Tender description
It is proposed to establish a Multi-Party Framework which will consist of two lots, • Lot 1 will consist of larger scale substations with a range between 110 – 400kV and an estimated cost range between £25 to £100m. • Lot 2 will consist of medium scale substations with a range between 33 – 275kV and an estimated cost range between £1 - £25m • The scope of works to be procured will include predominantly substation works including turnkey electrical, mechanical, civils and enabling works, with the inclusion of local overhead lines and cables within the curtilage of the site. • NIEN wish to retain the flexibility for each lot to utilise both Design and Build (D&B) and Engineering Procurement and Construction (EPC) models. • The default approach will be that equipment supply (transformers and switchgear etc.) will be in the scope of projects. Free issue of equipment will be limited to those projects for which NIEN have equipment ordered.
Timeline
- Completed: Tender published6 April 2025Current notice
- Completed: Submission date23 May 2025
About the buyer
Northern Ireland Electricity Networks Limited is a utility based in Belfast, with its own procurement department. The department buys materials, works and services. Regulated procurements follow the Procurement Act 2023 and the Utilities Contracts Regulations 2016, where applicable. Below-threshold procurements have a separate route.
Over the past 5 years, most of Northern Ireland Electricity Networks Limited's contract awards have been in electrical equipment and lighting, IT services and construction work.
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@northern-ireland-electricity-networks-limited.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@northern-ireland-electricity-networks-limited.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@northern-ireland-electricity-networks-limited.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@northern-ireland-electricity-networks-limited.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@northern-ireland-electricity-networks-limited.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@northern-ireland-electricity-networks-limited.gov |
4 similar open tenders
See more open tenders related to Substation construction work.
- Open tender
Major Projects QUDM
- Open tender
National Grid Substation Construction
- Open tender
Electricity Infrastructure Works
Related topics
Topics related to T322 NIEN Transmission Substation Turnkey (Amended), ranked by notice volume.
- 564£63.9bn
- 1,149£166.4bn
Related buyers
Buyers similar to NORTHERN IRELAND ELECTRICITY NETWORKS LIMITED.
- 150£2.4bn
- 103£7.1bn
- 102£146.5m
- 87£3.0bn
- 69£2.9bn
- 52£4.6bn
- 51£46.2bn
- 48£7.5bn
- 42£48.6m
- 41£201.2m
Finding public sector work shouldn't be hard
Make your next tender search effortless with Stotles. Set up alerts, find decision maker contacts and never miss a good-fit opportunity again.