Viability Study and Options Appraisal for historic Boilerhouse
Details
- Value
- GBP 9,909
- Topic
- Museum services and preservation services of historical sites and buildings
- Published
- 9 October 2025
- Submission
- 17 October 2025
Tender description
This project will focus on assessing a range of options for future uses of the museum’s derelict boiler house enabling it to be stabilised and accessible to visitors. Developed to RIBA Stage 2, these options will reflect upon the museum’s strategic objectives including; a. Enhancing collections preservation and access – stabilising / restoring the building, preserving its unique Lancashire Boilers and developing interpretation opportunities. b. Development of a connected visitor journey at the museum’s historic core through the provision of public access alongside and ideally within a significant building. c. Enhancing interpretation and learning through the development of displays telling the stories of former workers, the building’s history and the energy story. d. Assessing potential events provision and income generation, central to the museum’s ongoing sustainability Lot 1: Description The Boiler House at Lady Victoria Colliery is one of the oldest and most significant buildings on the site. Constructed in 1915-1917 the building was originally used for power generation. It was subsequently fitted out with 12 Lancashire Boilers from Gretna Munitions Factory, and remains as one of the few surviving last batteries of boilers of this type in the UK. Steam was the main power source for the colliery, and the survival of the boiler house demonstrates the significance of steam within the context of changes to energy demands and the application of emerging technology. The building is officially designated as At Risk and contained within the listing of Lady Victoria (LB14604). Scope of Works 1. Review existing reports (structural, conservation, business plan, masterplan and past structural concept) 2. Engage with client to evaluate and refine preferred options, considerate of priority works 3. Produce visualisations and base drawings to for design solutions to RIBA Stage 2 4. Collate outline costs according to design options 5. Compile final Viability Study report with options and outline costs.
Timeline
- Completed: Tender published9 October 2025Current notice
- Completed: Submission date17 October 2025
About the buyer
NATIONAL MINING MUSEUM SCOTLAND TRUST is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 92520000 · Museum services and preservation services of historical sites and buildings
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@national-mining-museum-scotland-trust.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@national-mining-museum-scotland-trust.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@national-mining-museum-scotland-trust.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@national-mining-museum-scotland-trust.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@national-mining-museum-scotland-trust.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@national-mining-museum-scotland-trust.gov |
1 similar open tenders
See more open tenders related to Viability Study and Options Appraisal for historic Boilerhouse.
Related topics
Topics related to Viability Study and Options Appraisal for historic Boilerhouse, ranked by notice volume.
- 1,745£636.1bn
- 11,175£1.0tn
- 26,969£1.7tn
Related buyers
Buyers similar to NATIONAL MINING MUSEUM SCOTLAND TRUST.
- 652£2.6bn
- 515£5.9bn
- 229£379.0m
- 212£257.4m
- 198£4.0bn
- 194£202.8m
- 186£991.8m
- 176£88.4m
- 165£1.0bn
- 160£63.4m
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.
