Brewery Turnback - ES6-8 Civil Engineering
Details
- Value
- GBP 750,000
- Topic
- Works for complete or part construction and civil engineering work
- Published
- 7 October 2025
- Submission
- 13 October 2025
- Source
- uk:contracts_finder
Tender description
Brewery Turnback an enhancement scheme funded by the DfT. Formerly known as Manchester Victoria East Turnback, it has been prioritised for early development from the Central Manchester Capacity and Performance study to boost capacity and resilience. The scheme is for the design and delivery of a West facing turnback, located at Brewery Junction. At Victoria station, the through platforms also accommodate terminating trains due to an imbalance of local services to the east and west of the station. The extended time to terminate and turnback in the platforms restricts platform availability for through services. Operational flexibility of the station would be improved if services could utilise a turnback facility to the East of the station. The turnback would also be a service recovery measure during times of perturbation. The turnback is to accommodate trains up to 6 car x 26 m vehicles (DMU and EMU); with trains being able to access the turnback to and from Platforms 3-6 at Manchester Victoria station. As part of the MNTP programme, it was identified that the provision of a turnback facility to the East of Manchester Victoria Train station would provide operational flexibility. Currently, the platforms at Manchester Victoria must accommodate terminating trains, this restricts the availability of the through platforms, impacting performance and causing a timetable constraint. In a standard hour, two services, typically from Kirkby / Preston / Wigan are booked to terminate in the through platforms before the driver changes ends and the train departs in the opposite direction. Typical turnaround times are between 5-10 minutes, meaning that the platform, and route through it, remains occupied for the duration of the turnaround. The operational flexibility of the station would be improved if services could utilise a turnback facility to the East of the station. The turnback would also be a service recovery measure during perturbation. ES2-4 design and development was undertaken by WSP Limited and accepted by Network Rail. However, there are many instances within the designs where assumptions have been made stating that the TRU works would be complete prior to commencement of the project and all as built designs and source records would be available. Ancillary Civil Engineering Scope of Work: The supply and installation of the new infrastructure. This includes, but is not limited to, the following: new cable trough route, new signal foundations, new LOC foundations, ARMCO barriers, fencing, ducting system, and URX system. This includes all handback deliverables, such as redline drawings, O&M manuals, and attendance at AMP016 walkouts.
Timeline
- Completed: Tender published7 October 2025Current notice
- Completed: Submission date13 October 2025
About the buyer
Kier Infrastructure and Overseas - CP7 NWC is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 45200000 · Works for complete or part construction and civil engineering work
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@kier-infrastructure-and-overseas-cp7-nwc.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@kier-infrastructure-and-overseas-cp7-nwc.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@kier-infrastructure-and-overseas-cp7-nwc.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@kier-infrastructure-and-overseas-cp7-nwc.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@kier-infrastructure-and-overseas-cp7-nwc.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@kier-infrastructure-and-overseas-cp7-nwc.gov |
35 similar open tenders
See more open tenders related to Brewery Turnback - ES6-8 Civil Engineering.
- Open tender
Construction and Development DPS
Related topics
Topics related to Brewery Turnback - ES6-8 Civil Engineering, ranked by notice volume.
- 11,175£1.0tn
- 26,969£1.7tn
Related buyers
Buyers similar to Kier Infrastructure and Overseas - CP7 NWC.
- 2,657£1.7bn
- 1,713£205.5bn
- 1,531£58.3bn
- 1,074£985.3m
- 949£2.3bn
- 900£690.3m
- 900£19.4bn
- 868£1.7bn
- 794£14.1bn
- 755£154.3m
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.
