EST SW: Novated Structural Steel Work Tender for the 30-Bed Ward Expansion at University Hospital Kerry
Details
- Topic
- Construction work
- Published
- 2 April 2025
- Submission
- 2 May 2025
- Source
- ie:e_tenders
Tender description
The project is located at University Hospital Kerry (UHK) it includes a 30-bed ward expansion on the roof of the existing hospital and relocation of existing plant to allow construction of the new ward. The 30-Bed Ward will be constructed in two (2) phases, Phase 1A and Phase 1B. Phase 1A will be a new 7-Bed Inpatient Ward to be completed by the Q4 2025. Phase 1B will be a 23-Bed Inpatient Ward to be completed by the Q3 2026. Enabling works commencing in Q3 2025 will precede the steelwork package and the main contract works. The gross floor area is 2320m². Outlined below is a list of key elements. - Vertical expansion to existing building to accommodate for a new 30-Bed Ward. - Connecting to existing structure. - Relocation of existing plant area to roof of new 30-Bed Ward. - New external cladding of the façade to align with existing. - New stair core from L1 to L2. - New external substation. - New water attenuation pond. - Works carried out within a live 24-hour 7-days a week, acute hospital campus, where key critical clinical services and facilities will remain operational through construction phase.
Timeline
- Completed: Tender published2 April 2025Current notice
- Completed: Submission date2 May 2025
About the buyer
Health Service Executive (HSE) is a public sector buyer in Ireland publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 45000000 · Construction work
- 45223210 · Structural steelworks
- 45262400 · Structural steel erection work
- 45262410 · Structural steel erection work for buildings
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@health-service-executive-hse.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@health-service-executive-hse.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@health-service-executive-hse.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@health-service-executive-hse.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@health-service-executive-hse.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@health-service-executive-hse.gov |
120 similar open tenders
See more open tenders related to EST SW: Novated Structural Steel Work Tender for the 30-Bed Ward Expansion at University Hospital Kerry.
- Open tender
Property QUDM
- Open tender
Plumpton Sports Pavilion
- Open tender
Property Works
- Open tender
Provision of Contractor Services
Related topics
Topics related to EST SW: Novated Structural Steel Work Tender for the 30-Bed Ward Expansion at University Hospital Kerry, ranked by notice volume.
- 7,803£677.1bn
Related buyers
Buyers similar to Health Service Executive (HSE).
- 34£22.3m
- 29£73.9k
- 26£2.0bn
- 25£26.1m
- 21£5.3m
- 14£55.2m
- 11£1.1bn
- 11£11.0m
- 9£886.5k
- 7£17.8m
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.