TC01428 South Rail Terminal Line 3 Upgrade
Details
- Value
- GBP 475,000
- Topic
- Rail locomotives and tenders
- Published
- 20 November 2025
- Submission
- 19 December 2025
- Source
- uk:procontracts
Tender description
The Port of Felixstowe South Rail Terminal has a length of approximately 500m. Line 3 requires replacement of 460m of rail including the removal and disposal of all rail, timber sleepers and track ballast and replacement with new including the replacement of the timber sleepers with concrete sleepers. The Works comprise but are not limited to: Take up existing rails and dispose off site Take up existing sleepers and dispose off site Take up existing upper and lower ballast and dispose Install new lower ballast on PW1 Terram Install new concrete sleepers and new rail Install new upper ballast Tamp and final alignment using universal tamping machine Install MoT Type 1 footways to 6 foot either side of line 3 Rail Operations run 24/7 6 days a week. It is proposed that the rail panels are assembled off-line in a nearby site compound and the installation works are undertaken over two consecutive 36 hour weekend possessions whereby half of the track is replaced each weekend. The Port will make its rail mounted gantry crane and container reach handler plant available to handle and place sections of built up track during the possession. Keywords: Rail Maintenance, Railway Line Replacement
Timeline
- Completed: Tender published20 November 2025Current notice
- Completed: Submission date19 December 2025
About the buyer
Hutchison Ports (UK) Limited is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 34610000 · Rail locomotives and tenders
- 34621200 · Railway maintenance or service vehicles
- 34622000 · Railway and tramway passenger coaches, and trolleybuses
- 34630000 · Parts of railway or tramway locomotives or rolling stock; railways traffic-control equipment
- 34940000 · Railway equipment
- 34941000 · Rails and accessories
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@hutchison-ports-uk-limited.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@hutchison-ports-uk-limited.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@hutchison-ports-uk-limited.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@hutchison-ports-uk-limited.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@hutchison-ports-uk-limited.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@hutchison-ports-uk-limited.gov |
3 similar open tenders
See more open tenders related to TC01428 South Rail Terminal Line 3 Upgrade.
Related topics
Topics related to TC01428 South Rail Terminal Line 3 Upgrade, ranked by notice volume.
- 4,088£269.5bn
Related buyers
Buyers similar to Hutchison Ports (UK) Limited.
- 131£110.5m
- 45£26.8m
- 41£109.1m
- 35£1.8m
- 31—
- 28£12.8m
- 28£3.3m
- 28£4.1m
- 25£10.2m
- 19£4.2bn
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.