Closed tender

London Gateway Berth 5 Container Yard Construction

Details

Value
£60,000,000
Topic
Works for complete or part construction and civil engineering work
Published
21 May 2025
Submission
16 June 2025

Tender description

London Gateway (LGW) is planning to develop a container storage yard at London Gateway Port. The yard is located at Berth 5 of the Port. The Works include, but are not limited to, the following elements for the construction of 10 ASC modules on Berth 5 Yard, which are split between works designed by the Employer and works to be designed by the Contractor: Civil and Structure Works (Employer Designed) a) Heavy duty pavements including preparation of subgrade by high energy impact compaction (HEIC) to receive the pavement structure and associated edge restraints b) ASC rails, foundations and cable matt c) ASC buffer foundations and buffers d) Container plinths e) Reefer plinths and frames f) All tie-ins with the Berth 5 quay works, the Berth 4 works and other adjacent works. g) Surface water and hazardous drainage and associated pits h) HV, LV and communications conduits and associated pits i) Potable and fire water mains and associated pits and valves j) Sign post bases and signage k) Line marking l) Fencing and gates and associated controls m) Lightning protection earthing system n) Kerbs, ductwork, metalwork and specialist infrastructure to the landside and waterside interchange areas o) All tie-ins between the port access road and adjacent works p) Reefer and ASC substation buildings including foundations q) Light tower bases, light tower masts, fittings and fixtures. r) Potable and Fire water pumphouses Electrical Works (Design and Construct) a) Cabling works b) Installation of electrical control and protection systems c) Berth 5 ASC / Reefer substations including all switchgear and transformers d) 11kV electrical power installations to ASC cranes e) 11kV electrical power installations to Reefer f) SCADA control and monitoring systems g) LV electrical distribution and installation works including lighting network h) Installation of electrical control and protection systems

Timeline

  1. Completed: Tender published21 May 2025
    Current notice
  2. Completed: Submission date16 June 2025

About the buyer

London Gateway Port Ltd runs the London Gateway container port at Stanford le Hope. DP World UK operates the port. The port sits within the Thames Freeport. London Gateway Logistics Park lies next to the port. The terminal runs 24/7 operations. DP World is building a fifth berth at the port. Its notices cover cleaning and catering services. Security services have been tendered jointly for London Gateway and Southampton. Further notices cover the Berth 5 container yard and the Boxbay enabling civil works.

Over the past 5 years, most of London Gateway Port Ltd's contract awards have been in construction work, transport equipment and business services.

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

71 similar open tenders

See more open tenders related to Works for complete or part construction and civil engineering work.

Explore all open tenders

Related topics

Topics related to London Gateway Berth 5 Container Yard Construction, ranked by notice volume.

View all topics

Related buyers

Buyers similar to London Gateway Port Ltd.

View all buyers

Finding public sector work shouldn't be hard

Make your next tender search effortless with Stotles. Set up alerts, find decision maker contacts and never miss a good-fit opportunity again.