Stale Pre-tender

Replacement of the ECMB Chillers

Details

Topic
Cooling and ventilation equipment
Published
12 December 2024

Tender description

The Scottish Association for Marine Science are intending to publish an ITT for a main Contractor to carry out the Replacement of the ECMB Chillers in February 2025 Lot 1: SAMS Facilities department are responsible for building maintenance and refurbishment/alteration projects on site. They have identified the need to progress with the following project and require a suitable main Contractor to undertake the works to the specification requirements. This is a lifecycle/net zero decarbonisation project: The existing cooling only chillers are to be replaced with modern high efficiency Air Source Heat Pumps which will provide cooling and heating. Main Objective; As a lifecycle/condition based replacement project which will provide another step in SAMS operational resilience and meet UK and Scottish Government Net Zero targets for decarbonisation of buildings. In order to make this project achieve maximum energy and carbon saving benefits, we have an outline specification of requirements, subject to final design by completion by M&E consultants, which includes: -Replacement of Cooling only chillers with combined heating and cooling function provides additional capability and by feeding Heating capacity into the existing fossil fuel powered LTHW system this will reduce fossil fuel usage -Low to very low GWP refrigerant and reduced quantities over existing chillers which will achieve large F-Gas Tco2e savings -Variable Speed Drive and multi compressor units to allow demand driven running (existing units are single compressor start-stop units) which provide extensive energy saving capability -Incorporation of Free cooling capacity and a thermal store to integrate with our site BMS system control to charge at most economical periods providing an additional energy saving function. -Incorporation of waste heat recovery within ASHP units to harvest all waste energy and provide further energy savings and fossil fuel use reduction -Hydraulic Simulation and optimisation of design approved through Hysopt (or equivalent) HVAC modelling software -Incorporate a Soft landings type follow up performance review/recommissioning to ensure system is operating at maximum efficiencies through year 1 and going forward thereafter -Incorporate any other innovative technology provided by suppliers as part of their procurement proposals which will enhance the benefits of the new installation Desired Outcomes; An energy efficient cooling system with all possible decarbonisation and energy reduction methods incorporated which will provide effective cooling and supplementary heating output to the ECMB wing. Installed and commissioned by end of November 2025. ITT to be issued in February 2025 with contract award before 31st March 2025

Timeline

  1. Completed: Pre-tender published12 December 2024
    Current notice

About the buyer

APUC Ltd is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.

Relevant CPV codes

  • 42500000 · Cooling and ventilation equipment

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?
Sign-up to enrich

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

Related topics

Topics related to Replacement of the ECMB Chillers, ranked by notice volume.

View all topics

Win more public sector contracts

Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.