EKFB is seeking to appoint a competent sub-contractor to design, supply and install the temporary M+E package for the Green Tunnels, which includes, but is not limited to: - power supply - general and emergency lighting - firefighting system (water supply and fire main) - signage - brackets These will contribute in providing a healthy and safe environment whilst constructing 3no twin-bore cut-and-cover tunnels. The temporary M+E should be in service from the commencement of the MWCC activities inside the tunnels and will remain until the permanent M+E is installed (by others). The installation should be done in multiple visits, following the construction sequence of the tunnels. These visits should be short and efficient to ensure the disruption of other activities is minimum. Anticipated Programme Greatworth - from Jan 22 (in stages) Chipping Warden - from Sep 21 (in stages) Wendover - from Jul 22 (in stages)
Timeline
- Awarded contractThis notice (current page)
- Published
- 17 Jan 2024
- Award
- 21 Jan 2022
- End
- 31 Dec 2024
About the buyer
HS2 Ltd is a non-departmental public body sponsored by the Department for Transport, and buys as a central government agency building Britain's high-speed railway between London and Birmingham. Framework agreements cover major packages, such as the lifts and escalators for Phase One stations. Four tier-one joint-venture contractors, including EKFB and Align JV, deliver the main civils work. Those contractors procure their own tier-two subcontractors, who source further down the chain.
Over the past 5 years, most of HS2's contract awards have been in construction work, metals and mining products and transport equipment.
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov |
Related topics
Topics related to EKFB JV - Temporary mechanical and electrical systems - Tunnels, ranked by notice volume.
- 18,650£1.2tn
Related buyers
Buyers similar to High Speed Two (HS2) Ltd.
- 2,934£782.5m
- 1,193£13.9bn
- 808£8.9bn
- 526£16.1bn
- 498£4.5bn
- 435£131.6m
- 422£2.0m
- 395£434.5m
- 324£346.0m
- 279£20.2bn
Finding public sector work shouldn't be hard
Make your next tender search effortless with Stotles. Set up alerts, find decision maker contacts and never miss a good-fit opportunity again.