Port of Dover Ferry Charging
Details
- Buyer
- Dover Harbour Board
- Topic
- High-voltage cable
- Published
- 31 July 2025
- Source
- uk:find_a_tender
Tender description
The Port of Dover are seeking expressions of interest from strategic funding partners to work with us on an exciting new project to develop and enable the Port to facilitate green straights between Dover, Calais and Dunkirk, which will allow the port to offer ferry shore power charging. The port system generates approximately 1.1 million tonnes of CO2 annually (which is equivalent to 8% of UK maritime emissions as a whole), shipping being the largest contributor representing 75% of those emissions, the electrification of these ferries will drastically reduce these carbon and air quality emissions. The electrification of the ferries would mean that this vital trade route would also become a high-volume Green Corridor which would directly support DfT’s Maritime Decarbonisation Strategy, COP26 and the Clydebank Declaration objectives progressing the nation’s move to Net Zero 2050. This work would demonstrate a large-scale, real-world application for net zero shipping corridors, opening the door for similar investments and innovations across both the UK and the world, cementing the UK’s position as a leader in maritime decarbonisation. Whilst the works will be for the Port of Dover there is a requirement for strategic alignment with both the Port Boulogne Calais and the Port of Dunkerque. There are currently three ferry companies operating from the Port of Dover of which DFDS have made a public commitment to electrify their channel fleet by 2035, starting with 2 fully electric ferries joining the route as early as 2030. Due to the complexity, scale and capital requirements of these power demands the Port of Dover sees significant benefits in developing a strategic partnership approach. This approach would be a partnership with the Ferry operators and an appropriate 3rd party provider to deliver this step change in power for shore side ferry charging under a long-term power purchase agreement with appropriate commercial terms between parties. The intent is that the strategic funding partner will develop the following; - A new internal High Voltage (HV) network within the Port, dedicated to ferry charging, to facilitate an estimated 160MW inline with the requirements of the Ferry Operators (with on-site BESS and/or harmonisation of the ferry schedule this could reduce). - The necessary transformers, switch gear, on site BESS and cable infrastructure to allow the port to manage the power demand profile and locate power on multiple berths at the port. - Partner with a suitable supplier of the "plug" solution to allow the vessels to re-charge or connect to shore power when in berth, including power conversion equipment. Expressions of interest must be via our In-Tend Procurement Platform - available for enrolment here: https://in-tendhost.co.uk/portofdover/aspx/Home
Timeline
- Completed: Pre-tender published31 July 2025Current notice
About the buyer
Dover Harbour Board is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 31321300 · High-voltage cable
- 45232220 · Substation construction work
- 45310000 · Electrical installation work
- 45315100 · Electrical engineering installation works
- 45315300 · Electricity supply installations
- 45315400 · High voltage installation work
- 45317300 · Electrical installation work of electrical distribution apparatus
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@dover-harbour-board.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@dover-harbour-board.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@dover-harbour-board.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@dover-harbour-board.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@dover-harbour-board.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@dover-harbour-board.gov |
49 similar open tenders
See more open tenders related to Port of Dover Ferry Charging.
- Open tender
Property Works
- Open tender
UK DTE Projects (various upcoming)
- Open tender
National Grid Substation Construction
- Open tender
Electrical Maintenance Framework (2025)
- Open tender
Continuous Water Quality Monitoring (CWQM)
Related topics
Topics related to Port of Dover Ferry Charging, ranked by notice volume.
- 322£92.5bn
- 3,593£717.5bn
Related buyers
Buyers similar to Dover Harbour Board.
- 2,657£1.7bn
- 1,713£205.5bn
- 1,531£58.3bn
- 1,074£985.3m
- 949£2.3bn
- 900£690.3m
- 900£19.4bn
- 868£1.7bn
- 794£14.1bn
- 755£154.3m
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.
