times in order to retain operational vehicles on the<br/>road with less downtime. It is the Authority’s desire is to move as many non-operational vehicle<br/>Windscreen repair to its main windscreen suppliers where possible. However, the Authority’s<br/>recognises the need to have contracted parties to provide an alternative windscreen roadside,<br/>station or workshop repair and especially a more speedier replacement calibration solution, where<br/>there is no current capacity. Vehicles covered under the arrangement will be of varying designation,<br/>can be marked and unmarked, but need to be treated with the same priority. Note, at Appendix B2<br/>is a list of the EEAST 125 sites so the supplier may be called on to attend either an Ambulance<br/>station or the local workshop. Vehicle fleets will vary in size and composition over time and the<br/>Suppliers will need to be agile to accommodate new vehicle types.<br/><br/> The bidder can bid for any number of Lots, with a maximum of 3 sub lots per Ambulance Trust. Lot 3B: 12. LOT 3B SURREY - SOUTH EAST COASTAL AMBULANCE SERVICE: The Authority is having a major concern regarding windscreen repairs and replacement. The<br/>current turnaround times are 3 to 4 days meaning vehicles are off the road while waiting repair and<br/>calibration. The intention is to reduce turnaround times in order to retain operational vehicles on the<br/>road with less downtime. It is the Authority’s desire is to move as many non-operational vehicle<br/>Windscreen repair to its main windscreen suppliers where possible. However, the Authority’s<br/>recognises the need to have contracted parties to provide an alternative windscreen roadside,<br/>station or workshop repair and especially a more speedier replacement calibration solution, where<br/>there is no current capacity. Vehicles covered under the arrangement will be of varying designation,<br/>can be marked and unmarked, but need to be treated with the same priority. Note, at Appendix B2<br/>is a list of the EEAST 125 sites so the supplier may be called on to attend either an Ambulance<br/>station or the local workshop. Vehicle fleets will vary in size and composition over time and the<br/>Suppliers will need to be agile to accommodate new vehicle types.<br/><br/> The bidder can bid for any number of Lots, with a maximum of 3 sub lots per Ambulance Trust. Lot 3C: 13. LOT 3C SUSSEX - SOUTH EAST COASTAL AMBULANCE SERVICE: SOUTH EAST COASTAL AMBULANCE SERVICE: LOT 3C SUSSEX, Lot 4A: 14. LOT 4A SOMERSET - SOUTH WESTERN AMBULANCE SERVICE: The Authority is having a major concern regarding windscreen repairs and replacement. The<br/>current turnaround times are 3 to 4 days meaning vehicles are off the road while waiting repair and<br/>calibration. The intention is to reduce turnaround times in order to retain operational vehicles on the<br/>road with less downtime. It is the Authority’s desire is to move as many non-operational vehicle<br/>Windscreen repair to its main windscreen suppliers where possible. However, the Authority’s<br/>recognises the need to have contracted parties to provide an alternative windscreen roadside,<br/>station or workshop repair and especially a more speedier replacement calibration solution, where<br/>there is no current capacity. Vehicles covered under the arrangement will be of varying designation,<br/>can be marked and unmarked, but need to be treated with the same priority. Note, at Appendix B2<br/>is a list of the EEAST 125 sites so the supplier may be called on to attend either an Ambulance<br/>station or the local workshop. Vehicle fleets will vary in size and composition over time and the<br/>Suppliers will need to be agile to accommodate new vehicle types.<br/><br/> The bidder can bid for any number of Lots, with a maximum of 3 sub lots per Ambulance Trust. Lot 4B: 15. LOT 4B GLOCS - SOUTH WESTERN AMBULANCE SERVICE: The Authority is having a major concern regarding windscreen repairs and replacement. The<br/>current turnaround times are 3 to 4 days meaning vehicles are off the road while waiting repair and<br/>calibration. The intention is to reduce turnaround times in order to retain operational vehicles on the<br/>road with less downtime. It is the Authority’s desire is to move as many non-operational vehicle<br/>Windscreen repair to its main windscreen suppliers where possible. However, the Authority’s<br/>recognises the need to have contracted parties to provide an alternative windscreen roadside,<br/>station or workshop repair and especially a more speedier replacement calibration solution, where<br/>there is no current capacity. Vehicles covered under the arrangement will be of varying designation,<br/>can be marked and unmarked, but need to be treated with the same priority. Note, at Appendix B2<br/>is a list of the EEAST 125 sites so the supplier may be called on to attend either an Ambulance<br/>station or the local workshop. Vehicle fleets will vary in size and composition over time and the<br/>Suppliers will need to be agile to accommodate new vehicle types.<br/><br/> The bidder can bid for any number of Lots, with a maximum of 3 sub lots per Ambulance Trust. Lot 4C: 16. LOT 4C WILTS - SOUTH WESTERN AMBULANCE SERVICE The Authority is having a major concern regarding windscreen repairs and replacement. The<br/>current turnaround times are 3 to 4 days meaning vehicles are off the road while waiting repair and<br/>calibration. The intention is to reduce turnaround times in order to retain operational vehicles on the<br/>road with less downtime. It is the Authority’s desire is to move as many non-operational vehicle<br/>Windscreen repair to its main windscreen suppliers where possible. However, the Authority’s<br/>recognises the need to have contracted parties to provide an alternative windscreen roadside,<br/>station or workshop repair and especially a more speedier replacement calibration solution, where<br/>there is no current capacity. Vehicles covered under the arrangement will be of varying designation,<br/>can be marked and unmarked, but need to be treated with the same priority. Note, at Appendix B2<br/>is a list of the EEAST 125 sites so the supplier may be called on to attend either an Ambulance<br/>station or the local workshop. Vehicle fleets will vary in size and composition over time and the<br/>Suppliers will need to be agile to accommodate new vehicle types.<br/><br/> The bidder can bid for any number of Lots, with a maximum of 3 sub lots per Ambulance Trust. Lot 4D: 17. LOT 4D DEVON - SOUTH WESTERN AMBULANCE SERVICE; The Authority is having a major concern regarding windscreen repairs and replacement. The<br/>current turnaround times are 3 to 4 days meaning vehicles are off the road while waiting repair and<br/>calibration. The intention is to reduce turnaround times in order to retain operational vehicles on the<br/>road with less downtime. It is the Authority’s desire is to move as many non-operational vehicle<br/>Windscreen repair to its main windscreen suppliers where possible. However, the Authority’s<br/>recognises the need to have contracted parties to provide an alternative windscreen roadside,<br/>station or workshop repair and especially a more speedier replacement calibration solution, where<br/>there is no current capacity. Vehicles covered under the arrangement will be of varying designation,<br/>can be marked and unmarked, but need to be treated with the same priority. Note, at Appendix B2<br/>is a list of the EEAST 125 sites so the supplier may be called on to attend either an Ambulance<br/>station or the local workshop. Vehicle fleets will vary in size and composition over time and the<br/>Suppliers will need to be agile to accommodate new vehicle types.<br/><br/> The bidder can bid for any number of Lots, with a maximum of 3 sub lots per Ambulance Trust. Lot 4E: 18. LOT 4E DORSET - SOUTH WESTERN AMBULANCE SERVICE: The Authority is having a major concern regarding windscreen repairs and replacement. The<br/>current turnaround times are 3 to 4 days meaning vehicles are off the road while waiting repair and<br/>calibration. The intention is to reduce turnaround times in order to retain operational vehicles on the<br/>road with less downtime. It is the Authority’s desire is to move as many non-operational vehicle<br/>Windscreen repair to its main windscreen suppliers where possible. However, the Authority’s<br/>recognises the need to have contracted parties to provide an alternative windscreen roadside,<br/>station or workshop repair and especially a more speedier replacement calibration solution, where<br/>there is no current capacity. Vehicles covered under the arrangement will be of varying designation,<br/>can be marked and unmarked, but need to be treated with the same priority. Note, at Appendix B2<br/>is a list of the EEAST 125 sites so the supplier may be called on to attend either an Ambulance<br/>station or the local workshop. Vehicle fleets will vary in size and composition over time and the<br/>Suppliers will need to be agile to accommodate new vehicle types.<br/><br/> The bidder can bid for any number of Lots, with a maximum of 3 sub lots per Ambulance Trust. Lot 4F: 19. LOT 4F CORNWALL AND ISLES OF SCILLY - SOUTH WESTERN AMBULANCE SERVICE; The Authority is having a major concern regarding windscreen repairs and replacement. The<br/>current turnaround times are 3 to 4 days meaning vehicles are off the road while waiting repair and<br/>calibration. The intention is to reduce turnaround times in order to retain operational vehicles on the<br/>road with less downtime. It is the Authority’s desire is to move as many non-operational vehicle<br/>Windscreen repair to its main windscreen suppliers where possible. However, the Authority’s<br/>recognises the need to have contracted parties to provide an alternative windscreen roadside,<br/>station or workshop repair and especially a more speedier replacement calibration solution, where<br/>there is no current capacity. Vehicles covered under the arrangement will be of varying designation,<br/>can be marked and unmarked, but need to be treated with the same priority. Note, at Appendix B2<br/>is a list of the EEAST 125 sites so the supplier may be called on to attend either an Ambulance<br/>station or the local workshop. Vehicle fleets will vary in size and composition over time and the<br/>Suppliers will need to be agile to accommodate new vehicle types.<br/><br/> The bidder can bid for any number of Lots, with a maximum of 3 sub lots per Ambulance Trust. Lot 5A: 20. LOT 5A BERKS - SOUTH CENTRAL AMBULANCE SERVICE: The Authority is having a major concern regarding windscreen repairs and replacement. The<br/>current turnaround times are 3 to 4 days meaning vehicles are off the road while waiting repair and<br/>calibration. The intention is to reduce turnaround times in order to retain operational vehicles on the<br/>road with less downtime. It is the Authority’s desire is to move as many non-operational vehicle<br/>Windscreen repair to its main windscreen suppliers where possible. However, the Authority’s<br/>recognises the need to have contracted parties to provide an alternative windscreen roadside,<br/>station or workshop repair and especially a more speedier replacement calibration solution, where<br/>there is no current capacity. Vehicles covered under the arrangement will be of varying designation,<br/>can be marked and unmarked, but need to be treated with the same priority. Note, at Appendix B2<br/>is a list of the EEAST 125 sites so the supplier may be called on to attend either an Ambulance<br/>station or the local workshop. Vehicle fleets will vary in size and composition over time and the<br/>Suppliers will need to be agile to accommodate new vehicle types.<br/><br/> The bidder can bid for any number of Lots, with a maximum of 3 sub lots per Ambulance Trust. Lot 5B: 21. LOT 5B BUCKS - SOUTH CENTRAL AMBULANCE SERVICE: The Authority is having a major concern regarding windscreen repairs and replacement. The<br/>current turnaround times are 3 to 4 days meaning vehicles are off the road while waiting repair and<br/>calibration. The intention is to reduce turnaround times in order to retain operational vehicles on the<br/>road with less downtime. It is the Authority’s desire is to move as many non-operational vehicle<br/>Windscreen repair to its main windscreen suppliers where possible. However, the Authority’s<br/>recognises the need to have contracted parties to provide an alternative windscreen roadside,<br/>station or workshop repair and especially a more speedier replacement calibration solution, where<br/>there is no current capacity. Vehicles covered under the arrangement will be of varying designation,<br/>can be marked and unmarked, but need to be treated with the same priority. Note, at Appendix B2<br/>is a list of the EEAST 125 sites so the supplier may be called on to attend either an Ambulance<br/>station or the local workshop. Vehicle fleets will vary in size and composition over time and the<br/>Suppliers will need to be agile to accommodate new vehicle types.<br/><br/> The bidder can bid for any number of Lots, with a maximum of 3 sub lots per Ambulance Trust. Lot 5C: 22. LOT 5C OXON - SOUTH CENTRAL AMBULANCE SERVICE: The Authority is having a major concern regarding windscreen repairs and replacement. The<br/>current turnaround times are 3 to 4 days meaning vehicles are off the road while waiting repair and<br/>calibration. The intention is to reduce turnaround times in order to retain operational vehicles on the<br/>road with less downtime. It is the Authority’s desire is to move as many non-operational vehicle<br/>Windscreen repair to its main windscreen suppliers where possible. However, the Authority’s<br/>recognises the need to have contracted parties to provide an alternative windscreen roadside,<br/>station or workshop repair and especially a more speedier replacement calibration solution, where<br/>there is no current capacity. Vehicles covered under the arrangement will be of varying designation,<br/>can be marked and unmarked, but need to be treated with the same priority. Note, at Appendix B2<br/>is a list of the EEAST 125 sites so the supplier may be called on to attend either an Ambulance<br/>station or the local workshop. Vehicle fleets will vary in size and composition over time and the<br/>Suppliers will need to be agile to accommodate new vehicle types.<br/><br/> The bidder can bid for any number of Lots, with a maximum of 3 sub lots per Ambulance Trust. Lot 1A: 3.LOT 1A BEDS - EAST OF ENGLAND AMBULANCE SERVICE: The Authority is having a major concern regarding windscreen repairs and replacement. The<br/>current turnaround times are 3 to 4 days meaning vehicles are off the road while waiting repair and<br/>calibration. The intention is to reduce turnaround times in order to retain operational vehicles on the<br/>road with less downtime. It is the Authority’s desire is to move as many non-operational vehicle<br/>Windscreen repair to its main windscreen suppliers where possible. However, the Authority’s<br/>recognises the need to have contracted parties to provide an alternative windscreen roadside,<br/>station or workshop repair and especially a more speedier replacement calibration solution, where<br/>there is no current capacity. Vehicles covered under the arrangement will be of varying designation,<br/>can be marked and unmarked, but need to be treated with the same priority. Note, at Appendix B2<br/>is a list of the EEAST 125 sites so the supplier may be called on to attend either an Ambulance<br/>station or the local workshop. Vehicle fleets will vary in size and composition over time and the<br/>Suppliers will need to be agile to accommodate new vehicle types.<br/><br/> The bidder can bid for any number of Lots, with a maximum of 3 sub lots per Ambulance Trust. Lot 1B: 4. LOT 1B CAMBS - EAST OF ENGLAND AMBULANCE SERVICE: The Authority is having a major concern regarding windscreen repairs and replacement. The<br/>current turnaround times are 3 to 4 days meaning vehicles are off the road while waiting repair and<br/>calibration. The intention is to reduce turnaround times in order to retain operational vehicles on the<br/>road with less downtime. It is the Authority’s desire is to move as many non-operational vehicle<br/>Windscreen repair to its main windscreen suppliers where possible. However, the Authority’s<br/>recognises the need to have contracted parties to provide an alternative windscreen roadside,<br/>station or workshop repair and especially a more speedier replacement calibration solution, where<br/>there is no current capacity. Vehicles covered under the arrangement will be of varying designation,<br/>can be marked and unmarked, but need to be treated with the same priority. Note, at Appendix B2<br/>is a list of the EEAST 125 sites so the supplier may be called on to attend either an Ambulance<br/>station or the local workshop. Vehicle fleets will vary in size and composition over time and the<br/>Suppliers will need to be agile to accommodate new vehicle types.<br/><br/> The bidder can bid for any number of Lots, with a maximum of 3 sub lots per Ambulance Trust. Lot 1C: 5. LOT 1C HERTS - EAST OF ENGLAND AMBULANCE SERVICE: The Authority is having a major concern regarding windscreen repairs and replacement. The<br/>current turnaround times are 3 to 4 days meaning vehicles are off the road while waiting repair and<br/>calibration. The intention is to reduce turnaround times in order to retain operational vehicles on the<br/>road with less downtime. It is the Authority’s desire is to move as many non-operational vehicle<br/>Windscreen repair to its main windscreen suppliers where possible. However, the Authority’s<br/>recognises the need to have contracted parties to provide an alternative windscreen roadside,<br/>station or workshop repair and especially a more speedier replacement calibration solution, where<br/>there is no current capacity. Vehicles covered under the arrangement will be of varying designation,<br/>can be marked and unmarked, but need to be treated with the same priority. Note, at Appendix B2<br/>is a list of the EEAST 125 sites so the supplier may be called on to attend either an Ambulance<br/>station or the local workshop. Vehicle fleets will vary in size and composition over time and the<br/>Suppliers will need to be agile to accommodate new vehicle types.<br/><br/> The bidder can bid for any number of Lots, with a maximum of 3 sub lots per Ambulance Trust. Lot 1D: 6. LOT 1D ESSEX - EAST OF ENGLAND AMBULANCE SERVICE: The Authority is having a major concern regarding windscreen repairs and replacement. The<br/>current turnaround times are 3 to 4 days meaning vehicles are off the road while waiting repair and<br/>calibration. The intention is to reduce turnaround times in order to retain operational vehicles on the<br/>road with less downtime. It is the Authority’s desire is to move as many non-operational vehicle<br/>Windscreen repair to its main windscreen suppliers where possible. However, the Authority’s<br/>recognises the need to have contracted parties to provide an alternative windscreen roadside,<br/>station or workshop repair and especially a more speedier replacement calibration solution, where<br/>there is no current capacity. Vehicles covered under the arrangement will be of varying designation,<br/>can be marked and unmarked, but need to be treated with the same priority. Note, at Appendix B2<br/>is a list of the EEAST 125 sites so the supplier may be called on to attend either an Ambulance<br/>station or the local workshop. Vehicle fleets will vary in size and composition over time and the<br/>Suppliers will need to be agile to accommodate new vehicle types.<br/><br/> The bidder can bid for any number of Lots, with a maximum of 3 sub lots per Ambulance Trust. Lot 1E: 7. LOT 1E NORFOLK - EAST OF ENGLAND AMBULANCE SERVICE: The Authority is having a major concern regarding windscreen repairs and replacement. The<br/>current turnaround times are 3 to 4 days meaning vehicles are off the road while waiting repair and<br/>calibration. The intention is to reduce turnaround times in order to retain operational vehicles on the<br/>road with less downtime. It is the Authority’s desire is to move as many non-operational vehicle<br/>Windscreen repair to its main windscreen suppliers where possible. However, the Authority’s<br/>recognises the need to have contracted parties to provide an alternative windscreen roadside,<br/>station or workshop repair and especially a more speedier replacement calibration solution, where<br/>there is no current capacity. Vehicles covered under the arrangement will be of varying designation,<br/>can be marked and unmarked, but need to be treated with the same priority. Note, at Appendix B2<br/>is a list of the EEAST 125 sites so the supplier may be called on to attend either an Ambulance<br/>station or the local workshop. Vehicle fleets will vary in size and composition over time and the<br/>Suppliers will need to be agile to accommodate new vehicle types.<br/><br/> The bidder can bid for any number of Lots, with a maximum of 3 sub lots per Ambulance Trust. Lot 1F: 8. LOT 1F SUFFOLK - EAST OF ENGLAND AMBULANCE SERVICE: The Authority is having a major concern regarding windscreen repairs and replacement. The<br/>current turnaround times are 3 to 4 days meaning vehicles are off the road while waiting repair and<br/>calibration. The intention is to reduce turnaround times in order to retain operational vehicles on the<br/>road with less downtime. It is the Authority’s desire is to move as many non-operational vehicle<br/>Windscreen repair to its main windscreen suppliers where possible. However, the Authority’s<br/>recognises the need to have contracted parties to provide an alternative windscreen roadside,<br/>station or workshop repair and especially a more speedier replacement calibration solution, where<br/>there is no current capacity. Vehicles covered under the arrangement will be of varying designation,<br/>can be marked and unmarked, but need to be treated with the same priority. Note, at Appendix B2<br/>is a list of the EEAST 125 sites so the supplier may be called on to attend either an Ambulance<br/>station or the local workshop. Vehicle fleets will vary in size and composition over time and the<br/>Suppliers will need to be agile to accommodate new vehicle types.<br/><br/> The bidder can bid for any number of Lots, with a maximum of 3 sub lots per Ambulance Trust. Lot 2A: 9. LOT 2A NORTH WEST. NORTH AND NORTH EAST LONDON - LONDON AMBULANCE SERVICE: The Authority is having a major concern regarding windscreen repairs and replacement. The<br/>current turnaround times are 3 to 4 days meaning vehicles are off the road while waiting repair and<br/>calibration. The intention is to reduce turnaround times in order to retain operational vehicles on the<br/>road with less downtime. It is the Authority’s desire is to move as many non-operational vehicle<br/>Windscreen repair to its main windscreen suppliers where possible. However, the Authority’s<br/>recognises the need to have contracted parties to provide an alternative windscreen roadside,<br/>station or workshop repair and especially a more speedier replacement calibration solution, where<br/>there is no current capacity. Vehicles covered under the arrangement will be of varying designation,<br/>can be marked and unmarked, but need to be treated with the same priority. Note, at Appendix B2<br/>is a list of the EEAST 125 sites so the supplier may be called on to attend either an Ambulance<br/>station or the local workshop. Vehicle fleets will vary in size and composition over time and the<br/>Suppliers will need to be agile to accommodate new vehicle types.<br/><br/> The bidder can bid for any number of Lots, with a maximum of 3 sub lots per Ambulance Trust.

Timeline

  1. Completed: Tender published25 February 2025
    Current notice
  2. Completed: Submission date7 April 2025

About the buyer

East of England Ambulance Service NHS Trust is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.

Relevant CPV codes

  • 50100000 · Repair, maintenance and associated services of vehicles and related equipment

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?
Sign-up to enrich

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

1 similar open tenders

See more open tenders related to EEAST - Framework for Vehicle Windscreen Service (24-T24).

Explore all open tenders

Related topics

Topics related to EEAST - Framework for Vehicle Windscreen Service (24-T24), ranked by notice volume.

View all topics
TopicCountValue
  1. 3,620
    £736.3bn
  2. 4,088
    £269.5bn

Win more public sector contracts

Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.