Closed tender

Forest Road, Lydney Geotechnical Stabilisation

Details

Value
GBP 1,300,000
Topic
Construction work
Published
1 October 2025
Submission
13 November 2025

Tender description

This advert is intended to notify potential suppliers of the upcoming tender for the Forest Road, Lydney Geotechnical Remediation scheme. The site is located on the B4234 approximately 1.8km Northwest of the town of Lydney, Gloucestershire. The B4234 carriageway is constructed on sidelong ground and runs parallel to the River Lyd. The River Lyd runs approximately 8m below the road level. The site was identified to have defects in 2023 and has been subject to regular monitoring. The defects noted consisted of carriageway cracking, subsidence, leaning trees associated with lower slope instability and blocked gullies. A landslip occurred over a 20m length of earthwork adjacent to New Road in late 2023. The carriageway is showing signs of instability with cracking evident, and a steep face is now present at the edge of the westbound running lane. The client is looking for a Principal Contractor to deliver the construction phase of this scheme. Summary of Construction Phase key deliverables are as follows: - Provision of suitable traffic management during construction works, including full road closure and signposted diversions. - Installation of sheet piled retaining wall along an extent of 43 m – 1.6 m from carriageway edge. - Pile lengths will vary with rockhead depth, typically reaching 8.0 m. Piles will be driven to the designed toe level and cut flush with adjacent ground. - Construction of new drainage system including installation of a concrete bag headwall outfall within the embankment. - Highways reconstruction including plaining and overlay. - Installation of a VRS barrier system and wooden fencing over an extent of 131 m. - Traffic signs, kerbing, and road markings. - Coordination with BT utility diversions and protection works. A summary of the outline programme is shown below: Tender period: Thursday 9th October 2025 to Thursday 13th November 2025 Award: Monday 15th December 2025 Anticipated Works Start Date: Monday 9th February 2026 Completion: Friday 7th August 2026 Overall Duration: 26 Weeks Indicative Value: (£1.3M + £0.26M VAT) = £1.56M The proposed procurement route will be a single stage (Open Procedure) using the NEC4 ECC form of Contract, Option A Priced Contract with Activity Schedule. Full details will be available in the tender pack that we intend to advertise on Thursday 9th October 2025 Keywords: Highways

Timeline

  1. Completed: Tender published1 October 2025
    Current notice
  2. Completed: Submission date13 November 2025

About the buyer

Gloucestershire County Council is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.

Relevant CPV codes

  • 45000000 · Construction work

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?
Sign-up to enrich

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

121 similar open tenders

See more open tenders related to Forest Road, Lydney Geotechnical Stabilisation.

Explore all open tenders

Related buyers

Buyers similar to Gloucestershire County Council.

View all buyers

Win more public sector contracts

Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.