Closed tender

Teddington Direct River Abstraction (TDRA) Tunnelling Main Works Contract (MWC)

Details

Value
GBP 242,000,000
Topic
Construction work
Published
28 May 2025
Submission
7 July 2025

Tender description

Design, build, test and commission of the following two main components: i) A recycled water conveyance tunnel from Mogden Sewage Treatment Works (STW) to Teddington. A new approximately 4.2km long tunnelled conveyance route approximately 3.5m internal diameter (ID) would be driven using a Tunnel Boring Machine (TBM) and constructed to connect a new Tertiary Treatment Plant (provided by others) in Mogden STW to the proposed outfall on the riverbank of the River Thames upstream of Teddington Weir. The tunnel would have four shafts. ii) River abstraction and transfer to the existing Thames Lee Tunnel (TLT): The river abstraction would be located approximately 175m upstream of the proposed new outfall. The abstracted river flow would be conveyed to the TLT through a smaller diameter (up to 2.2m ID) pipe installed using a pipe jacking technique. The scope will include, but not be limited to: Construction Design activities Architectural Building M&E Civils and Structural engineering including earthworks Enabling works Drainage Geotechnical Ground movement impact Mechanical, Electrical, Instrumentation, Control and Automation (MEICA) including a SCADA (Supervisory Control and Data Acquisition) system Hydraulic Modelling Materials durability Renewables / Carbon mitigation Rivers and Watercourses Traffic & Highways Shafts & Tunnels Utilities Disposal of excavated material The NEC4 Engineering and Construction Contract comprise two stages, with a decision point as to whether to proceed to construction between Stages One and Two. If the decision point is passed, then a Notice to Proceed (NTP) will be issued. Stage One, also known as the Early Contractor Involvement stage, will provide construction related support to the Client during its planning process, which comprises an application for a Development Consent Order (DCO). Using the DCO reference design (provided by others) as a constraint to the scope, the TDRA Tunnelling MWC will develop the design for construction, which will be integrated with construction planning, into the subsequent Stage Two, being the delivery / construction phase. The decision gate to proceed to Stage Two will be dependent on a number of matters, including: 1) An accepted design that meets the requirements of the contract; 2) agreement on a target price; and 3) the granting of the DCO. The agreement of a target price for Stage Two will be constrained by the Client's budget and will be developed in accordance with a Pricing Information Schedule appended to the contract. The Pricing Information Schedule will include an exhaustive list of specific "Adjustment Events" which may adjust the target price for Stage Two. Subject to the Client issuing a NTP, Stage Two will commence with an initial period to comply with any secondary consenting issues, followed by mobilisation to commence construction. Following construction, a testing and commissioning phase will be required with a scheduled target date of Water Available for Use (WAFU) of 31 March 2033.

Timeline

  1. Completed: Tender published28 May 2025
    Current notice
  2. Completed: Submission date7 July 2025

About the buyer

Thames Water Utilities Limited is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.

Relevant CPV codes

  • 45000000 · Construction work

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?
Sign-up to enrich

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

117 similar open tenders

See more open tenders related to Teddington Direct River Abstraction (TDRA) Tunnelling Main Works Contract (MWC).

Explore all open tenders

Related topics

Topics related to Teddington Direct River Abstraction (TDRA) Tunnelling Main Works Contract (MWC), ranked by notice volume.

View all topics
TopicCountValue
  1. 8,426
    £973.7bn
  2. 4,088
    £269.5bn
  3. 8,788
    £764.3bn

Win more public sector contracts