Contract for Supply, Installation and Maintenance of an Integrated Steam Generation System (Refurbished or New) on the basis of a Turnkey Solution for Irish Bioeconomy Foundation
Details
- Value
- €150,000
- Source
- eTenders Ireland
- Topic
- Boiler installations
- Published
- 27 February 2025
- Submission
- 31 March 2025
Tender description
The Contracting Authority seeks tenders under this competitive Open procedure for the award of a contract for the Supply, Installation and Maintenance of an Integrated Steam Generation System. The Contracting Authority anticipates that it will identify the most economically advantageous tender to carry out a live demonstration of the Integrated Steam Generation System in operation to verify to their satisfaction that the minimum requirements are met. The Integrated Steam System must be ready for dispatch within 2 to 4 weeks of order. Irish Bioeconomy Foundation request that the supply and installation of the Integrated Steam Generation System be inclusive of containerised water treatment, containerised gas fired boiler, installation of insulated pipework (up to 150m).
Timeline
- TenderThis notice (current page)
- Published
- 27 Feb 2025
- Deadline
- 31 Mar 2025
About the buyer
Irish Bioeconomy Foundation CLG is a public sector buyer in Ireland publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@irish-bioeconomy-foundation-clg.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@irish-bioeconomy-foundation-clg.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@irish-bioeconomy-foundation-clg.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@irish-bioeconomy-foundation-clg.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@irish-bioeconomy-foundation-clg.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@irish-bioeconomy-foundation-clg.gov |
32 similar open tenders
See more open tenders related to Boiler installations.
Related topics
Topics related to Contract for Supply, Installation and Maintenance of an Integrated Steam Generation System (Refurbished or New) on the basis of a Turnkey Solution for Irish Bioeconomy Foundation, ranked by notice volume.
- 45,832£1.8tn
Finding public sector work shouldn't be hard
Make your next tender search effortless with Stotles. Set up alerts, find decision maker contacts and never miss a good-fit opportunity again.