TC01345 Railway Infrastructure Term Repair & Maintenance Contract – Port of Felixstowe
Details
- Value
- £1,500,000
- Topic
- Railway and tramway locomotives and rolling stock and associated parts
- Published
- 15 February 2024
- Submission
- 8 March 2024
- Source
- uk:procontracts
Tender description
The Port of Felixstowe rail infrastructure has a length of approximately 22 kilometers, consisting of three main terminals (North, Central and South), and can accomodate trains of up to 30 standard wagon lengths. The three terminals have interconnecting roads and sidings as shown in the drawing attached. There are two roads in and out of the Port, one from Trimley and the other from Felixstowe Beach Station; both roads in and out are bi-directional single track. The Works comprise but are not limited to: 1, Patrolling, inspection, maintenance and repair of plain line, switches and crossings 2, Works to signalling equipment, electrical and mechanical assets 3, Ancillary works such as maintenance to walkways and track drainage. In order to plan and undertake essential maintenance works before an asset failure occurs, there is a requirement for regular inspections and patrolling to identify defects, take measurements and monitor degradation. Planned servicing and maintenance of assets is also required to avoid asset failure. Rail Operations run 24/7 6 days a week. Current moves are over 30 trains in and out per day which is planned to increase to over 40 per day in the future. To minimise impact on Rail Operations, an emergency callout service is required so assets that fail are quickly and efficiently repaired. Keywords: S&T, Rail Track, Rail Maintenance
Timeline
- Completed: Tender published15 February 2024Current notice
- Completed: Submission date8 March 2024
About the buyer
Hutchison Ports (UK) Limited buys for the ports of Felixstowe, Harwich and Thamesport through one procurement department. That department is based at the Port of Felixstowe. Conditions of participation and a financial check come before any invitation to tender.
Over the past 5 years, most of Hutchison Ports UK's contract awards have been in fuel and energy.
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@hutchison-ports-uk-limited.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@hutchison-ports-uk-limited.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@hutchison-ports-uk-limited.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@hutchison-ports-uk-limited.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@hutchison-ports-uk-limited.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@hutchison-ports-uk-limited.gov |
3 similar open tenders
See more open tenders related to Railway and tramway locomotives and rolling stock and associated parts.
- Open tender
Metrolink New Rolling Stock
- Open tender
Rail Haulage
Related topics
Topics related to TC01345 Railway Infrastructure Term Repair & Maintenance Contract – Port of Felixstowe, ranked by notice volume.
- 32,974£2.4tn
- 539£85.5bn
Related buyers
Buyers similar to Hutchison Ports (UK) Limited.
- 160£121.9m
- 49£44.0m
- 48£8.9m
- 47£112.6m
- 46£27.5m
- 35—
- 32£2.5m
- 30£3.4m
- 29£1.6m
- 25£3.9m
Finding public sector work shouldn't be hard
Make your next tender search effortless with Stotles. Set up alerts, find decision maker contacts and never miss a good-fit opportunity again.