Task Order from PDF framework for 612093 A46 Guys Cliffe Interchange

Details

Value
GBP 167,882.45
Duration
4 months
Topic
Surface work for highways
Published
19 November 2025

Tender description

Background Information for the proposed Work Order A46 Guys Cliffe IC contains two under bridges that carry the dual carriageway Warwick bypass over the interchange link roads with the A429 and B4115. The two bridges are single span simply supported structures with composite decks comprised of pre-stressed beams and 200mm thick slabs cast upon permanent formwork between beams. The end supports are reinforced concrete cantilever abutments, which are constructed in two sections and separated by a movement joint at the centre line. Each abutment is flanked by reinforced concrete tapered wing walls. The deck is free to move at the south end and fixed at the north end In November 2003, secondary Open Box Beam (OBB) Vehicle Restraint Systems (VRS) were installed on both sides of both structures to protect the existing substandard BACO Aluminum parapets (P1 System). The OBB barrier is flared back and connected into the Tensioned Corrugated Beams (TCB) barrier apart from ramped OBB barrier on the departure end of the South Bridge. This secondary OBB has substandard set-back and working width. The bridge records indicate that both bridges were re-waterproofed in 1993 by Acrylic and Polyurethane spray over the entire deck and again in 2003 with spray applied system at the verges only (on top of new C50 verge concrete) in conjunction with parapet protection works (OBB barrier installation). This is based on the 2003 Contract Drawing contained within IAMIS (S.22.002/A) and service life can be considered for minimum 35 years. The existing deck waterproofing at the North Bridge was damaged on both the northbound and southbound carriageways during a resurfacing intervention in 2013. The waterproofing remains in its damaged state. Following the option study undertaken by Kier to address the damaged waterproofing at the north bridge and the substandard secondary protection at both bridges, an addendum to the Options report was submitted. The addendum VRS replacement option on both bridges is to replace the VRS with new N2 W1 metal VRS and to replace the current verge with a new reinforced concrete plinth with cast-in cradles to form a fixing for the VRS and resin anchoring steel 'U' bars into the bridge deck. For the North Bridge, waterproofing will be sprayed from the new plinth, under the kerb, across the carriageway, and shall form a joint with the existing central reserve waterproofing in the channel fronting the kerb. For the South Bridge, waterproofing will be sprayed from the new plinth, under the kerb, and shall form a joint with the existing carriageway waterproofing in the channel fronting the kerb. A departure from standards has been approved for the new VRS to have reduced setbacks. An asbestos survey and adhesion testing of

Timeline

  1. Completed: Award date30 June 2025
  2. Completed: Contract expiry date13 November 2025
  3. Completed: Award published19 November 2025
    Current notice

About the buyer

National Highways Limited is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.

Relevant CPV codes

  • 45233210 · Surface work for highways

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?
Sign-up to enrich

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

Related buyers

Buyers similar to National Highways Limited.

View all buyers

Win more public sector contracts

Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.