Heat From Mines, Detailed Desktop Studies in the West of England
Details
- Supplier(s)
- TownRock Energy
- Value
- GBP 91,600
- Duration
- 6 months
- Topic
- Feasibility study, advisory service, analysis
- Published
- 29 April 2025
- Source
- uk:contracts_finder
Tender description
With circa 100,000 homes above or near to former mines in the West of England, the potential for heat from mines needs investigation. The principle for investing £1.66m of Green Recovery Fund (part of the MCA Investment Fund) was agreed at Committee in March 2023. Heat From Mines is an investigatory project funded by the MCA in partnership with SGC to scope out potential for an operational mine water heating scheme(s) in the region. We are looking for providers to conduct five detailed desktop studies concurrently from February to June 2025. These will be in the West of England Combined Authority Area which includes Bristol City Council, South Gloucestershire Council and Bath & North East Somerset Council . The specific locations that the detailed desktop studies will be required to focus on will be determined by the project working group in January 2025 and specified in the full procurement phase from mid/late January 2025. Decisions will have been made by consideration of the output reports from two current phases of studies commenced between September to December 2024 and from an earlier detailed desktop study of South Gloucestershire from 2023. The detailed desktop studies will build upon knowledge and reports from previous study phases to produce output reports. The detailed desk top study output reports will need to provide us with detailed understanding of mines studied, water quality, structural and environmental constraints, potential drilling targets, costs of potential drilling abstraction and reinjection boreholes, all associated risks and to help us determine whether and where follow-on potential drill testing stages can take place. The studies must consider both heating and cooling potential and identify whether inter seasonal storage is possible. We also require an evaluation of the economic and social benefits and constraints from potential mine water schemes.
Timeline
- Completed: Award date7 April 2025
- Completed: Award published29 April 2025Current notice
- Completed: Contract expiry date26 September 2025
About the buyer
West of England Combined Authority is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 71241000 · Feasibility study, advisory service, analysis
- 79314000 · Feasibility study
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@west-of-england-combined-authority.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@west-of-england-combined-authority.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@west-of-england-combined-authority.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@west-of-england-combined-authority.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@west-of-england-combined-authority.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@west-of-england-combined-authority.gov |
8 similar open tenders
See more open tenders related to Heat From Mines, Detailed Desktop Studies in the West of England.
- Open tender
Construction Professional Services DPS
Related topics
Topics related to Heat From Mines, Detailed Desktop Studies in the West of England, ranked by notice volume.
- 1,250£90.8bn
Related buyers
Buyers similar to West of England Combined Authority.
- 1,016£964.6m
- 876£688.0m
- 818£1.7bn
- 757£14.1bn
- 730£153.0m
- 659£1.1bn
- 656£1.4bn
- 569£18.6bn
- 538£266.4m
- 532£2.8bn
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.
