ETFE Roofing C4 - KCSL
Details
- Value
- GBP 75,000
- Topic
- Roofing materials
- Published
- 13 September 2024
- Submission
- 20 September 2024
- Source
- uk:contracts_finder
Tender description
Kilnbridge have secured the HS2 Old Oak Common Station Works Package WP10.2 for construction of the Headhouses and Ancillary Buildings. Part of the scope requires the design, manufacture & installation of an ETFE roofing systems to one of the satellite buildings around the station complex. The ETFE roofing system is part of the scope or works to the building known as the Cycle Hub The package consists of an inclined rooflight with stressed single foil membrane which will include : - ETFE foil/film - Natural in colour with the required acceptable transparency - An Extruded Aluminium portal frame / upstand - Polyester powder coating finish to the required colour - Any pressed Metal components / accessories including gutters flashings, copings, capping reveals etc were required - Works include also mock ups, samples and quality benchmarks. The specifications and performance requirements included but not limited to are: - Architectural & Structural specifications - Various roofing and drainage specifications and standards The Sub subcontract works includes the provision of all necessary People, Equipment, Plant and Materials for the design, testing, manufacture and installation of the ETFE roof system The Subsubcontractor will be responsible for progressing the roof schedule and associated Stage 4 drawings through design for manufacture and installation. This will require submission to, and acceptance from, the Subcontractor, the Contractor's representatives and the Employer to ensure the provided Sub subcontractors design satisfies the intent prior to construction. All in accordance with the Contractors design procedure and technical assistance requirements. The scope also includes the design, supply, installation, management and removal of any temporary works required to execute the subsubcontract works and the provision of sufficient temporary protection of the finished roofing systems were required. Roof covering circa 180sqm Expected Subsubcontract award Q1 2025 Construction is to be carried out over a 2.5-year period commencing and completed in Q2 2028.
Timeline
- Completed: Tender published13 September 2024Current notice
- Completed: Submission date20 September 2024
About the buyer
High Speed Two (HS2) Ltd is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 44112500 · Roofing materials
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov |
6 similar open tenders
See more open tenders related to ETFE Roofing C4 - KCSL.
- Open tender
YPO - 000880 Building Envelope Services
- Open tender
Construction work
- Open tender
Construction work
Related buyers
Buyers similar to High Speed Two (HS2) Ltd.
- 2,698£1.7bn
- 906£19.4bn
- 691£8.8bn
- 477£15.4bn
- 433£3.8bn
- 350£20.5m
- 304£370.8m
- 263£233.9m
- 252£578.5m
- 241£10.1bn
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.